Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
29 Dec 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGM(P AND P)
ASSISTANT GENERAL MANAGER PROJECTS AND PLANNING PD ADMINISTARTION FACT
Cleaning of cooling tower in Thermal Plants I and II -2026-27
2025_FACT_889770_1
3103/2025-2026/E32683
Limited
Miscellaneous Works
Item Rate
365 days
UDYOGAMANDAL, FACT
LIMITED TENDER
5 documents required · 5 mandatory
₹0
Yes
30 Dec 2025
13 Dec 2025
30 Dec 2025
13 Dec 2025
29 Dec 2025
13 Dec 2025
Cleaning of cooling tower in Thermal Plants I & II -2026-27
Cleaning the basins, Sump pits and top hot water basins of PD-CPP cooling tower ( three cells in PD side only). The scope of work includes removal of fine particles and rubbish from the hot water basin, removal of algae from the inner side walls and structure of the cooling tower, removal of vegetation from the outer of side walls , removal of mud and slurry from the floor, removal of any other unwanted materials etc. by manual or mechanical means including all charges for labour, rent for tools and tackles etc. to the satisfaction of the officer/Engineer-in-charge. The final removal of the slurry/mud remaining inside the cooling water pump sump has to done using suitable slurry pumps.
Cleaning the basins, Sump pits and top hot water basins of AC-CPP cooling tower ( one cell in Ammonia Complex side only). The scope of work includes removal of fine particles and rubbish from the hot water basin, removal of algae from the inner side walls and structure of the cooling tower, removal of vegetation from the outer of side walls , removal of mud and slurry from the floor, removal of any other unwanted materials etc. by manual or mechanical means including all charges for labour, rent for tools and tackles etc. to the satisfaction of the officer/Engineer-in-charge.The final removal of the slurry/mud remaining inside the cooling water pump sump has to done using suitable slurry pumps.
The scope of the work includes the rental arrangement of slurry pumps for the removal of the final slurry/sediments remaining inside the cooling water pump sump, after cleaning of the cooling tower basin for both the AC CPP and PD CPP towers. All the necessary accessories required for the same has to be ensured by the contractor. Supply connection shall be provided by FACT free of cost.
K R OMANAKUTTAN (BID ID -3337953)
GOPAKUMAR E A (BID ID -3341369)
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_935211.xls
BOQ • 0.25 MB
TERMSANDCONDITIONS.pdf
Tender Documents • 13.16 MB
complie32683.pdf
Additional Documents • 2.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .