Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-AOC | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | SARAVANADAS.P L1 |
|---|---|---|---|---|
| 1.00Building construction | ||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 121.67 | cum | 244.75 ₹29,779.71 Lowest |
| 1.00 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 2.66 | cum | 8,609.53 ₹22,892.74 Lowest |
| 1.00 | OD308992/2025-2026:Dry rubble masonry without concrete levelling course masonry with good quality blasted rubble, etc., complete | 25.52 | cum | 2,446.27 ₹62,428.81 Lowest |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 10.49 | cum | 7,926.32 ₹83,123.32 Lowest |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.57 | cum | 9,465.73 ₹43,248.92 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 435.84 | kilogram | 106.81 ₹46,552.07 Lowest |
| 1.01 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 14.42 | cum | 7,327.86 ₹1,05,697.05 Lowest |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.88 | cum | 12,770.03 ₹11,224.86 Lowest |
| 1.01 | OD309010/2025-2026:Supplying and fixing PVC door of Size 0.75x 2.10 m or nearest available size etc, as per the direction of dept. officer at site. | 4 | each | 2,537.88 ₹10,151.52 Lowest |
Tender Value
₹9.3 L
EMD Value
₹23,290
Closing Date
14 Nov 2025, 12:00 pmClosed
ASSISTANT ENGINEER
LSGD SUB DIVISION, DEVIKULAM
DEVIKULAM BP 259/2025-26 VAGUVARA FACTORY DIVISION ALP SCHOOL TOILET CONSTRUCTION
2025_LSGD_810796_5
10/AE/LLSGD/DKLM/2025-26
Open Tender
Civil Works - Buildings
Item Rate
120 days
DEVIKULAM
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,055
Yes
₹23,290
Yes
23 May 2026
6 Nov 2025
17 Nov 2025
6 Nov 2025
14 Nov 2025
6 Nov 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1373728.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
factoryALPSBD.pdf
Tender Documents • 1.89 MB
BOQ_1373728.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .