Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.6 LAdmitted-Fee/PreQual/Technical/Finance | -25.33% | ₹14.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹17.0 L+₹2.4 L (16.4%)Admitted-Fee/PreQual/Technical/Finance | -13.05% | ₹17.0 L+₹2.4 L (16.4%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹21.0 L+₹6.4 L (44.0%)Admitted-Fee/PreQual/Technical/Finance | +7.49% | ₹21.0 L+₹6.4 L (44.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹21.0 L+₹6.5 L (44.4%)Admitted-Fee/PreQual/Technical/Finance | +7.86% | ₹21.0 L+₹6.5 L (44.4%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹25.6 L+₹11.0 L (75.4%)Admitted-Fee/PreQual/Technical/Finance | +31.00% | ₹25.6 L+₹11.0 L (75.4%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹19.5 L
EMD Value
₹39,500
Closing Date
1 Aug 2026, 3:00 pmClosed
SE(RT)
51, CGR ROAD, kOLKATA-43
Temporary Bamboo Walkway (XXIV) at Basin Complex of Shore Based Pilot Station at Sagar Island, South 24 Parganas for the year 2026-2027.
2026_KoPT_916825_1
RT/TN/26-27/03 dt 10.07.2026
Open Tender
Civil Works
Percentage
49 days
Sagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Yes
Payable To SMPK
₹39,500
Yes
3 Aug 2026
10 Jul 2026
3 Aug 2026
10 Jul 2026
1 Aug 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed. 10 cm av. diameter.
Note: Diameter of pile to be measured at a distance of 1.5 meter from the thicker end. | 370 | Per Mtr. | 142.99 | ₹52,906.3 |
| 1.02 | Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed.. 12.5 cm av. diameter.
Note: Diameter of pile to be measured at a distance of 1.5 meter from the thicker end. | 4,000 | Per Mtr. | 215.98 | ₹8,63,920 |
| 2.01 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. 10 cm av. diameter.
Note: Payment to be made on the basis of length driven into the ground. Diameter to be measured at 1.5 meter from the thicker end. | 20 | Per Mtr. | 122.13 | ₹2,442.6 |
| 2.02 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. 12.5 cm av. diameter.
Note: Payment to be made on the basis of length driven into the ground. Diameter to be measured at 1.5 meter from the thicker end. | 2,100 | Per Mtr. | 135.37 | ₹2,84,277 |
| 3 | Coal tarring on wooden surfaces including cost of materials. Single coat. | 1,800 | Per Sqm | 34.18 | ₹61,524 |
| 4 | M.S. works in bolts and nuts of different sizes fitted and fixed in position including cost of labour and materials. | 250 | Per Kg | 106.24 | ₹26,560 |
| 5 | Strong bamboo posts, posts plates, rafters, ties etc. fitted and fixed complete with coir rope or nails as directed. (Embedded portion of posts shall also be paid for against this item cost of digging hole and repacking being paid for separately) – 75 mm dia bamboo. | 2,850 | Per Mtr. | 85.32 | ₹2,43,162 |
| 6 | Half bamboo runners (made from 75 mm dia stout bamboo) and fitting fixing in positions with country made rose headed nails. | 4,400 | Per Mtr. | 58.02 | ₹2,55,288 |
| 7 | Labour for fitting and fixing 10 cm. to 13 cm. diameter Sal bullah/ Eucalyptus-bullah as ties and runners including necessary nails, bolts and nuts. | 600 | Per Mtr. | 30.38 | ₹18,228 |
| 8 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) | 650 | Per Mtr. | 34.25 | ₹22,262.5 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 11.76 MB
BOQ_963502.xls
BOQ • 0.31 MB
NIT.pdf
Tender Documents • 11.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .