Loading…
Loading…
Tender Value
₹16 L
EMD Value
₹32,000
Closing Date
10 Jul 2026, 6:00 pmDue tomorrow
Executive Engineer CCD Kupwara
Executive Engineer CCD Kupwara
Construction of New security quarter/gate post for safe guard of new power House.
2026_SPDC_314136_1
E-NIT 06 OF 2026
Open Tender
Civil Works
120 days
Karnah Kupwara
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
Chief pay and Accounts Officer JKPDC
₹32,000
Office of the Chief Engineer CI and D Wing Bemina
1 Jul 2026
1 Jul 2026
11 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 26.13 | Cum | 592.9 | ₹15,492.48 |
| 2 | Providing and laying of dry stone soling hand packed. | 14.49 | Cum | 1,100 | ₹15,939 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 5.89 | Cum | 5,733.6 | ₹33,770.9 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 22.58 | Cum | 6,540.45 | ₹1,47,683.36 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand). | 19.02 | Cum | 7,571.55 | ₹1,44,010.88 |
| 6 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 19.02 | Cum | 1,455.65 | ₹27,686.46 |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts andstruts upto floor five level including curing but excluding cost of centering shuttering,finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 7.51 | Cum | 9,395.7 | ₹70,561.71 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiralstair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 19.64 | Cum | 9,821.85 | ₹1,92,901.13 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 96.74 | Sqm | 286.35 | ₹27,701.5 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platforms. | 61.73 | Sqm | 718.2 | ₹44,334.49 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
sbd06.pdf
Tender Documents • 0.27 MB
BOQ_1017116.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid