| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAdmitted-Finance | ₹6.6 L | L1 | Admitted-Finance |
| 2 | L2₹8.7 L+₹2.1 L (32.4%)Admitted-Finance 15 NEW IDDGAH BUILDINGS NH BARAMULLA BARAMULLA JAMMU KASHMIR 193101 | BARAMULLA | JAMMU AND KASHMIR | 193101 | ₹8.7 L+₹2.1 L (32.4%) | L2 | Admitted-Finance |
| 3 | L3₹9.1 L+₹2.5 L (38.7%)Admitted-Finance SARCH GANDERBAL J K 191131 | GANDERBAL | JAMMU AND KASHMIR | 191131 | ₹9.1 L+₹2.5 L (38.7%) | L3 | Admitted-Finance |
| 4 | L4₹9.2 L+₹2.6 L (39.9%)Admitted-Finance | ₹9.2 L+₹2.6 L (39.9%) | L4 | Admitted-Finance |
| 5 | L5₹9.3 L+₹2.8 L (42.1%)Admitted-Finance BAGH I ALI MARDAN KHAN NOWSHERA SRINAGAR J K 190011 | SRINAGAR | JAMMU AND KASHMIR | 190011 | ₹9.3 L+₹2.8 L (42.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S P.M.T INDUSTRIES L5 | NSCOO ENGINEERING PRIVATE LIMITED L2 | NEW AHANGER ENGINEERING WORKS L3 | Asif Engineering Works L4 | GHULAM MOHI UDDIN DAR L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Removing old paint by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete as per IS 14177 : 1994 | 3,847.28 | sq.mtr | 40 ₹1,53,891.2 | 5 ₹19,236.4 Lowest | 15 ₹57,709.2 | 100 ₹3,84,728 | 13 ₹50,014.64 |
| 2.00 | Fabrication and dismantling and moving of steel platform in the space between the stop log gate and spillway/under sluice gate so as to enable the painting of the gates (the material for the same available at site). The job includes lowering and raising of stop log gates with the help of gantry crane installed | 1 | job | 1,00,000 ₹1,00,000 | 15,000 ₹15,000 Lowest | 49,000 ₹49,000 | 39,500 ₹39,500 | 25,000 ₹25,000 |
| 3.00 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven storey height made with 40 mm dia M.S. tube 1.5 m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffoldings for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. | 126 | sq.mtr | 793 ₹99,918 | 200 ₹25,200 | 260 ₹32,760 | 700 ₹88,200 | 55 ₹6,930 Lowest |
| 4.00 | Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete On Hydraullic gates as per IS 14177 : 1994. The paint has to be applied with the help of with airless spray equipment. Spray guns should be suited to the type of paint being used and should be operated with orifices, nozzles and air pressure suited to the type of paint and its consistency. Each coat should give a minimum dry film thickness of 150 + 5 microns. The total dry film thickness of all the coats including primer coating should not be less than350 microns as per IS 14177 : 1994 | 3,847.28 | sq.mtr | 150 ₹5,77,092 | 210 ₹8,07,928.8 | 200 ₹7,69,456 | 105 ₹4,03,964.4 Lowest | 149 ₹5,73,244.72 |
Tender Value
₹10.1 L
EMD Value
₹20,260
Closing Date
13 Jun 2026, 4:00 pmClosed
Executive Engineer
Executive Engineer GD LJHP
Epoxy painting of all the under sluice and Spillway Gate leafs at Barrage of LJHP Baramulla.
2026_SPDC_310476_1
NIT no. 06 of 2026-27 dated 20-05-2026
Open Tender
Miscellaneous Works
Item Rate
60 days
Gantmulla Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Chief Pay And Accounts Officer Baramulla
₹20,260
Yes
Online
23 Jul 2026
21 May 2026
15 Jun 2026
21 May 2026
13 Jun 2026
30 May 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing old paint by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete as per IS 14177 : 1994 | - | sq.mtr | - | - |
| 2 | Fabrication and dismantling and moving of steel platform in the space between the stop log gate and spillway/under sluice gate so as to enable the painting of the gates (the material for the same available at site). The job includes lowering and raising of stop log gates with the help of gantry crane installed | - | job | - | - |
| 3 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven storey height made with 40 mm dia M.S. tube 1.5 m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffoldings for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. | - | sq.mtr | - | - |
| 4 | Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete On Hydraullic gates as per IS 14177 : 1994. The paint has to be applied with the help of with airless spray equipment. Spray guns should be suited to the type of paint being used and should be operated with orifices, nozzles and air pressure suited to the type of paint and its consistency. Each coat should give a minimum dry film thickness of 150 + 5 microns. The total dry film thickness of all the coats including primer coating should not be less than350 microns as per IS 14177 : 1994 | - | sq.mtr | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
TDforpaintingofhydraullicgates.pdf
Tender Documents • 1.19 MB
BOQ_1004317.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .