Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.0 LAdmitted-Finance | +25.00% | ₹15.0 L | L1 | Admitted-Finance |
| 2 | L2₹15.4 L+₹36,028.87 (2.40%)Admitted-Finance | +28.00% | ₹15.4 L+₹36,028.87 (2.40%) | L2 | Admitted-Finance |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
27 Jul 2026, 2:00 pmClosed
Executive Engineer CMD SVP
Kangan
Facelifting of Power House USHP-I Sumbal including clearance of bushes and repairing of road and other allied works
2026_SPDC_313575_4
07 of 2026-27 dated 24.06.2026
Open Tender
Civil Works
Percentage
50 days
Sumbal Kangan
Refer tender documents
2 documents required · 2 mandatory
₹620
CPAO USHP II Kangan
₹24,000
Divisional Office
29 Jul 2026
26 Jun 2026
28 Jul 2026
26 Jun 2026
27 Jul 2026
26 Jun 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Enganging of JCB for clearance of site including mulba, excess deposit vegtation etc all complete as per direction of engineer Engineer | - | Hour | 1,678 | - |
| 2 | Supplying and stacking at siteGraded crushed stone aggregate of size 63mm to45 mm | 1 | Cum | 1,204.15 | ₹1,202.95 |
| 3 | Supplying and stacking at siteGraded crushed stone aggregate of size90 mm to45mm | - | Cum | 1,204.15 | - |
| 4 | Supplying and stacking at site Stone screening of size 11.2 mm nominal size (Type B) | 1 | Cum | 1,204.15 | ₹1,202.95 |
| 5 | Supplying and stacking at site Moorum | - | Cum | 668.95 | - |
| 6 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. | 1 | Cum | 768.15 | ₹767.38 |
| 7 | Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared. | - | Sqm | 6.35 | - |
| 8 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge | - | Cum | 1,885.95 | - |
| 9 | Providing and applying tack coat using hot straight run bitumen of grade – VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On W.B.M. @ 0.75 Kg/sqm. | - | Sqm | 74.35 | - |
| 10 | Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as 25 mm compacted thickness with bitumen of grade VG- 10 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. | - | Sqm | 293.1 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_1015530.xls
BOQ • 0.28 MB
corrigendumsvp.pdf
PDF • 0.11 MB
corrigendumfl.pdf
PDF • 0.52 MB
cornit7.pdf
PDF • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .