| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.7 LAccepted-AOC | L1 | Accepted-AOC HENCE L1 | |
| 2 | L2₹56.0 L+₹4.3 L (8.27%)Rejected-AOC EDARIKODE GRAMA PANCHAYAT EDARIKODE PO MALAPPURAM | MALAPPURAM | KERALA | 676501 | L2 | Rejected-AOC L2 | |
| 3 | L3₹57.4 L+₹5.7 L (11.1%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹57.8 L+₹6.1 L (11.8%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹57.9 L+₹6.2 L (12.0%)Rejected-AOC POOKKATH HOUSE ULLANAM P O KOLATHINGAL CHERANANGADI MALAPPURAM 676303 | MALAPPURAM | MALAPPURAM | KERALA | 676303 | L5 | Rejected-AOC L5 |
Tender Value
₹66.0 L
EMD Value
₹50,000
Closing Date
27 Jun 2023, 6:00 pmClosed
E P Balakrishnan
O O the Executive Engineer B1 Block Civil Station MI Division Malappuram
GENERAL-MI CLASS 1-Construction of VCB across Moozhikkal thodu at Kalathingalpara in Mooniyoor Grama Panchayath, Vallikkunnu Constituency Malappuram District General Civil Work
2023_Irrig_582990_1
IRR/IA/TR/8778/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
Moonniyur
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
₹50,000
14 Aug 2023
20 Jun 2023
30 Jun 2023
20 Jun 2023
27 Jun 2023
20 Jun 2023
Amount
Construction of vcb
60.1.1:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete.
60.2.3:Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.64.2:Coconut Pile - Supplying and stacking well matured 1/2 split and straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete.
60.64.5:Coconut Pile- Driving down half split coconut pile to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end
60.7.4:DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
ABDULLATHEEF
FAHIZ M K
ABDUL AZEEZ EK
P HAMZA HAJI
SURVEXINFRA PRIVATE LIMITED
AP Aboobacker
Bidder Name
AP Aboobacker
ABDUL AZEEZ EK
MOHAMMED SHIBIL PM
SURVEXINFRA PRIVATE LIMITED
ABDULLATHEEF
FAHIZ M K
P HAMZA HAJI
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .