Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.8 LAdmitted-Finance | -35.11% | ₹9.8 L | L1 | Admitted-Finance |
| 2 | L2₹10.1 L+₹39,240.58 (4.02%)Admitted-Finance | -32.50% | ₹10.1 L+₹39,240.58 (4.02%) | L2 | Admitted-Finance |
| 3 | L3₹10.5 L+₹75,624.56 (7.75%)Admitted-Finance | -30.08% | ₹10.5 L+₹75,624.56 (7.75%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Technically Not Qualified |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
27 Jun 2026, 1:00 pmClosed
Executive Engineer CMD PDC Udhampur
Executive Engineer CMD PDC Udhampur
Construction of Pipe Culvert along with concreting of eroded patches on Headworks Road of CHEP I
2026_SPDC_311472_2
eNIT 05 of 2026-27
Open Tender
Civil Works
Percentage
60 days
Chenani
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,800
CPAO Jammu
₹30,000
Office of Chief Engineer CIandD Wing JKPDC Jammu
16 Jul 2026
6 Jun 2026
30 Jun 2026
6 Jun 2026
27 Jun 2026
6 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:
In cement mortar | 24.37 | Cum | 1,740.45 | ₹42,414.77 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 84.32 | Cum | 7,275.25 | ₹6,13,449.08 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters | 35.55 | Sqm | 628.95 | ₹22,359.17 |
| 4 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. NP3
1200 mm dia. R.C.C. pipe (laying by manual/mechanical means) | 10 | meter | 7,317.45 | ₹73,174.5 |
| 5 | Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete
300 mm dia. R.C.C. pipe | 12 | meter | 837.55 | ₹10,050.6 |
| 6 | Stone Boulder 50 mm to 200 mm (For Soling on Road) | 19.13 | Cum | 665 | ₹12,721.45 |
| 7 | Stone Aggregate (Single size) 40 mm nominal size (Crushed) for Potholes filling. | 258.3 | Cum | 1,197 | ₹3,09,185.1 |
| 8 | Supply of Stone Dust for Potholes filling. | 110.7 | Cum | 1,024 | ₹1,13,356.8 |
| 9 | Supply of Galavanised wire mesh of average width of aperture 1.4 mm and nominal dia. of wire 0.63 mm | 486.96 | sqm | 332.5 | ₹1,61,914.2 |
| 10Carriage of Materials by Mechanical Transport: | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
SBDW2.pdf
Other Document • 0.54 MB
BOQ_1008514.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .