Loading…
Loading…
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
16 Jul 2026, 6:00 pm
Executive Engineer CMD SVP
Kangan
Repair Reconstruction of damaged PCC lining bed and baffle blocks of Super passage Rayil and protection works from Gund Nallah
2026_SPDC_313575_2
07 of 2026-27 dated 24.06.2026
Open Tender
Civil Works
45 days
Sumbal Kangan
refer tender documents
2 documents required · 2 mandatory
₹615
CPAO USHP II Kangan
₹24,000
Divisional Office
26 Jun 2026
26 Jun 2026
18 Jul 2026
26 Jun 2026
16 Jul 2026
26 Jun 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: ordinary rock | - | Cum | 392.8 | - |
| 2 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 1 | Sqm | 286.35 | ₹286.06 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kgs | 123.2 | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum | 7,104.35 | - |
| 5 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:3:6 or richer mix (i/c equivalent design mix) | 1 | Cum | 1,725.2 | ₹1,723.47 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum | 6,591.25 | - |
| 7 | Providing and laying soling stone including carraige all complete as per direction of Engineer in charge. | 1 | Cum | 1,000 | ₹999 |
| 8 | Shingle clearance from canals. | - | Cum | 148 | - |
| 9 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50m and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | - | Cum | 187.3 | - |
| 10 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinic+PVC coated, Mesh wire diameter2.7/3.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm (ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge. | 1 | Cum | 3,350.85 | ₹3,347.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_1015524.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid