Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹91.3 L
EMD Value
₹9.1 L
Closing Date
25 Nov 2026, 11:00 am
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE OFFICER
NAGAR PANCHAYAT OEL DHAKHWA
WORK-1-MOHALLA KABADIYANTOLA ME PUMP NUMBER-1 KE PAAS DUKANO KA NIRMAN KARYA
2026_DOLBU_1205035_1
391/NPOEL/2026-27 DT-03-11-2026
Open Tender
Civil Works
Percentage
90 days
OEL DHAKHWA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
EXECUTIVE OFFICER
₹9.1 L
4 Nov 2026
4 Nov 2026
25 Nov 2026
4 Nov 2026
25 Nov 2026
4 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork exavation in foundatrion as per DSR 2.8.1 | 61.12 | cum | 189 | ₹11,551.68 |
| 2 | Earth in Embankment in ordinary soil i/c lead 30mt. & lift 1.50 mt. As per DSR 2.25(a) | 239.7 | cum | 510 | ₹1,22,248.09 |
| 3 | Providing & Laying cement concreet in 1:4:8 40mm gauge stone ballast etc. As per DSR 4.1.8 | 96.44 | cum | 4,960 | ₹4,78,342.4 |
| 4 | Ist class brick work in 1:4 cement & coarse sand mortar in foundation and plinth including supply of all materials, labour, T&P etc. required for proper completion of the work. DSR-6.1.1 | 56.2 | cum | 5,366 | ₹3,01,546.71 |
| 5 | Providing & Laying cement concrete 1:2:4 cement C-sand and 20mm gauge stone grit etc. As per DSR (4.1.3) | 42.69 | cum | 5,736 | ₹2,44,887.28 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).As per DSR 5.3 | 140.23 | cum | 8,377 | ₹11,74,694.68 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. &above plinth level. As per DSR 5.22.6 | 16,511.91 | Kg | 78.5 | ₹12,96,185.2 |
| 8 | centering and shuttring beam As perDSR 5.9.5 | 290.76 | Sqm | 536 | ₹1,55,847.36 |
| 9 | centering and shuttering foundation DSR-5.9.1 | 14.4 | Sqm | 285 | ₹4,104 |
| 10 | centering and shuttring colomn As per DSR 5.9.6 | 194.37 | Sqm | 699 | ₹1,35,864.35 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.57 MB
BOQ_2282954.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .