Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2,241
Closing Date
12 Jun 2026, 5:00 pm7d left
Assistant Executive Engineer
ASSISTANT EXECUTIVE ENGINEER,KPIP HEADWORKS SUBDIVISION NO.3,KANHIRAPUZHA
GENERAL KPIP MP Monsoon Preparedness (River) 2026-27 Cutting of Trees posing Danger and Levelling up debris and Sand/silt accumulated along Kanjirapuzha River - D/S from Pichalamunda Causeway to Chooriyode for smooth flow of flood water Gene
2026_Irrig_853898_1
IRR/PI/TR/3055/2026_5_1_1/1
Open Tender
Civil Works - Others
180 days
Kahirapuzha
Please refer Tender documents.
11 documents required · 11 mandatory
₹555
₹2,241
2 Jun 2026
2 Jun 2026
15 Jun 2026
2 Jun 2026
12 Jun 2026
2 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Monsoon preparedness | ||||||
| 1.001 | OD5322/2026-2027:Excavation For Levelling Up Sand/Silt/Debris Deposit Using a Hydraulic Excavator Including Cutting , Trimming Bottom And Side Slopes, In Accordance With Requirements Of Lines, Grades And Cross Sections, And Transporting To The Nearby Dips Within All Lifts And Lead Upto 1000m. | - | hour | - | - | BI01010001010000000000000515BI0100001114 |
| 2Cutting Trees and Branches of dangerous life and Property | ||||||
| 2.001 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | - | - | BI01010001010000000000000515BI0100001116 |
| 2.002 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - | BI01010001010000000000000515BI0100001117 |
| 2.003 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | - | each | - | - | BI01010001010000000000000515BI0100001118 |
| 2.004 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | - | each | - | - | BI01010001010000000000000515BI0100001119 |
| 2.005 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | - | each | - | - | BI01010001010000000000000515BI0100001120 |
| 2.006 | 2.33.4:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth | - | each | - | - | BI01010001010000000000000515BI0100001121 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.65 MB
BOQ_1443103.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid