Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC 110 5 BONOMALI NASKAR ROAD BEHALA PARNASHREE PARNASHREE KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹3.9 L+₹5,705.43 (1.50%)Rejected-AOC 19 VIVEKANANDA SARANI P O SODEPUR KOLKATA 700110 PS KHARDAH | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700110 | L2 | Rejected-AOC HIGHER THAN L1 | |
| 3 | L3₹3.9 L+₹13,312.67 (3.50%)Rejected-Finance MOINADANGA CHINSURAH HOOGHLY 712102 | CHINSURAH | HOOGHLY | WEST BENGAL | 712102 | L3 | Rejected-Finance HIGHER THAN L1 |
Tender Value
₹3.8 L
EMD Value
₹7,700
Closing Date
5 Mar 2026, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DG(S_D)
5.S.N.BANERJEE ROAD
Clog cleaning operation of submersible pump units with other allied works at Trenching Ground L S under GRBU (S_D).
2026_KMC_1008869_1
KMC/GRBU/HJ-15/25-26
Open Tender
Support/Maintenance Service
Percentage
153 days
grbu
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹7,700
20 Aug 2026
25 Feb 2026
9 Mar 2026
25 Feb 2026
5 Mar 2026
25 Feb 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clog cleaning operation of pump units at Trenching Ground LS by lifting and withdrawing the submersible pumps from sump chamber under the road and there after moving the pump inside the pump house after disconnection of power cable from pump starter and keeping it in a safe position taking all safety measure. Installation and commissioning of pump after proper alignment, to its original position, including reconnection of electrical cable complete in all respect as per direction of EIC.
Considering 3 nos pum, 6nos operation done per month
Total operation done for five months
=3x6x5=90nos.
Cost per operation=(Mech.2noxRs.326+Helper 4noxRs.270+ Methor Mazdoor 7noxRs.296)
=3804.00
=Rs.3804x1.1(including Agency profit 10%)
=Rs.4184.40(For one operation)
Rate from PWD plumbing schedule,2017,(pageno,113,C.III.4) | 90 | number | 4,184.4 | ₹3,76,596 |
| 52 | Sub Total | - | - | - | - |
| 54 | CESS 1% | 1 | Nos | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
td1.pdf
Tender Documents • 0.88 MB
BOQ_2476534.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .