Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9,540.42Admitted-Finance | -39.03% | ₹9,540.42 | L1 | Admitted-Finance |
| 2 | L2₹10,432.34+₹891.92 (9.35%)Admitted-Finance | -33.33% | ₹10,432.34+₹891.92 (9.35%) | L2 | Admitted-Finance |
| 3 | L3₹11,380.59+₹1,840.17 (19.3%)Admitted-Finance | -27.27% | ₹11,380.59+₹1,840.17 (19.3%) | L3 | Admitted-Finance |
| 4 | L4₹11,563.67+₹2,023.25 (21.2%)Admitted-Finance | -26.10% | ₹11,563.67+₹2,023.25 (21.2%) | L4 | Admitted-Finance |
| 5 | L5₹11,735.80+₹2,195.38 (23.0%)Admitted-Finance | -25.00% | ₹11,735.80+₹2,195.38 (23.0%) | L5 | Admitted-Finance |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
16 Jul 2026, 6:00 pmClosed
Executive Engineer CMD SVP
Kangan
Clearance of Catch water drains around Penstock power house and repairing to side walls.
2026_SPDC_313575_3
07 of 2026-27 dated 24.06.2026
Open Tender
Civil Works
Percentage
30 days
Sumbal Kangan
Please Refer tender documents
2 documents required · 2 mandatory
₹235
CPAO USHP II Kangan
₹6,000
Divisional Office
22 Jul 2026
26 Jun 2026
18 Jul 2026
26 Jun 2026
16 Jul 2026
26 Jun 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.all kinds of soil. | - | Cum | 592.9 | - |
| 2 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah | - | Cum | 5,402.9 | - |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | - | Sqm | 286.35 | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum | 6,591.25 | - |
| 5 | Cement Avg Lead 5 Kms | - | MT | 178.43 | - |
| 6 | Aggregrate Avg lead 10 km by mt | - | Cum | 279.04 | - |
| 7 | Sand Avg lead 40 km by mt | - | Cum | 630.74 | - |
| 8 | Stone Avg lead 40 km by mt | - | Cum | 741.91 | - |
| 9 | Head load Cement upto 100m lead | - | MT | 168.01 | - |
| 10 | Head load Aggregrate Upto 100m lead | - | Cum | 244.36 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_1015527.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .