Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance | -31.75% | ₹2.6 L | L1 | Admitted-Finance |
| 2 | L2₹2.7 L+₹2,889.97 (1.10%)Admitted-Finance | -31.00% | ₹2.7 L+₹2,889.97 (1.10%) | L2 | Admitted-Finance |
| 3 | L3₹3.0 L+₹37,569.66 (14.3%)Admitted-Finance | -22.00% | ₹3.0 L+₹37,569.66 (14.3%) | L3 | Admitted-Finance |
| 4 | L4₹3.2 L+₹56,450.82 (21.5%)Admitted-Finance | -17.10% | ₹3.2 L+₹56,450.82 (21.5%) | L4 | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹7,720
Closing Date
29 Jun 2026, 6:00 pmClosed
Executive Engineer
Executive Engineer CCD-I NGHEP GANDERBAL
Strengthening of Burm for approach road at various spots of Main Access Road
2026_SPDC_311879_1
ENITNo02OF2026Dated08062026
Open Tender
Civil Works
Percentage
25 days
Main Access Road Ganderbal
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Chief Pay and Accounts Officer USHP-IInd Kangan
₹7,720
In the Office of Executive Engineer
9 Jul 2026
9 Jun 2026
1 Jul 2026
9 Jun 2026
29 Jun 2026
9 Jun 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Details | |||||
| 1.01 | Preparation of subgrade by excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters. | 900 | Sqm | 153 | ₹1,37,700 |
| 2.01 | Supplying and stacking at site stone aggregate 90-45 mm GI. | 67.5 | Cum | 1,204.15 | ₹81,280.13 |
| 3.01 | Supplying and stacking at site stone screening of size 13.2 mm nominal size(Type A). | 27 | Cum | 1,204.15 | ₹32,512.05 |
| 4.01 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. | 94.5 | Cum | 768.15 | ₹72,590.18 |
| 5.01 | slip clearance of side drains In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. | 39.3 | Cum | 331.15 | ₹13,014.19 |
| 6.01 | Carriage by Mechanical Transport including loading ,un-loading and stacking of stone aggregates lead of 20 km. | 67.5 | Cum | 445.64 | ₹30,080.7 |
| 7.01 | Carriage by Mechanical Transport including loading ,un-loading and stacking of stone aggregates (screening) lead of 20 km. | 27 | Cum | 409.94 | ₹11,068.38 |
| 8.01 | Carriage by Mechanical Transport including loading ,un-loading and stacking of slip clearance material av lead 3 km. | 39.3 | Cum | 180.26 | ₹7,084.22 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
SBD.pdf
Tender Documents • 1.18 MB
BOQ_1009684.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .