Tender Value
₹11.0 L
EMD Value
₹11,000
Closing Date
7 Sept 2026, 6:00 pm
PRAVINBHAI HADIYAL
Clour Work on Curbing, Central verge at CTM Area, Sureliya Area Diff. TPRoad And Other places in indrapuri ward South Zone. (ARC TENDER).
339951
E Tender Notice No.5/2026-27 T No.219
Open
Civil - All
Works
Ahmedabad
₹900
MUNICIPAL COMMISSIONER, AHMEDABAD
₹11,000
29 Aug 2026
29 Aug 2026
29 Aug 2026
7 Sept 2026
29 Aug 2026
Name of work: - Clour Work on Curbing, Central verge at CTM Area, Sureliya Area Diff. TP
Road And Other places in indrapuri ward South Zone. (ARC TENDER).
Tender Fee Rs.900.00
Earnest Money Rs.
Contractor’s Name & Address :
MEMORANDUM OF WORK IN BRIEF
Clour Work on Curbing, Central verge at CTM Area,
1. Name of Work
Sureliya Area Diff. TP Road And Other places in
indrapuri ward South Zone. (ARC TENDER).
Rs.10,98,498.49 (exclusive of GST). GST will be paid extra by
2. Tender Estimated Cost
AMC/Authority at prevailing rate to the contractor.
1% of the Tender Cost in the form (D.D./Pay Order / Local Micr
3. Earnest Money
4 Tender Fee Rs Demand Draft of Rs.900.00
6. Time-Limit 12 months
7. Validity Period 120 Days
(i) Last Date of Submission of the
a) In Sealed cover in duplicate copies by Registered Post A.D,
(ii) Mode of Sending or by Courier. or hand delivery
b) Tender sent by ordinary post will be rejected outright.
(iii) Description essential to be
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in
The Price bid shall be submitted online only.
Schedule of Quantities and Rates It shall not be submitted Physically.
Place of Submission & Opening of To be intimated after technical bid evalution to Assistant Manager/
9. Dy.C.E.(S/Z) office, 2nd Floor, South Zone Office, Opp. Fire
Station, Maninagar, Ahmedabad-380008.
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and
10. Penalty Due to Delay of work
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders amounting
above 30 Lakhs) but not more then 10% of bill
11. Defect Liability As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound
to start the works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for the
same. Failure of comply to start the works in 48 hours of intimation
as above by contractor the contractor shall be levied penalty of (1)
12. Time permitted to start parts of work
Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
30 Lakhs). Three times failures by contractor shall make
contractor responsible to be black listed unless and otherwise
justified properly in writing / binding within 15 days of last notice of
13. GST bwsc ftuLx[t¾xhlu «J<obtl GST yjd&e åþfJJtbtk ytJNu
The staff of the contractor shall wear safety jackets,
shoes, helmets etc. while on duty and any violation will
attract a fine of Rs. 5,000/- for each incident.
14. Safety Failure to erect safety signage or trying to carry out
the works without proper precautions/safety measures as
required will attract a fine of Rs. 5,000/- for each incident.
Contractor's Sign Add.C.E.(SZ)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT (South ZONE)
Name of Work :-Clour Work on Curbing, Central verge at CTM Area, Sureliya Area Diff. TP Road And
Other places in indrapuri ward South Zone. (ARC TENDER).
Ahmedabad Municipal Corporation
Engineering Department
Name Of Work:-Clour Work on Curbing, Central verge at CTM Area, Sureliya Area Diff. TP Road And Other places
in indrapuri ward South Zone.
Item Quantity Unit Rate Amount
Dismantling the following including loading, unloading and
disposal of unserviceable material for all lead or as directed
1 by Engineer-In-Charge and stacking the serviceable
material and backfilling the resulting trenches and pits
a central verge -kerb stone 50.00 Rmt 8.00
Dismantling tiled or stone floors laid in mortar including
b stacking of serviceable material and disposal of uservicalble 50.00 Smt 27.44
material with all lead and lifts.
Demolition & disposal of unservisable material with all lead
and lift for unreinforeced concrete. (AMC sor)
Demolition of brick work & stone masonry including
stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift (1) In cement
Demolition including stacking of serviceable materials and
e disposal of unserviceable materials with all lead and lift. (I) 50.00 Cmt 604.74
Extra rate over item of excavation of earth for excavation
of asphalt pavement / RCC of thickness up to 0.20 meter
including demolishing the asphalt carpet, metal,s
oiling/cutting Reinforcement etc.comp. with stacking the
material as directed. (Based on Previously approved rate by
a up to 0.20 meter thickness (By Manual) 50.00 Smt 71.10
0.20 to 0.30 meter (By any type of Breaker Machine or
b R.C.C.Cutter machine including cost of operator, fuel, & 50.00 Smt 177.76
transportation etc complete.
0.30 meter & above (By any type of Breaker Machine or
c R.C.C.Cutter machine including cost of operator, fuel, & 50.00 Smt 311.08
transportation etc complete.
Barricading the entire break down or excavated area on
rental basis using wooden ballies / M.S.angles at max.
meter centre to centre, C.G.I. Sheet, reflective paint /
Board out side to avoid accident & for smooth traffic
diversion & movement including cautionary board etc.
Item also includes for making temporary sufficient nos of
lighting arrangement through out the work with necessary
required arrangement. ..The same shall be removed after
completion of work. (Only for break down work from start
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 200 Mt.lead
Conveyance charge of earth, lime, murrum, building
rubbish, manure, garbage, sludge, excavated rock, fly ash,
aggregates of any kind executed outside the road site. Rate
also includes spreading & levelling etc complete. Internal
conveyance above 50 mt done within the work site is not
a a) Lead up to 1 Km. 10.00 Cmt 23.38
b b) Lead From 1Km to 2 Km. 15.00 Cmt 30.94
c c) Lead From 2 Km to 3 Km. 20.00 Cmt 38.37
d d) Lead From 3 Km to 4 Km. 25.00 Cmt 45.52
e e) Lead From 4 Km to 5 Km. 45.00 Cmt 52.42
f f) Lead From 5 Km to 10 Km. 30.00 Cmt 78.54
g g) Lead From 10 Km to 15 Km. 30.00 Cmt 104.65
Collecting carting, stacking , spreading and levelling coarse
sand in 150 mm thick compacted layer including watering
up to OMC ,rolling and consolidation with power roller etc
complete as directed.
Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including
premixing the Material with water at OMC in mechanical
7 mix plant carriage of mixed Material by tipper to site,
laying in uniform layers in sub- base / base course on well
prepared surface and compacting with vibratory roller to
achieve the desired density as per Codal Provision.
Production & Supply of WMM 15.00 Cmt 1,708.13
Laying of WMM 15.00 Cmt 31.25
Supplying and fixing of 380 mm H x 300 mm L x 200 mm B
Kerb block for Central Verge in M-20 grade using 20 mm
nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably exposed
finish/ formwork, mould with well equipped with vibratory
system for kerb stones of approved design including curing,
etc. complete, including the cost of formwork etc.
complete. The rate shall also include necessary cutting of
8 asphalt, fixing the Kerb stones in line and level on 5 cm 100.00 Rmt 431.96
thick sand bedding with necessary equipments and
materials. The rate shall also include the flush pointing in
CM (1:3) for all joints of the kerbstones. Filling of zari alone
the sides of the kerb stone fixed with Bituminous concrete
mixed in proper position as directed by Engineer in change
to form a portable mixture. In any case Gravel or such type
of materials shall not be allowed for productiona) Laying
on 5 cm thick Sand Bedding
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H
Kerb block for Footpath in M-20 grade using 20 mm
nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably exposed
finish/ formwork , mould with well equipped with vibratory
system for kerb stones of approved design including
curing, etc. complete, including the cost of formwork etc.
complete. The rate shall also include necessary cutting of
9 asphalt, fixing the Kerb stones in line and level on 5 cm 100.00 Rmt 350.89
thick sand bedding with necessary equipments and
materials. The rate shall also include the flush pointing in
CM (1:3) for all joints of the kerbstones. Filling of zari alone
the sides of the kerb stone fixed with Bituminous concrete
mixed in proper position as directed by Engineer in change
to form a portable mixture. In any case Gravel or such type
of materials shall not be allowed for production. a) Laying
on 5 cm thick Sand Bedding
Supplying and fixing for central verge 230 mm L x 235 mm
Width x 680 mm H Supplying & Fixing in M-20 grade using
20 mm nominal size black trap aggregate of sevaliya/timba
or equivalent quality for pre-cast blocks,reasonably
exposed finish/formwork,mould with well equipped with
vibratory system for kerb stones of approved design
including curing,etc.complete,including the cost of
formwork etc.complete.THe rate shall also include
10 necessary cutting of asphalt,fixing the kerb stones in line 100.00 Rmt 1,376.75
and level on 5 cm thick sand bedding with necessary
equipments and materials.The rate shall also include the
flush pointing in CM(1:3)for all joints of the
kerbstones.Filling of Zari alone the sides of the kerb stone
fixed with bituminous concrete mixed in proper position as
directed by engineer in charge to form a portable
mixture.In any case gravel or such type of materials shall
not be allowed for production.
Providing and Laying of Rubber Moulded Paver Block
Grey/Coloured 60 mm thick, M-35 Grade of any size ;
shape (Usually Uni-Paver Blocks) using black trap good
quality aggragate of 20 mm nominal size for footpath,
parking areas, service lanes and other areas as
mentioned in the drawing / instruction of engineer in
charge. Cost includes formworks using rubber mould, Rate
providing and laying paver blocks as per required grading
and specification. The paver block shall be mechanically
11 compacted. The work of paving blocks shall be executed 255.00 Smt 501.60
in line and level by skill mason of flooring work only. It
should be laid in such a way that the no cutting of the
paver block to be necessary. if cutting of paver block
necessary then it should be cut by machine only and
carting. The finished surface of the paver block shall have
resonably good, plain finished. Paver blocks shall be
compacted and shall be relaid if necessary. Gravel or such
type of materials shall not be allowed for production.
Laying on 5cms thick sand beddding.
Paver Block Providing and laying shot blasted Non -
interlocking, Paver blocks of specified thickness, size, grade
of concrete and colour machine made and blasting by
automatic shot blasting machine and high density of as per
approved sample of approved make for footpath, parking
areas, service lanes,cross over and other areas as
mentioned in the drawing. Including providing and laying
50 mm thick averave bedding layer of coarse sand below
paver block as per required grading and specification. Laid
paver block shall be mechanically compacted. The work of
the paving blocks shall be executed in line and level by
skilled mason of flooring work only. Small size of paver
block with same specification shall be used at residue or at
end. It should be laid in such a way that the no cutting of
the paver block to be necessary. If cutting of paver block
shall be required , than cut by machine only and laying to
be done by skilled flooring mason. The finished surface of
the paver block shall have coarse sand Texture Finish. Pave
blocks shall be compacted and shall be re-laid if necessary.
Actual laid area shall be measured and paid without any
wastage. (A) 80 mm thick M-35 grade Grey Paver block of
size 200mm x 200mm.
Labour work of fixing kurb any design of central verge,
(both side) footpath kurb, items includes necessary
excavation, asphalt cutting of any thickness, erecting in line
13 and position and pointing with cement mortar (1:3), 200.00 Rmt 136.40
watering, etc complete, filling with zari along the side of
the kurb, the kurb stone fix prepared with bitumnious top
surface, as directed by engineer in charge.
Providing and laying cement concrete 1:5:10 (1- Cement :
14 5- fine sand : 10- graded brick bat aggregates 40mm 20.00 Cmt 1,901.59
nominal size) and curing complete.
Painting Two Coats on divider and footpath curb surface /
New Concrete Surface ( Painting two coats after filling the
surface with synthetic enamel paint in all shades on new
plastered concrete surfaces)
Providing TMT Bar FE500D reinforcement for R.C.C. Work
16 including bending,binding and placing in position complete 100.00 Kg 63.10
upto floor two level
Providing and Casting in situ ordinary cement concrete
M200 for R.C.C. Raft and cutt off walls including necessary
17 shuttering laying, vibrating, ramming and curing 20.00 Cmt 3,672.30
complete.(B) Walls, fom top of foundation level upto floor
two level (upto 10ton).
Labour work for fixing interlocking blocks / any kind of
pavement on up to 50 mm th sand bedding, levelling,
watering and fixing in line & level as well cleaning the site
etc.comp. as directed.
Colour Washing with lime on all wall surface (two coat)
over and including a primary coat of white washing t ogive
19 an even shade after through brooming the surface to 1,650.00 Smt 6.96
remove all dirt,dust,mortasr drops and other foreigh
matter. (R&B SOR year 2015-16)
Colour Washing with lime on all wall surface (one coat to
give an even shade after through brooming the surface to
remove all dirt,dust,mortasr drops and other foreigh
matter. . (R&B SOR year 2015-16)
Applying priming coat over new wood and wood based
surfaces after including preparing the surface by throughly
21 cleaning oil, grease, dirt and other foreign matter, sand 1,561.00 Smt 24.38
papering & knotting (B) ready mixed paint, brushing wood
primer pink. (R&B SOR year 2015-16)
Providing and fixing M.S. grills of required pattern to
wooden frames of windows etc. with M.S. flats at required
22 spacings and frame alround, square or round bars with 450.00 kg 56.79
round headed bolts and nuts or by screws (A) Plain Grill.
(upto 10 ton) (R&B SOR year 2015-16)
Contractor's Sign Add.C.E.
Mobil No: - (South Zone)
AHMED ABAD MUNI CIPAL CORPORATI O N ENGINE ER DEP ARTM ENT
TECHNICAL SPECIFICATION
Name of Work :-Clour Work on Curbing, Central verge at CTM Area, Sureliya Area Diff. TP Road And
Other places in indrapuri ward South Zone. (ARC TENDER).
General Technical Specification Section
Following technical specifications shall be applicable to the relevant items of BOQ
Dismantling the following including loading, unloading and disposal of unserviceable material for all lead or as directed by
Engineer-In-Charge and stacking the serviceable material and backfilling the resulting trenches and pits complete.
a. central verge -kerb stone.
b. Dismantling tiled or stone floors laid in mortar including stacking of serviceable material and disposal of
unserviceable material with all lead and lifts.
c. Demolition & disposal of unserviceable material with all lead and lift for unreinforced concrete.
d. Demolition of brick work & stone masonry including stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift (1) In cement mortar.
e. Demolition including stacking of serviceable materials and disposal of unserviceable materials with all lead
and lift. (I) R.C.C work.
The demolition shall consist of demolition of one or more parts of the structure as specified or shown in the drawings.
Demolition implies taking up or down or breaking up. This shall consist of demolishing whole or part of work including all
relevant item as specified or shown in the drawings.
The demolition shall always be planned before hand and shall be done in reverse order of the one in which the structure was
constructed. Contractor is fully responsible for proper and safe demolition.
Necessary dropping, shoring and under pinning shall be provided for the safety of the adjoining work or property, which is to
be left intact, before dismantling and demolishing is taken up and the work shall be carried out in such a way that no
damages is caused to the adjoining property.
Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary precautions shall be taken to keep
the dust nuisance down as and where necessary.
Dismantling shall be commenced in a systematic manner. All materials which are likely to be damaged by dropping from a
height or demolishing roof, masonry etc. shall be carefully dismantled first. The dismantled articles shall be properly stacked
All materials obtained from demolition shall be the property of Government unless otherwise d shall be kept in safe custody
until handed over to the Engineer-in-charge.
Any serviceable materials, obtained during dismantling or demolition shall be separated out and stacked properly as
directed, with all lead and lift. All unserviceable materials, rubbish etc. shall b stacked as directed by the Engineer-in-charge.
On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
Mode of measurements & payment :
Measurements of all work except hidden work shall be taken before demolition dismantling and no allowance for increase in
bulk shall be allowed. The demolition of lime concrete shall be measured under this item. Specification for deduction for
voids, openings etc. shall be on same basis as that employed for construction of work.
All work shall be measured in decimal system as fixed in its place subject to the following limits, unless otherwise stated
hereinafter : (a) Dimensions shall be measured to the nearest 0.01 mt. (b) Area shall be worked out to the nearest 0.01 sq.
mt. (c,d,e) Cubical connection shall be worked out to the nearest 0.01 Cu.m.
The rate shall include cost of all labour involved and tools used in demolishing and dismantling including scaffolding. The rate
shall also include the charges for separating out and stacking the serviceable materials properly and disposing the
unserviceable materials with all lead and lift. The rate also includes for temporary storing for the safety of the portion not
required to be pulled down or of adjoining property and providing temporary enclosures or partitions where considered
The rate shall be for a unit of one cubic metre.
For Dismantling of Tiled Floor:
The relevant specifications shall be followed except the dismantling of tiled or stone floors laid on mortars shall be done
Dismantling implies carefully taking up or down or these are fixed by nail screws bolts etc. the shall be taken out with proper
Mode of measurement & Payment :
The supporting materials such as joints beams if any etc. shall be measured separately. The rate shall include stacking the
unserviceable materials as directed will lead and lift.
The rate shall be for a unit of (a) RMT (b) one sq. Meter (C) CMT(d)Cu.m(e)Cu.m
Extra rate over item of excavation of earth for excavation of asphalt pavement / RCC of thickness up to 0.20 meter
including demolishing the asphalt carpet, metal, soiling/cutting Reinforcement etc. comp. with stacking the material as
directed. (a) up to 0.20 meter thickness (By Manual)(b) 0.20 to 0.30 meter (By any type of Breaker Machine or
R.C.C.Cutter machine including cost of operator, fuel, & transportation etc complete.(c) 0.30 meter & above (By any type
of Breaker Machine or R.C.C.Cutter machine including cost of operator, fuel, & transportation etc complete.
The Item shall be carried out as per Item description and as per instruction of Engineer-in-Charge and/or his authorized
representative.
The rate includes the cost of excavation of bituminous macadam i.e. bituminous layers only like DBM, BC etc including the
labours, tools, equipment and all other incidental expenses. Non Bituminous Sub-layer/Sub base are not considered in this
Work shall be carried out manually or by Machinery as per site requirements.
The mode of payment for this item shall be on Smt. Basis.
Barricading the entire break down or excavated area on lumsum rental basis using wooden ballies / M.S. angles at max.
2.0 meter center to center, C.G.I sheet, reflective paint out side to avoided accident and for smooth traffic diversion and
movement including cautionary board etc. the same shall be removed after completion of work.
The height of the barricades should be minimum 1.20 mt from the ground level. The Item shall be carried out as per Item
description and as per instruction of Engineer-in-Charge and/or his authorized representative. After removal of barricades,
all material related to barricading shall be property of the contractor.
The mode of payment for this item shall be on Rmt. Basis.
Box cutting the road surface to proper slope and camber for making a base for road work including removing the
excavated stuff and depositing on the road side slope as directed upto 200Mt.lead.
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any such ordinary excavating
implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall under this category.
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone, materials and rubbish of all
kind, bush, wood and trees shall be removed as directed. The materials so obtained shall be property of the Government and
be conveyed and stacked as directed. within 200 M. lead. The roots of the trees coming in the sides shall be cut and coated
with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra will be paid.
After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor shall assume full responsibility
for alignment, elevation and dimension of each and all parts of the work. Contractor shall supply laborers, materials, etc.
required for setting out the reference marks and bench marks and shall maintain them as long as required and directed.
The excavation in foundation shall be carried out in true line and level and shall have the width and depth as shown in the
drawings or as directed. The contractor shall do the necessary shoring and shutting or providing necessary slopes to a safe
angle, at his own-cost. The payment for such precautionary measures shall be paid separately if not specified. The bottom of
the excavated area shall be 1 evened both longitudinally and transversely. as directed by removing and watering as required.
No earth filling will be allowed for bringing it to level, if mistake or any other reason excavation is made. deeper or wider
that shown on the plan or directed. The extra depth or width shall be made up with concrete of same proportion as specified
for the foundation concrete at the cost of the contractor. The excavation up to 1.5 m. depth shall be measured under this
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling the ground in layer
including ramming and watering etc. The balance of the excavated quantity shall be removed by the contractor from the site
of work to a place as directed with lead upto 200 M. and all lift.
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be made according to the sections of trenches shown on
the drawing or as per sections given by the Engineer-in-charge. No payment shall be made for surplus excavation made in
excess of above requirements or due to slopping and sloping back as found necessary on account of conditions of soil , and
requirements of safety.
The rate shall be for a unit of one cubic meter.
Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly ash, aggregates
of any kind Including spreading & levelling etc. complete.
• (a)Lead Upto 1 Km.
• (b)Lead From 1 Km to 2 Km.
• (c)Lead From 2 Km to 3 Km
• (d)Lead From 3 Km to 4 Km
• (e)Lead From 4 Km to 5 Km
• (f)Lead From 5 Km to 10 Km
• (g)Lead From 10 Km to 15 Km
Disposal of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly ash, aggregates of any kind is
subject to the following :
Unsuitable materials obtained from clearing site and excavation shall be disposed off within a lead of 200 meters or as per
instruction given by Engineer in charge. Useful materials obtained from clearing site and excavation shall be stacked and
used within the work site. Internal conveyance above 200 mt within the work site i.e. From starting chainage to End
chainage of a given road WILL NOT BE PAYABLE. Materials suitable for construction of Embankment, earthen shoulder and
subgrade shall be stacked at convenient places within a work site for reuse. No extra payment will be paid to the contractor
for stacking of earth within the work site and reused for the construction of Embankment layer, sub grade and earthen
shoulder purpose. Only surplus earth shall be disposed off outside the work site as per instruction given by Engineer-In-
charge. Useful stones from rock excavation shall be stacked nearly within a lead of 50 M. and will be allowed to be used by
the contractor on payment at rates laid down in the contract or if not so aid down, at schedule of rates of the Division or at a
mutually agreed rates if there are no such rates in the Schedule of rates.
If surplus materials are required to be conveyed outside the work site i.e. Outside conveyance from a particular stretch of
given road will be paid in this item as per instruction of Engineer in charge. No bulkage of disposed earth will be considered
for the payment.
The rate shall be for a unit of one cubic meter.
Collecting carting, stacking , spreading and levelling coarse sand in 150 mm thick compacted layer including
watering up to OMC ,rolling and consolidation with power roller etc complete as directed.
As directed by engineer incharge & as per prevailing latest IS & IRC Code.
The mode of payment for this item shall be on Cmt. basis.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including
premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in
uniform layers in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the
desired density etc complete.
Production & Supply of WMM to site of works
This work shall consist of laying and compacting clean, crushed, graded aggregate and granular material, premixed with
water, to a dense mass on a prepared sub-grade/sub- base/ base or existing pavement as the case may be in accordance
with the requirements of these Specifications. The material shall be laid in one or more layers as necessary to lines, grades
and cross-sections shown on the approved drawings or as directed by the Engineer.
The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm. When vibrating or other
approved types of compacting equipment are used, the compacted depth of a single layer of the sub-base course may be
upto 200 mm with the approval of the Engineer.
Physical Requirements
Coarse aggregates shall be crushed stone. The aggregates shall conform to the physical requirements set forth in Table 19-1.
Sevaliya/Timba/Ankodiya special aggregate is only acceptable.
If the water absorption value of the coarse aggregate is greater than 2 percent, the soundness test shall be carried out on
the material delivered to site as per IS:2386 (Part-5).
Table 19-1 : Physical Requirements of Coarse Aggregates for Wet Mix Macadam for Sub-base/Base Courses
S. No. Test Test Method Requirements
1. Los Angeles Abrasion value or IS:2386 (Part-4) 40 percent (Max.)
Aggregate Impact value
IS:2386 (Part-4) or 30 percent (Max.)
2. Combined Flakiness and Elongation indices (Total)
IS:2386(Part-1) 35 percent (Max.)*
* To determine this combined proportion, the flaky stone from a representative sample should first be separated out. Flakiness index is weight of flaky
stone metal divided by weight of stone sample. Only the elongated particles be separated out from the remaining (non-flaky) stone metal. Elongation index
is weight of elongated particles divided by total non-flaky particles. The values of flakiness index and elongation index so found are added up
Grading Requirements
The aggregates shall conform to the grading given in Table 19-2.
Table 19-2 : Grading Requirements of Aggregates for Wet Mix Macadam
IS Sieve Designation Percent by weight passing the IS Sieve
600 micron 8-22
Material finer than 425 micron shall have Plasticity Index (PI) not exceeding
The final gradation approved within these limits shall be graded from coarse to fine and shall not vary from the low limit on
one sieve to the high limit on the adjacent sieve or vice versa.
Construction Operations:-
Preparation of Base
The surface of the sub-grade/sub-base/base to receive the Wet mix macadam course shall be prepared to the specified
grade and camber and cleaned of dust, dirt and other extraneous material. Any ruts or soft yielding places shall be corrected
in an approved manner and rolled until firm surface is obtained.
Where the Wet mix macadam is to be laid on an existing metalled road, damaged area including depressions and potholes
shall be repaired and made good with the suitable material. The existing surface shall be scarified and re-shaped to the
required grade and camber before spreading the coarse aggregate for Wet mix macadam.
Preparation of Mix
Wet Mix Macadam should be prepared in an approved mixing plant of suitable capacity having provision for controlled
addition of water and forced/positive mixing arrangement like pugmill or pan type mixer of concrete batching plant. For
small quantity of wet mix work, the Engineer may permit the mixing to be done in concrete mixers.
Quantity of water should not vary from OMC determined as per IS : 2720 (part VIII) by more than agreed limit. The mixed
material should be uniformly wet and no segregation should be permitted.
Spreading of mix
Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the prepared subgrade/sub-base/base
in required quantities. In no case should these be dumped in heaps directly on the area where these are to be laid nor shall
their hauling over a partly completed stretch be permitted.
The mix may be spread either by a paver finisher or motor grader or as per instruction of Engineer-in-Charge and/or his
authorized representative. For portions where mechanical means cannot be used, manual means as approved by the
Engineer shall be used. The motor grader shall be capable of spreading the material uniformly all over the surface. Its blade
shall have hydraulic control suitable for initial adjustments and maintaining the same so as to achieve the specified slope and
The paver finisher shall be self-propelled, having the following features:
(i) Loading hoppers and suitable distribution mechanism
(ii) The screed shall have tamping and vibrating arrangement for initial compaction to the layer as it is spread without
rutting or otherwise marring the surface profile.
(iii) The paver shall be equipped with necessary control mechanism so as to ensure that the finished surface is free from
surface blemishes.
The surface of the aggregate shall be carefully checked with templates and all high or low sports remedied by removing or
adding aggregate as may be required. The layer may be tested by depth blocks during construction. No segregation of layer
and fine particles should be allowed. The aggregates as spread should be of uniform gradation with no pockets of fine
After the mix has been laid to the required thickness, grade and crossfall/camber the same shall be uniformly compacted, to
the full depth with suitable roller. If the thickness of single compacted layer does not exceed 100 mm, smooth wheel roller of
80 to 100 kN weight may be used. For a compacted single layer upto 200 mm, the compaction shall be done with the help of
vibratory roller of minimum static weight of 80 to 100 kN or equivalent capacity roller. The speed of the roller shall not
In portions having unidirectional cross fall/superelevation, rolling shall commence from the lower edge and progress
gradually towards the upper edge. Thereafter, roller should progress parallel to the centre line of the road, uniformly over-
lapping each preceding track by at least one third width until the entire surface has been rolled. Alternate trips of the roller
shall be terminated in stops at least 1 m away from any preceding stop.
In portions in camber, rolling should begin at the edge with the roller running forward and backward until the edges have
been firmly compacted. The roller shall then progress gradually towards the centre parallel to the centre line of the road
uniformly overlapping each of the preceding track by at least one-third width until the entire surface has been rolled.
Any displacement occurring as a result of reversing of the direction of a roller or from any other cause shall be corrected at
once as specified and/or removed and made good.
Along forms, kerbs, walls or other places not accessible to the roller, the mixture shall be thoroughly compacted with
mechanical tampers or a plate compactor. Skin patching of an area without scarifying the surface to permit proper bonding
of the added material shall not be permitted.
Rolling should not be done when the subgrade is soft or yielding or when it causes a wave-like motion in the sub-base/base
course or subgrade. If irregularities develop during rolling which exceed 12 mm when tested with a 3 metre straight edge,
the surface should be loosened and premixed material added or removed as required before rolling again so as to achieve a
uniform surface conforming to the desired grade and crossfall. In no case should the use of unmixed material be permitted
to make up the depressions. Rolling shall be continued till the density achieved is at least 98 per cent of the maximum dry
density for the material as determined by the method outlined in IS : 2720 (Part-8).
After completion, the surface of any finished layer shall be well-closed, free from movement under compaction equipment
or any compaction planes, ridges, cracks and loose material. All loose, segregated or otherwise defective areas shall be made
good to the full thickness of the layer and recompacted.
Setting and drying:
After final compaction of wet mix macadam course, the road shall be allowed to dry for 24 hours.
Opening to Traffic
Preferably no vehicular traffic of any kind should be allowed on the finished wet mix macadam surface till it has dried and
the wearing course laid.
Surface Finish and Quality Control of Work
Surface evenness:
The surface finish of construction shall conform to the requirements of Clause in Item No. 16&17&18.
Quality control:
Control on the quality of materials and works shall be exercised by the Engineer as per Table 19-3.
Table 19-3 : Test and Frequency for Materials for Wet Mix Macadam
Type of Test Frequency IS Code
Construction (As per Circular No. 66)
Wet Mix Gradation One test per 200 Cu.m. IS:2386, Part-I-1963
Macadam Aggregate Impact Value One test per 1000 Cu.m. IS:2386, Part-IV
Combined Flakiness and One test per 500 Cu.m. IS:2386, Part-I
Elongation Indices
Atterberg Limits of portion of One test per 200 Cu.m. IS:2720, Part-V
aggregates passing
425 micron sieve
Density of compacted layer One set of three tests per IS:2720, Part-VIII
Rectification of Surface Irregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible tolerances or where the course is
otherwise defective due to subgrade soil getting mixed with the aggregates, the full thickness of the layer shall be scarified
over the affected area, reshaped with added premixed material or removed and replaced with fresh premixed material as
applicable and recompacted. The area treated in the aforesaid manner shall not be less than 5 m long and 2 m wide. In no
case shall depressions be filled up with unmixed and ungraded material or fines.
Arrangement for Traffic
During the period of construction, arrangements for the traffic shall be provided. The Contractor shall take all necessary
measures for the safety of traffic during construction and provide, erect and maintain such barricades, including signs,
marking, flags, lights and flagmen as per instruction of the Engineer-in-charge.
Measurements for Payment
The rate shall be for a unit of one cubic meter.
Supplying and fixing of 380 mm H x 300 mm L x 200 mm B Kerb block for Central Verge in M-20 grade using 20 mm
nominal size black trap aggregate of Sevaliya/Timba/Ankodiya or equivalent quality for pre-cast blocks, reasonably
exposed finish/ formwork, mould with well equipped with vibratory system for kerb stones of approved design including
curing, etc. complete, including the cost of formwork etc. complete. The rate shall also include necessary cutting of
asphalt, fixing the Kerb stones in line and level on 5 cm thick sand bedding with necessary equipments and materials. The
rate shall also include the flush pointing in CM (1:3) for all joints of the kerb stones. Filling of zari alone the sides of the
kerb stone fixed with Bituminous concrete mixed in proper position as directed by Engineer in change to form a portable
mixture. In any case Gravel or such type of materials shall not be allowed for production.
The specifiction of following materials shall be conforming with specification mentioned for relavent material / items in
General technical specification for building work of R&B Department of Gujarat.
Water shall conform to M-1
Graded stone aggregate 20 mm. nominal size to M-10
Contractor shall have to manufacture the blocks as per the dimensions given in the drawing. Specific machineries shall be
used to manufacture the precast blocks. These machineries should be compatible to produce blocks of required strength and
dimensions. The machine shall contain hydraulic Press or advanced equipment to generate required compaction & Grade
and finish. Moulds/ Steel Plates/ Dies of the machine shall be dimensionally checked & to be got approved before
commencing the production. Contractor shall prepare proper Drying Yard for keeping the blocks before curing. The drying
yard shall be levelled and covered so that no shrinkage cracks are formed. Contractor shall prepare adequate size curing
pond to cure the blocks for not less than 21 Days. No other means of curing shall be allowed. The technical specification of
concrete shall confirm to IS 456-2000. The concrete mix is not required to be designed and only nominal mix as per IS: 456-
2000 shall be followed. The proportion of the concrete mix shall be 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone
aggregate 20 mm. nominal size) by volume. Concrete work shall have fairly exposed concrete surface or as specified in the
item. The designation ordinary M-10, M-15, M-20, M-25 specified as per I.S. corresponds approximately to 1:3:6, 1:2:4,
1:1.5:3 and 1:1:2 nominal mix of ordinary concrete, by volume respectively. The ingredients required for ordinary concrete
containing one bag of cement of 50 Kg. by weight (0.0342 m3.) for different proportions of mix shall be as per IS 456-2000.
The proportion of the aggregate for the kerb stone shall be modified as per the approval of the engineer-in-charge. The
water cement ratios shall not be more than those specified as per IS. The cement of the mix shall be increased, if the
quantity of water in a mix has to be increased to overcome the difficulties of placement and compaction so that the water
cement ratio specified in the table is not exceeded. The maximum size of coarse aggregate shall be as large as possible
within the limits specified but in no case greater than 1/4th of the minimum thickness of the member, provided that the
concrete can be placed without difficulty so as to surround all reinforcement thoroughly and to fill the corners of the form.
For reinforced concrete work, coarse aggregates having a nominal size of 20 mm. are generally considered satisfactory.
Admixture shall be used in concrete only with approval of the Engineer-in-charge based upon the evidence that with the
passage of time, neither the compressive strength of concrete is reduced nor are other requisite qualities of concrete
impaired by the use of such admixtures.
Proportioning shall be done by volume, except cement which shall be measured in terms of bags of 50 kg weight. The
volume of one such bag can be taken as 0.0342 m3. Boxes of suitable sizes shall be used for measuring sand and aggregate.
The size of the boxes (internal) shall be 30cm. x 30 cm. and 38 cm. deep. While measuring the aggregate and sand, the box
shall be filled without shaking ramming or hammering. The proportioning of sand shall be on the basis of its dry volume and
in case of damp sand; allowances for bulk age shall be made.
For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be kept in first class
working condition and maintained throughout the construction. Measured quantity of aggregate, sand, and cement
required for each batch shall be poured into the drum of the mechanical mixer while it is continuously running. After about
half a minute of dry-mixing, measured quantity of water required for each batch of concrete mix shall be added gradually
and mixing continued for another one and a half minute. Mixing shall be continued till materials are uniformly distributed
and uniform colour of the entire mass is obtained and each individual particle of the coarse aggregate shows complete
coating of mortar containing its proportionate amount of cement. In no case shall the mixing be done for less than
minutes after all ingredients have been put into the mixer. Mixers which have been out of use for more than 30 minutes
shall be thoroughly cleaned before putting in a new batch. Unless otherwise agreed to by the Engineer-in-charge, the first
batch of concrete from the mixture shall contain only 2/3rds of normal quantity of coarse aggregate. Mixing plant shall be
thoroughly cleaned before changing from one type of cement to another.
The degree of consistency which shall depend upon the nature of the work and methods of vibration of concrete shall be
determined by regular slump tests in accordance with IS: 1199-1959. The slump of 10 mm. to 25 mm. shall be adopted when
vibrators are used.
All Moulds shall be cleaned and made free from standing water, dust, snow, or ice immediately before placing of concrete.
Formwork/Metal Mould for exposed concrete surface (If indicated):
All the moulds shall be checked for exact dimensions of the precast blocks. All the edges of the precast blocks shall confirm
the profile of the final drawing & edges/ curvatures of the moulds shall be checked accordingly. Moulds shall be regularly
checked for correctness of dimensions of Blocks, twists, bends due to handling, etc. Before starting every days work.
Care shall be taken to set all form work/Mould in perfect line, level (or in required camber or slope as specified) and plumb.
Form work/Mould propping shall be strong, rigid, and sturdy. The form work/Mould shall be as per pattern & design shown
in drawings. Form work/Mould shall be done accurately and precisely so as to achieve neat, clean and smooth concrete
surface, in line, level and plumb. Clinks, twists, offsets, warps, riveting etc. in plates or forms shall not be allowed. Before
placing concrete, forms shall be thoroughly cleaned off of all rust, dust, and loose materials. Colourless oil or grease of
approved quality shall be applied before placing steel. Also the form work material will be of wood/plywood/steel or any
sort of such material, as approved by the Engineer-in-Charge and/or his authorized representative; so that all exposed
concrete surfaces have uniform colour.
For all kind of exposed concrete work only one brand (to be approved by the Engineer-in charge) of cement shall be used.
Removal of Moulds:
Specific time shall be identified for removal of moulds, such that the concrete of the precast blocks shall gain strength to
withstand the stresses generated due to self weight and handling to drying yards without any deformation to shape/
dimensions/ edges.
Sufficient time shall be given to the block after it is removed from the mould so that it can gain strength and dry in shade to
prevent any cracks due to shrinkage. This shall be done in drying yards.
Curing of block shall be done only in curing pond and curing shall be done for minimum 14 days.
Drying period after removing from pond & before delivery to site: Water should be drained of from the block before it is
actually sent to the site. Time should be provided for proper draining of water which may be present in the block kept for
curing in the pond.
Precaution shall be taken while transporting of the blocks to site.
The blocks should be loaded and unloaded with due care so as to avoid generation of stresses leading to breaking of block.
Care should be taken to prevent the block from breaking during transporting.
The pits of the size 150mm in width and required depth shall first be excavated, true to line and level. The relevant
specifications of item A- 1 shall be followed for excavation work. The pits shall be filled with a layer of 50mm. thick sand
bedding. The curbs then shall be placed in position of which 50mm. shall be below road. Care should be taken to maintain
proper line and level. The joints between the kerbs shall be pointed with C.M. 1:2 and cured for minimum seven days.
Sampling and testing of concrete:
Samples from fresh concrete shall be taken as per IS : 1199-1959 and cubes shall be made, cured and tested at 7 days or
days as per requirements in accordance with IS : 516-1959. A random sampling procedure shall be adopted to ensure that
each concrete batch shall have a reasonable chance of being tested i.e. the sampling should be spread over the entire period
of concreting and cover all mixing units.
At least 1 sample shall be taken from each shift. Ten test specimens shall be made from each sample, 5 for testing at 7 days,
and the remaining 5 at 28 days. The samples of concrete shall be taken on each day of the concreting as per above
frequency. The number of specimens may be suitably increased as deemed necessary by the Engineer-in-charge when
procedure of tests given above reveals a poor quality of concrete and in other special cases. The average strength of the
group of cubes cast for each day shall not be less than the specified cube strength of 200 Kg/cm2 at 28 days. 20% of the
cubes cast for each day may have value less than the specified strength provided the lowest value is not less than 85% of the
specified strength. If the concrete made in accordance with the proportions given for a particular grade, does not yield the
specified strength, such concrete shall be classified as belonging to the appropriate lower grade. Concrete made in
accordance with the proportions given for a particular grade shall not, however, be placed in a higher grade on the ground
that the test strength are higher than the minimum specified. If rock pockets/honeycombs in the opinion of Engineer-in-
charge are of such an extent or character so as to affect the strength of the structure, materially or to endanger the life of
the steel reinforcement, he may declare the concrete defective and require the removal and replacement of the portion of
the structure affected.
Precast Kerb Stones:
The relevant specifications of concreting as per item above shall be followed except that work shall be carried out for precast
concrete kerb stones as specified in the item. All Precast members shall be cast at workshop. Sufficient curing shall be done
before placement of the same the method of transporting and placing the precast members shall be as approved by the
Engineer-in-charge. Members shall be so transported that no breakage or undue stresses are induced in them. If required, all
members shall have a key provided on both the faces i.e top and bottom surfaces, of adequate size so as to fill the same with
concrete while laying. The function of this key is to avoid the leakage through the joint between the precast member and the
member on which it is laid.
Mode of Measurements and Payment :
The rate shall include cost of formwork and cost of reinforcement. The volume occupied by reinforcement shall not be
deducted from R.C.C. work.
The rate shall be for a unit of Rmt.
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb block for Footpath in M-20 grade using 20 mm nominal
size black trap aggregate of Sevaliya/Timba/Ankodiya or equivalent quality for pre-cast blocks, reasonably exposed
finish/ formwork , mould with well equipped with vibratory system for kerb stones of approved design including curing,
etc. complete, including the cost of formwork etc. complete. The rate shall also include necessary cutting of asphalt,
fixing the Kerb stones in line and level on 5 cm thick sand bedding with necessary equipments and materials. The rate
shall also include the flush pointing in CM (1:3) for all joints of the kerbstones. Filling of zari alone the sides of the kerb
stone fixed with Bituminous concrete mixed in proper position as directed by Engineer in change to form a portable
mixture. In any case Gravel or such type of materials shall not be allowed for production.
Specification as per Item No. 42 only size of kerb as mentioned in Abstract.
Supplying and fixing for central verge 230 mm L x 235 mm Width x 680 mm H Supplying & Fixing in M-20 grade using
mm nominal size black trap aggregate of sevaliya/timba or equivalent quality for pre-cast blocks,reasonably exposed
finish/formwork,mould with well equipped with vibratory system for kerb stones of approved design including
curing,etc.complete,including the cost of formwork etc.complete.THe rate shall also include necessary cutting of
asphalt,fixing the kerb stones in line and level on 5 cm thick sand bedding with necessary equipments and materials.The
rate shall also include the flush pointing in CM(1:3)for all joints of the kerbstones.Filling of Zari alone the sides of the kerb
stone fixed with bituminous concrete mixed in proper position as directed by engineer in charge to form a portable
mixture.In any case gravel or such type of materials shall not be allowed for production.
Work shall be carried out as per item description including cost of all labour and materials etc. complete as directed. General
standard practice of work is applicable.
The measurements shall be on Rmt basis.
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35 Grade of any size ; shape (Usually
Uni-Paver Blocks) using black trap good quality aggragate of 20 mm nominal size for footpath, parking areas, service lanes
and other areas as mentioned in the drawing / instruction of Engineer-in-Charge and/or his authorized representative.
Cost includes formworks using rubber mould, Rate providing and laying paver blocks as per required grading and
specification. The paver block shall be mechanically compacted. The work of paving blocks shall be executed in line and
level by skill mason of flooring work only. It should be laid in such a way that the no cutting of the paver block to be
necessary. if cutting of paver block necessary then it should be cut by machine only and carting. The finished surface of
the paver block shall have resonably good, plain finished. Paver blocks shall be compacted and shall be relaid if necessary.
Gravel or such type of materials shall not be allowed for production. Laying on 50 mm thick sand bedding.
• Laying on 50 mm thick sand bedding.
48.1 Scope of work :
Excavation and compaction up to 300 mm in height for footpath paving in all sorts of soil murrum including sorting outs and
stacking of useful materials stuff up to 50mt.
The scope of work includes manufacturing, supplying, and lying of precast paver blocks at various Retail outlets. The work
includes: Verification of the existing site condition and advising our project in charge to lay suitable base course if required.
Contractors are required to satisfy themselves with quality of sub grade, sub-base course before the paver blocks are laid
and suggest strengthening if required.
Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks. Manufacturing of paver
blocks in your plant as per requirements in technical specification enclosed. Supplying of paver blocks at site, including
handling at both ends.
Laying of paver blocks at site as per requirement in technical specification on 50 mm thick sand bedding, within shortest
possible time the site is public place hence care should be taken to ensure that the routine activities should not be disturbed.
The job of laying may required to be carried out during night also.
Testing of paver blocks shall through reputed Govt. /Non Govt. Test house only and submission of test results as per
requirements in Technical Specifications. AMC reserves the right to carryout test at random. Cost for such tests to be borne
by party. The contractor shall guarantee that all material and components designed, fabricated, supplied, and laid by him
shall be free from any type of defect due to faulty material and/or workmanship/erection for a period of One year from the
date of completion of work. However, the contractor one year's shall render free maintenance.
TECHNICAL SPECIFICATIONS:
48.2 Paver Block Manufacturing Facilities:
The Paver Block shall be made in factory with following minimum facilities:
48.2.1 Concrete Block making Machines:
The machine should be capable of producing high quality Paver Blocks by obtaining high level of compaction by
application of hydraulic compaction and also by high intensity vibration to the moulds. The machine should have
automatic control panel
for uniformity in strength.
48.2.2 Concrete Batching & Mixing Plant: (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete ingredient should be mixed
in concrete Batching & Mixing plant with minimum capacity of 30 cum/hour. The plant should equipped with
automatic control panel for maintaining water cement ratio from batch to batch to obtain concrete of uniform
quality and strength. The plant should be equipped with adequate mechanism for mechanized loading of raw
materials into mixer and conveyor belt for transportation of concrete from mixer to concrete block making machine
to maintain quality of wet cement.
48.2.3 The factory should have well designed curing area to ensure adequate curing of paver blocks.
48.2.4 Laboratory (Desirable but not essential) :
The testing equipment should have required in the Laboratory as per the following:
A Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
Systematic record of test results of various paver blocks manufactured in the factory.
Concrete Mix Design for various grade of concrete used for making of paver blocks.
48.3 Specifications For Coloured Paver Blocks:
Coloured concrete paver blocks shall be manufactured as per attached specifications using or equivalent approved
colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with minimum colour pigment of 3% by
weight of cement. The colour shade shall be “RED” as selected by AMC before commencement of the work. White
cement shall be used for colored pavers to obtain the desired colour shade. The job also includes providing 50 mm
thick sand bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from the date of
laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers will be as per
48.4 Pavers Block Characteristics:
The concrete pavers should have perpendicularities after release from the mould and the same should be retained
until the laying. The surface should be reasonably smooth and of anti skid and anti glare type. The paver should
have uniform chamfers to facilitate easy drainage surface run off. The pavers should have uniform interlocking
space of 2mm to 3mm to ensure compacted sand filling after vibration on the paver Surface. The concrete mix
design should be followed for each batch of materials separately and automatic batching plant is to be used to
achieve uniformity in strength and quality. The pavers shall be manufactured in single layer only. Skilled labour
should be employed for laying blocks to ensure line and level of laying, desired shape of the surface and adequate
compaction of the sand in the joints. The pavers shall be of cement gray colour without any pigment & for coloured
pavers refer “specifications for coloured pave`” The pavers are to be skirted all round with kerbing using solid
concrete blocks of size 150mm X 250mm X 380mm. The kerbing should be embedded for 100mm depth. The
concrete used for kerbing shall be cured properly for 7 days minimum.
48.5 Paver Block Dimensions:
Thickness 60 mm
Shape Unipaver, I shape or directed by Addl.C.E.
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey colour without use of any pigment.
For coloured pavers refer “specifications for coloured pavers”
Dimensional Tolerance (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
48.6 Testing of Paver Blocks :
SR. NO. * TEST Average Values Frequency
1. Compressive Strength Min. 35 N/Sq mm for 60mm thick
250 Smt / 1 Test
2. Flexural Strength Minimum 4.5 N/Sq mm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
* Sampling and testing procedure as per enclosed specifications
48.7 Sampling and Testing Procedure for Paver Blocks
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
48.7.1 Sampling for Testing
Sampling of Paver blocks.
Method of sampling :
Before laying paver blocks, each designated section comprising not more than 50000 blocks, shall be divided into
ten approximately equal groups. Three blocks shall be drawn from each group.
Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the designated section of part
thereof, and the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid damage to the paving in
transit. Protect the paving from damage and contamination until they have been tested. The testing shall be carried
as soon as possible, after the sample has been taken. As soon as practicable after sampling. The samples shall be
stored in water at 20 degree C 5 degree C for 24 hours prior to testing.
The item is to be executed as per instructions and to the entire satisfaction of Engineer-in-Charge and/or his
authorized representative using Rubber mould and Table vibrator for Kerb instead of mechanical press system.
Extra rate for excavation of asphalt payment of any thickness including demolishing the asphalt carpet, metal, soling
etc. complete with stacking the materials as directed. The road surface of asphalt shall carefully be opened to full
width as directed by the Engineer-in-Charge and/or his authorized representative.
Excavation area shall be properly identified and marked in rectangular shape. The road crust shall be opened up to
entire depth i.e. including soling. All the materials shall be separately deposited in such a way and in places as may
be determined by the Engineer-in-Charge and/or his authorized representative. In case rubble not being so
deposited or being mixed up with the excavated materials will not be allowed for refilling. The cost of materials
shall be charged from the contractor. The decision of the C.E. shall be final and binding to the contract
For detailed specification for Laying of Paver Block on sand bedding, refer R & B Department booklet for General
Technical Specification for building works.
The rate shall be for a unit of SMT
Providing and laying shot blasted Non - interlocking, Paver blocks of specified thickness, size, grade of concrete and colour
machine made and blasting by automatic shot blasting machine and high density of as per approved sample of approved
make for footpath, parking areas, service lanes,cross over and other areas as mentioned in the drawing. Including
providing and laying 50 mm thick averave bedding layer of coarse sand below paver block as per required grading and
specification. Laid paver block shall be mechanically compacted. The work of the paving blocks shall be executed in line
and level by skilled mason of flooring work only. Small size of paver block with same specification shall be used at residue
or at end. It should be laid in such a way that the no cutting of the paver block to be necessary. If cutting of paver block
shall be required , than cut by machine only and laying to be done by skilled flooring mason. The finished surface of the
paver block shall have coarse sand Texture Finish. Pave blocks shall be compacted and shall be re-laid if necessary. Actual
laid area shall be measured and paid without any wastage. (A) 80 mm thick M-35 grade Grey Paver block of size 200mm x
1.0 The scope of work: It includes supplying and laying of Precast shot blasted by automatic shot blasting machine in factory
(not on site) paver blocks at footpath, parking area, service lane and other areas.
The work includes:
1.1 Paver block should be laid over prepared sub grade.
1.2 Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks.
1.3 Manufacturing of paver blocks by one of the approved suppliers as per requirements intechnical specification enclosed.
1.4 Supplying of paver blocks at site, including handling at both ends. The type of paver block may be interlocking or non-
1.5 Providing and laying average 50 mm coarse sand bedding for laying blocks.
1.6 Laying of paver blocks at site as per requirement in technical specification, within shortest possible time.
1.7 Testing of paver blocks through reputed Govt. /Non Govt. Test house and submission of test results as per requirements
in Technical Specifications. Client reserves the right to carryout test at random. Cost for such tests to be borne by contractor.
1.8 The contractor shall guarantee that all material and components designed, fabricated, supplied and laid by him shall be
free from any type of defect due to faulty material and/or workmanship/erection for a period of five year from the date of
completion of work at individual sites. However, the contractor for five years shall render free maintenance.
2.0 Technical Specifications:
2.1 Paver Block Manufacturing Facilities:
The Paver Block shall be made in factory with following minimum facilities:
Concrete Block making Machines:
The machine should be capable of producing high quality Paver Blocks by obtaining high level of compaction by application
of hydraulic compaction and also by high intensity vibration to the moulds. The machine should have automatic control
panel for uniformity in strength.
Concrete Batching & Mixing Plant: (Not essential) The concrete Mix Design should be followed for each batch of materials.
The concrete ingredient should be mixed in concrete Batching & Mixing plant with minimum capacity of 30 cum/hour. The
plant should be equipped with automatic control panel for maintaining water cement ratio from batch to batch to obtain
concrete of uniform quality and strength.
The plant should be equipped with adequate mechanism for mechanized loading of raw materials into mixer and conveyor
belt for transportation of concrete from mixer to concrete block making machine to maintain quality of wet cement.
The factory should have well designed curing area to ensure adequate curing of paver blocks. Steam curing facility of the
paver blocks is preferable.
Laboratory (Desirable but not essential) :
The factory should have the following:
Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
(1) Systematic record of test results of various paver blocks manufactured in the factory.
(2) Concrete Mix Design for various grade of concrete used for making of paver blocks.
2.2 Specifications for Coloured Paver Blocks:
Colour concrete paver blocks shall be manufactured as per attached specifications using approved colour Pigment of iron
oxide of approved brand like Bayer, Tata etc. with minimum colour pigment of 3% by weight of cement. The colour shade
shall be as selected by Architect before commencement of the work. The job also includes providing 50 mm thick sand
bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from the date of laying of
the same at site.
All other technical specifications & Procedure for testing, laying & sampling of Color pavers will be as per attachment.
2.3 Paver Block Characteristics:
The concrete pavers should have perpendicularities after release from the mould and the same should be retained until the
The surface should be reasonably smooth and of anti skid and anti glare type. The paver should have uniform chamfers to
facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling after vibration on the
The concrete mix design should be followed for each batch of materials separately and automatic batching plant is to be
used to achieve uniformity in strength and quality.
The pavers shall be manufactured in Double layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying, desired shape of the surface and
adequate compaction of the sand in the joints.
2.4 Paver Block Dimensions:
Layers Double layered, top layer minimum 8 to 10 mm
Shape Irregular (Uniform Shape with no Hollow Or Cracks) / as per drawing
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey Colour without use of any pigment.
For Colour pavers refer “specifications for Colour pavers”
Dimensional (+/-) 2mm for length & width,
Tolerance (+/-) 3mm for Height (Thickness)
2.5 Testing of Paver Blocks:
* Sampling and testing procedure as per enclosed specifications
3.0 Sampling & Testing Procedures for Paver Blocks:
3.1 Sample Size:
INTERNAL – Average of minimum 3 samples per 10000 Blocks for compressive strength and water absorption.
EXTERNAL – Minimum 2 Blocks per 10000 blocks for abrasion and flexure.
3.2 Sampling For Testing: Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
Compressive Strength: Testing for compressive strength shall be undertaken in accordance with Appendix-B. The average
compressive strength of the blocks tested shall be 30/40 N/Sq.mm as per thickness.
Abrasion Resistance: Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement Concrete Floor
Flexural Strength: Testing for flexural shall be in accordance with IS 1237 (Specifications for Cement Concrete Floor Tiles).
Water Absorption: Testing for water absorption shall be in accordance with IS 2185:1979: Part I (Specifications for Concrete
Masonry Units).
Method of sampling: Before laying paver blocks, each designated section comprising not more than 10000 blocks, shall be
divided into five approximately equal groups. One block shall be drawn from each group i.e. 3 for internal testing and 2 for
external testing.
Marking and identification: All samples shall be clearly marked at the time of sampling in such a way that the designated
sections of part thereof, and the consignment represented by the sample, are clearly defined.The sample shall be dispatched
to the approved test laboratory taking precaution to avoid damage to the paving in transit. Protect the paving from damage
and contamination until they have been tested. The testing shall be carried as soon as possible, after the sample has been
taken. As soon as practicable after sampling. The samples shall be stored in water at 20 degree oC for 24 hours prior to
SR.NO. * TEST SPECIFICATION Average Values
(Average of Minimum Five Samples/Site)
1. Compressive Strength Min. 30 N/Sq.mm for 60mm thick and Min. 40 N/Sq.mm
2. Flexural Strength Minimum 3.80 N/Sq.mm and 4.5 N/ Sq. mm for 60 and
mm thick paver block respectively.
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
5. Minimum Cement Content 380 Kg/Cum for M 30 concrete and 430 Kg/Cum for M 40 concrete
3.0 Sampling & Testing Procedures for Paver Blocks:
3.1 Sample Size:
INTERNAL – Average of minimum 3 samples per 10000 Blocks for compressive strength and water absorption.
EXTERNAL – Minimum 2 Blocks per 10000 blocks for abrasion and flexure.
3.2 Sampling For Testing: Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
Compressive Strength: Testing for compressive strength shall be undertaken in accordance with Appendix-B. The average
compressive strength of the blocks tested shall be 30/40 N/Sq.mm as per thickness.
Abrasion Resistance: Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement Concrete Floor
Flexural Strength: Testing for flexural shall be in accordance with IS 1237 (Specifications for Cement Concrete Floor Tiles).
Water Absorption: Testing for water absorption shall be in accordance with IS 2185:1979: Part I (Specifications for Concrete
Masonry Units).
Method of sampling: Before laying paver blocks, each designated section comprising not more than 10000 blocks, shall be
divided into five approximately equal groups. One block shall be drawn from each group i.e. 3 for internal testing and 2 for
external testing.
Marking and identification: All samples shall be clearly marked at the time of sampling in such a way that the designated
sections of part thereof, and the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid damage to the paving in transit.
Protect the paving from damage and contamination until they have been tested. The testing shall be carried as soon as
possible, after the sample has been taken. As soon as practicable after sampling. The samples shall be stored in water at
degree C 5 degree C for 24 hours prior to testing.
Test For Compressive Strength:
Testing Machine: The testing machine shall be of suitable capacity for the test and capable of applying the load of the rate
specified. It shall comply, as regards repeatability and accuracy, with the requirements of clause 2.1 of BS: 1881-Part
Procedure: The sample specimen shall be tested in a wet condition after being stored for at least 24 hours in water
maintained at a temperature of 20 C + or – 5 C. Before thespecimens are submerged in water, the necessary area shall be
The plates for testing machines shall be wiped clean and any loose grit or other material removed from the contact faces of
the specimen. Plywood, nominally 4 mm thick shall be used as packing between the upper and lower faces of the specimen
and the machine plates and these boards shall be larger than the specimen by the margin of at least 5 mm
at all points. Fresh Packing shall be used for every specimen tested.
The specimen shall be placed in the machine with the wearing surface in the horizontal plane and in such a way that the axes
of the specimen are aligned with those of the machine plates.
The load shall be applied without shock and increased continuously at the rate of approximately 15 N/ Sq.mm per minute
until no greater load can be sustained. The maximum load applied to the specimen shall be recorded.
Calculation of corrected strength for individual Blocks: The compressive strength of each block specimen shall be calculated
by dividing the maximum load by full cross section area of the block and multiplying with an appropriate factor of:-
a) For 100 mm thick blocks –
b) For 80 mm thick blocks –
c) For 60 mm thick blocks –
Compressive Strength Calculation: The average corrected compressive strength for the designed block section shall be
4.0 Method of laying:
Blocks shall be placed on the sand bedding etc. which were well rammed so as to act as firm bed. Blocks shall be laid in such
manner that no gap shall be left in between. Blocks so laid shall be compacted by means of mechanical compactor or
equivalent compacting method so as to obtain required finished surface. All the joints shall be matched and if any
manufacturing defect is detected the lot shall be replaced and relaying shall be done with out any extra cost up to
satisfaction of Engineer in charge.
50 to 80mm thick coarse sand shall be laid as cushioning layer for arranging the paver blocks. Joints of the paver blocks shall
be filled with the sand.
The paver blocks shall be laid properly on the prepared sub-base as per manufacturer's specification and as per Architect and
Engineer-in-charge's instruction.
Paver block shall be laid by the approved agency only. If manufacturer of the paver block providing the laying services, then
it shall be laid through the supplying agency only. The labourers for paver block fixing shall be skilled flooring mason only.
Only cutting tool shall be used for cutting the paver block. Full depth cutting toll shall be used for proper finished surface
after cutting. Manual cutting or breaking of the paver block is not permitted.
After laying of the paver block fine sand shall be spread over it and paver block shall be compacted with mechanical
compactor. Any settlement or undulation in the laid area shall be repaired immediately.
5.0 Mode of Measurement and payment:
Measurement shall be done as per actual area laid without considering any wastage.
The Measurement of the item shall be in Sqmt basis.
Labour work of fixing kurb any design of central verge, (both side) footpath kurb, items includes necessary excavation,
asphalt cutting of any thickness, erecting in line and position and pointing with cement mortar (1:3), watering, etc
complete, filling with zari along the side of the kurb, the kurb stone fix prepared with bitumnious top surface, as directed
by engineer in charge.
Work shall be carried out as per item description including cost of all labour and materials etc. complete as
directed. General standard practice of laying of paver block is applicable.
The measurements shall be on RMT basis.
Providing and laying cement concrete 1:5:10 (1- Cement : 5- fine sand : 10- graded brick bat aggregates 40mm nominal
size) and curing complete.
Before starting the concrete the bed of the foundations trenches shall be cleared of all loose materials and watered and
rammed as directed. The proportion of cement, sand and hand broken stone aggregates shall be one part of cement, 5 parts
of coarse sand, 10 parts of hand broken stone aggregates and shall so measured by volume. The concrete shall be mixed in a
mechanical mixer at the site of work. Hand mixing may however be allowed for smaller quantity of work if approved by the
Engineer-incharge. When hand mixing is permitted by the Engineer-in charge in case of breakdown of machinery’s and in the
interest of the work. it shall be carried out on a water tight platform and care shall be taken to ensure that mixing is
continued until the mass is uniform in colour and consistency. The quantity of water shall be sufficient to produce a dense
concrete of required workability for the purpose. The concrete shall be handled from the place of mixing to the final position
in not more than 15 minutes by the method as directed and shall be placed into its final position, compacted and finished
within 30 minutes of mixing with water i.e. before the setting commences. The concrete shall be laid in layers of 15 cms. to
20 cms. The concrete shall be rammed with heavy iron rammers and rapidly to get the required compaction and to allow all
the gaps to be filled with mortar. After the final set, the concrete shall be kept continuously wet, if required by pounding for
a period of not less than 7 days from the date of placement The concrete shall be measured for its length breadth and depth,
limiting dimensions to those specified on plan or as directed.
Mode of measurements shall be on CMT basis
Painting Two Coats on divider and footpath curb surface / New Concrete Surface ( Painting two coats after filling the
surface with synthetic enamel paint in all shades on new plastered concrete surfaces)
The colour and workmanship shall be in accordance with the Code of Practice for painting, and as specified in the drawings
or as directed by the Engineer
Materials: Synthetic enamel paint shall conform to IS.
The materials required for work of painting work shall be obtained directly from approved manufacturers or approved dealer
and brought to the site in maker's drums, kegs etc. with seal unbroken.
All materials not in actual use shall be kept properly protected, lids of containers shall be kept closed and surface of paint in
open or partially open containers covered with a thin layer of turpentine to prevent formation of skin. The materials which
have become stale or flat due to improper and long storage shall not be used. The paint shall be stirred thoroughly in its
container before pouring into small containers. While applying also the paint shall be continuously stirred in smaller
container. No left over paint shall be put back into stock tins. When not in use, the containers shall be kept properly closed.
If for any seasons, thinning is necessary, the brand of thinner recommended by the manufacturer shall be used.
The surface to be painted shall be thoroughly cleaned and dusted. All rust, dirt and grease shall be thoroughly removed
before painting is started. No painting on exterior or other exposed parts of the work shall be carried out in wet, damp of
otherwise unfavorable weather and all the surfaces shall be thoroughly dry before painting work is started.
Brushing operations are to be adjusted to the spreading capacity advised by the manufacture of particular paint. The paint
shall be applied evenly and smoothly by means of crossing and laying off. The crossing and laying off consists of covering the
area over with paint, brushing the surface hard for the first time over and then brushing alternately in opposite directions
two or three times and then finally brushing lightly in direction at right angles to the same.
In this process, no brush marks shall be left after the laying off is finished. The full process of crossing and laying off will
constitute one coat.
Each coat shall be allowed to dry completely and lightly rubbed with very fine grade of sand paper and loose particles
brushed off before next coat is applied. Each coat shall vary slightly in shade and shall be got approved from Engineer-in-
charge before next coat is started.
Each coat except the last cost shall be lightly rubbed down with sand-paper of fine pumice stone and cleaned of dust before
the next coat is applied. No hair marks from the brush or clogging of paint puddles in the corners of panels angles of
mouldings etc. shall be left on the work.
Approved best quality brushes shall be used.
Mode of measurements & payment :
Any type of C.C. Central verges curbs surface shall be measured under this item.
All the work shall be measured not in the decimal system as executed subject to the following limits unless otherwise stated
(a) dimensions shall be measured to the nearest 0.01 metre.
(b) Areas shall be worked out to the nearest 0.01 Sq. metre.
No deductions shall be made for openings not exceeding 0.5 sq. mt. each and no addition shall be made for painting to
beadings, mouldings, edges, jambs, soffits, etc. of such opening.
The different surfaces shall be grouped into one general item, areas of uneven surface being converted into
equivalent plain areas in accordance with the mode of measurement for payment.
The rate shall be for a unit of one SMT.
Providing TMT Bar FE500D reinforcement for R.C.C. Work including bending,binding and placing in position complete
upto floor two level.
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge and/or his authorized
representative.
Mode of measurements shall be on Kg basis.
Providing and Casting in situ ordinary cement concrete M200 for R.C.C. Raft and cutt off walls including necessary
shuttering laying, vibrating, ramming and curing complete.(B) Walls, fom top of foundation level upto floor two level
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge and/or his authorized
representative.
Mode of measurements shall be on CMT basis.
Labour work for fixing interlocking blocks / any kind of pavement on up to 50 mm th sand bedding, levelling, watering and
fixing in line & level as well cleaning the site etc.comp. as directed.
Work shall be carried out as per item description including cost of all labour and materials etc. complete as
directed. General standard practice of laying of paver block is applicable.
The measurements shall be on SMT basis.
Item No.19,20,21
The colour and workmanship shall be in accordance with the Code of Practice for painting, and as specified in the drawings or
as directed by the Engineer
Materials: Synthetic enamel paint shall conform to IS.
The materials required for work of painting work shall be obtained directly from approved manufacturers or approved dealer
and brought to the site in maker's drums, kegs etc. with seal unbroken.
All materials not in actual use shall be kept properly protected, lids of containers shall be kept closed and surface of paint in
open or partially open containers covered with a thin layer of turpentine to prevent formation of skin. The materials which
have become stale or flat due to improper and long storage shall not be used. The paint shall be stirred thoroughly in its
container before pouring into small containers. While applying also the paint shall be continuously stirred in smaller
container. No left over paint shall be put back into stock tins. When not in use, the containers shall be kept properly closed.
If for any seasons, thinning is necessary, the brand of thinner recommended by the manufacturer shall be used.
The surface to be painted shall be thoroughly cleaned and dusted. All rust, dirt and grease shall be thoroughly removed
before painting is started. No painting on exterior or other exposed parts of the work shall be carried out in wet, damp of
otherwise unfavorable weather and all the surfaces shall be thoroughly dry before painting work is started.
Brushing operations are to be adjusted to the spreading capacity advised by the manufacture of particular paint. The paint
shall be applied evenly and smoothly by means of crossing and laying off. The crossing and laying off consists of covering the
area over with paint, brushing the surface hard for the first time over and then brushing alternately in opposite directions
two or three times and then finally brushing lightly in direction at right angles to the same.
In this process, no brush marks shall be left after the laying off is finished. The full process of crossing and laying off will
constitute one coat.
Each coat shall be allowed to dry completely and lightly rubbed with very fine grade of sand paper and loose particles
brushed off before next coat is applied. Each coat shall vary slightly in shade and shall be got approved from Engineer-in-
charge before next coat is started.
Each coat except the last cost shall be lightly rubbed down with sand-paper of fine pumice stone and cleaned of dust
before the next coat is applied. No hair marks from the brush or clogging of paint puddles in the corners of panels
angles of mouldings etc. shall be left on the work.
Approved best quality brushes shall be used.
Mode of measurements & payment :
Any type of C.C. Central verges curbs surface shall be measured under this item.
All the work shall be measured not in the decimal system as executed subject to the following limits unless otherwise stated
(a) dimensions shall be measured to the nearest 0.01 metre.
(b) Areas shall be worked out to the nearest 0.01 Sq. metre.
No deductions shall be made for openings not exceeding 0.5 sq. mt. each and no addition shall be made for painting to
beadings, mouldings, edges, jambs, soffits, etc. of such opening.
The different surfaces shall be grouped into one general item, areas of uneven surface being converted into
equivalent plain areas in accordance with the mode of measurement for payment.
The rate shall be for a unit of one SMT.
Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S. flats at
required spacings and frame alround, square or round bars with round headed bolts and nuts or by screws (A)
Plain Grill. (upto 10 ton) (R&B SOR year
Providing and fixing M.S grill of required pattem to wooden frame of windows etc.with M.S flats at reuired
spacing and frame around,square or round bars with round headed bolts and nuts or by screws (A) Plain Grill) .
Item should be executed as per site requirements and instruction given by Engg-in-charge
Mode of Payments shall be in Kg.
Seal and Signature of the Bidder Dy.CityEngineer(South Zone)
Amdavad Municipal Corporation
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
œrûtK Ítul Ítulj ytuVem,
~gtbt«mtœ bwFSo CJl bKeldh Vtgh MxuNlle mtbu,htbctd, brKldh, ybœtJtœ.
œrûtK Ítul xuLzh ltuxem lk-SZ- E Tender Notice No.05/2026-2027 /2022-23
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg<
mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt
mt&u) yawf mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh
xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb <&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkc< yJ~g œNtoJJtlt hnuNu. su
ftuLx[tfxh©eytuyu hSMx[uNl heLgw fhtJuj l ntug <u ftuLx[tfxh©eyu xuLzh ChJt lnek.
4. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu mhltb wMvÐ yûthtubtk jFJw.
5. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
6. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
7. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh
auf&e s MJefthJtbtk ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele
ykœtS< hfblt ftb btxu htufzt, jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e
Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
8. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
9. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g
10. Nh<e xuLzhtu hœ ct<j dKtNu.
11. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u
mbglu ftble BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ xuLzhhu
12. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
13. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm
fhelu s xuLzh btufjJw.
14. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu htufzt, jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/
vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
15. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto
Jdhle mne mefft fhe mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
16. mœh xuLzhle ytRxbtult CtJtu ltKt Ft<t lt mhfgwjh lk.38, <t.21/11/22 <&t mûtb m•ttle b¤uj bkswhe bwsc
GST rmJtg dKºtebtk juJtbt ytJuj <&t «Jo<btl rlgb bwsc GST awfJJt vtºt &Nu su&e <btb cezomu <u bwsc
dK<he fhe xuLzhtu ChJtlt hnuN.u
17. mœh xuLzh yk<od<lt ftb mkjøl y.Bgw.ftu.btk vJo<btl <btb rlgbtu/mhfgwjhtu jtdw vzNu <ubs JF<tu JF< <h
mw^thtytu vK jtdw vzNu. sule ltuk^ jR xuLzhtu ChJtlt hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h, ybœtJtœ” lt ltbltu fZtJJtu.
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
General terms & conditions
1. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water
Resources Department with the latest correction slips may be referred for quality of
construction & standard of Procedure (SOP). (only English version)
2. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
3. Wherever a reference to any Indian standard appears in the specifications, it shall be
taken to mean as reference to the latest edition of the same of force on the date of
4. In "Mode of measurement" in the specifications wherever a dispute arises in the
absence of specific mention for a particulars point / aspect, the same in the relevant
Indian Standards shall be referred to.
5. All measurement and computations, unless otherwise specified shall be carried out
nearest to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
6. Definite particulars covered in the items of work, though not mentioned or elucidate
in its specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or
AMC's Consultant shall not absolve the contractor from the responsibility of
replacing defective materials brought on site or materials used in the work found
defective at a later date. The contractor shall have no claim to any payment or
compensation whatsoever on account of any such materials being rejected by the
Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all
9. All materials including those of electrical shall be got approved by the Engineer in
charge/ Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall
be removed from the site of work within 24 hours.
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work as
well as for checking lines, levels, alignment of the works & all precautionary
measures during execution shall have to be kept in sufficient numbers and in good
working condition at the site of the work.
13. Special modes of the construction not adopted in general Engineering practice, if
proposed to be adopted by the contractor shall be considered only if the contractor
provided satisfactory evidence that such special mode of construction and completion
of work to the required strength and quality. Acceptance of the same by the Engineer
in charge shall not however, absolve the contractor from the responsibility of any
adverse effect and concordance of adopting the same in the course of exaction or
completion of the work.
14. The contractor shall be responsible for observing the rules and regulation imposed
under the "Minor Mineral Act", and such other laws and rules prescribed by the
Government from time to time.
15. All necessary safety measures and precautions (incl. those laid down in the various
relevant Indian Standard) shall be taken to engrave the safety of men, materials and
machinery on the work and also of the work itself.
16. Quantity measured in the tender is approximate. It may increase or decrease looking
to the quantum of actual work for which no any claim shall be entertained by A.M.C.
17. Contractor shall have to execute extra item if required only after necessary permission
18. The work in general shall be carried out as per standard specifications of the relevant
items to be executed & as per the instruction of Engineer in charge & as per the
guidance of AMC's Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be binding
on the contractor. The contract agreement shall have to be executed between AMC &
the agency to which work is awarded for execution.
20. The time limit shall be reckoned after next day from the date of issue of the written
work order to the contractor after fullfillng the formality life SD & Agreement. No
time extension will be granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this tender, the interpretation
given by Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to
the Contractor.
22. The contractor shall take no advantage of any apparent error or omission in drawing
or specification and the Engineer -in-charge shall make such corrections and
interpretations as necessary to fulfill the intent of the plants and specifications.
23. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity
24. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
25. No any kind of price rise / price escalation / price variation for cement , steel or
labour shall be paid.
26. Contractor is requested to see the site physically before tendering. He is also
requested to quote the rates keeping in view of all the points mentioned in relevant
pages of tender documents.
27. Water Supply: The contractor shall arrange at his own cost, a suitable supply of
piped water for the construction of the works and provide a satisfactory supply of
potable water for drinking, washing, sanitation and cleaning down. The contractor
will be responsible for all the costs where applicable of connection, meter installation,
water consumed, water required for testing purposes, disconnection and the laying,
maintenances and ultimate removal of any distribution system around the site.
28. Electricity: Electric supply will be made available at the site by the Contractor and
the contractor must make his own arrangements with the Corporation and Electricity
Supply Authorities and with other contractors to connect and to take a supply from
such services, paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the
site for purpose of the work and shall pay such charges as is fixed by the appropriate
supply Authorities.
In case there is any delay in supply of power site of any interruption or fault in the
power during the work. No compensation shall be paid for idle labor staff,
machineries and for use of diesel operating sets etc. as the case may be.
29. Tenders shall submit all the valid/certified documents in support of their
initial/eligibility criteria mentioned above along with the bid. They shall have also to
submit the income tax clearance certificate and solvency certificate.
30. No advance such as secured advance machinery advance, mobilization advance or
materials advance will be given.
31. The contractor shall get the electrical works executed through the authorized
Government approved licensed electrical person or firm in appropriate category in
accordance to contractual provisions.
32. The electrical works shall be carried out strictly in accordance with the directives
issued by Engineer in charge.
33. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work
changes & thereby total amount of work increases/ decreases.
changes & thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical
decision what so ever.
34. In case of any dispute, decision of Municipal Commissioner shall be final and binding
on the contractors.
35. Tenders which do not fulfill all or any of conditions or are submitted incomplete in
any respect will be rejected. Municipal Commissioner reserves the right to
increase/decrease the scope of work. No any claim to that effect shall be entertained.
The Municipal Commissioner also reserves the right to reject any or all the tenders
without assigning any reason thereof.
36. The contractors are requested to quote their rates considering above tender conditions.
37. The contractor shall have to paid balance Security Deposit within 10 days from the
date if issue of Letter of Interest (LOI). And after paying the balance S.D. the time
limit will be started & Execution of Agreement to be done than after.
In case of delay in paying balance S.D. by more than 10 days penalty at the
rate of 0.01% of sanction tender amount per day will be deducted from the Bill.
Eventhough in special case, if work is not started because of monsoon or any
other special reason (like site is not available), after evaluation of situation the actual
date of starting of work will be consider after approval of Dy.M.C. (South zone)
38. The Contractor shall not claim for increase or decrease in the quantity of the item or
the scope of work.
39. The payment shall be made as per the A.M.C policy for the work done by the
40. Conditional tenderes will not be accepted.
41. The Contractor must be followed the rules and regulations for COVID-19 as per
guidelines published by WHO/ Center government/State government /Ahmadabad
municipal Corporation.
SLA Breach and Penalty Clause for Road & Footpath Complaints
1. Complaint Resolution within SLA:
The Contractor/ Agency shall attend to and completely resolve all complaints related to Road and Footpath
works within the prescribed Service Level Agreement (SLA) time limit mentioned in the tender. The SLA
period shall be calculated from the date and time of registration/allotment of the complaint.
2. SLA for Road & Footpath Complaints:
િનભાવના કાયની આવતી સી.સી.આર.એસ, ફ રયાદો ની કામગીર SLA (Service Level Agreement) િપર યડમાં િનકાલ
ફર યાત કરવાનો થાય છે જો આવેલ ઓનલાઈન સી.સી.આર.એસ. ફ રયાદનો તેના SLA (Service Level Agreement)
BUILDING CATEGORY
Sr.No. Category Problem SLA Penalty per one
Problem Per day in
1 Public Building No Water Supply in Public Building 24 Hours
2 Public Building Public toiles and urinals-repairing of doors, 360 Hours
windows, tiles, ceiling, plaster and others
3 Public Building Muni. school repairing and other maintenance 168 Hours
Sr.No. Category Problem SLA Penalty per one
Problem Per day in
1 Water>>Engineering Inadequate water or low inflow pressure-Eng 240 Hours
2 Water>>Engineering Leakage In pipe Line-Eng 48 Hours
3 Water>>Engineering Water quality-polluted water-Eng 24 Hours
4 Water>>Engineering No Water Supply-Eng 240 Hours
5 Water>>Engineering Water-other 72 Hours
DRAINAGE CATEGORY
Sr.No. Category Problem SLA Penalty per one
Problem Per day in
1 Drainage Engineering No Drainage Machine hole Cover-Eng 24 Hours
2 Drainage Engineering Frequent Breakdown & Blockage Of Drain- 96 Hours
Sr.No. Category Problem SLA Penalty per one
Problem Per day in
1 Road Pot holes on the road 24 Hours
2 Road Patch work Relaying of a portion of road 72 Hours
3 Road Deep pit-large Settlement of road 48 Hours
4 Road Removing of waste-Dust laying on both side of 72 hours
the road after resurfacing
5 Road Road Other 48 Hours
6 Footpath Road-Footpath Repairing 168 Hours
3. Penalty for Breach of SLA:
If any complaint is not completely resolved within the prescribed SLA period, the same shall be treated as
SLA Breach and the applicable penalty mentioned above shall be imposed on the Contractor/Agency.
4. Additional Penalty for Continued Delay:
If the complaint remains unresolved even after expiry of the SLA period, the applicable penalty shall be
recovered for every additional 24 hours or part thereof until the complaint is completely rectified and
verified by the concerned Engineer/authorized officer.
5. Actual Resolution and Verification:
Temporary barricading, placing of material, or initiation of work shall not be considered as resolution of
the complaint. The complaint shall be considered closed only after the required work is completed and the
same is verified by the concerned Engineer/authorized officer.
6. No Exemption on Account of Delay:
The Contractor/Agency shall not claim exemption from penalty merely on the ground that the work has
been started. In case the complaint continues to remain unresolved beyond the prescribed SLA, penalty
shall continue to accrue until satisfactory completion of the work.
7. Recovery of Penalty:
The penalty amount shall be recovered from the Contractor's running bill/final bill/security deposit or any
other amount payable to the Contractor by the Municipal Corporation, without prejudice to any other action
permissible under the tender/contract conditions.
8. Reopened/Unsatisfactory Complaints:
If a complaint is closed without satisfactory rectification and is subsequently reopened by the complainant,
the same shall be treated as an unresolved complaint and the applicable SLA/penalty provisions shall
continue to apply.
9. Repeated Delay:
In case of repeated failure to resolve complaints within the prescribed SLA, the Municipal Corporation
shall have the right to issue a warning/show-cause notice and take further contractual action, including
withholding of payment, recovery of additional expenditure, or other action as per the terms and conditions
10. Exceptional Circumstances:
Any extension of SLA shall be considered only in genuine circumstances beyond the control of the
Contractor and shall require prior approval Engineer In-charge. No extension shall be considered merely
due to shortage of labour, machinery, materials, traffic arrangements or other resources under the
Contractor's responsibility.
Signature of contractor with seal Addi. City Engineer(S.Z)
Date Ahmedabad Municipal Corporation
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One
Hundred Twenty Calendar days (120) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful
tender shall furnish to the Corporation Security Deposit of 5% (five percent) of the
contract price cheque or Bank Guarantee, pay order, or demand draft of Nationalized
Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE Add.City.ENGINEER
& STAMP (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 Month after the order to start the works. Progress of work should
be in proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any
accident. The contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the
traffic. He shall be responsible for any damage to public, If any incident happen, during the execution of
work. In case of dispute for unseen or overlooked items the decision of the Dy.City Engineer shall be final.
The contractor shall have to give site clean of all rubbish during the work and at the time of completion of
work and hand over the site with final finishing of the work as directed. All the rejected materials shall be
removed from site within 24 hours by contractor at this risk and cost. Debris shall have to cart daily from site.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he
shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not
available in SOR than based on current market rates. In case of extra item decision of Add. City Engg. shall
remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work
the contractor shall carry out the same at his quoted rates without charges any extra and the contractor will
have to carry out the works and he will be paid at the rate quoted by him. No claim for extra rate for
subsequent changes in site and design is entertained.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully
responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed the to
The tender for the work shall remain open for a period (120) days from the date of opening of the tenders for
this work and that the tenderer shall not be allowed to withdraw on modify the offer on his own during the
period. If any tenderer withdraw or makes any modifications or addition in the terms and conditions of his
tender not acceptable to the Municipal Corporation the Municipal Corporation shall without prejudice to any
right or remedy be at liberty to forfeit in full the said earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work the penalty
of Rs.- ( As per Form - B1) per day of delay shall be recovered from the immediate bills payable to the
contractor. Contractor has to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of demand
draft or in cash.
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form B1
can be is available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat booklets of
Building Works & and Road Works Specifications published by Gujarat Book Depot, Sector-21.
CONTRACTOR'S SIGNATURE ADD.CITY ENGINEER
& STAMP (South Zone)
yb>tJt> BGþrlrmrvj ftuvtuohuNl
œrûtK Ítul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau Bþsc Au.
"yt ftblt >huf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE
ytExbltu CtJ J^thtu ytvJtbtk ytJNu lrn. yBþf søgtyu swlt vÚ&h s VheJth heEMxux fhJtlt &Nu. <uJe
>huf ytExbbtk J^^x &tg fu ytExb yufÍefGþx l &tg <uÔþk vK clNu. ytlt btxu ftuEvK «fthle J¤<hle
btkdKe fhJtle hnuNu lrn fu CtJ J^thtu, vK ytvJtltu &Nu lrn. <ult btxu Ãþh<tk mt^ltu ylu bsqhtu ntug,
yuf mt&u yluf søgtytuyu ftb fhJtle ûtb<t ntug <ubKu s rJathelu xuLzh ChÔþk. bsqhtu l&e fu dtbzu s<t
hÌtt Au fu ntu¤e, lJhtºte, r>Jt¤e, jøl meÍl fu yLg <nuJthtubkt fu «mkdtubtk bsqhtu ytJ<t l&e <uJt fu ceò
ftuEvK cntlt nuX¤ ftb ck^ htFe NftNu lrn yLg&t rlgb bwscle vulÕxe ftb ck^ hnu fu MËalt fh<t
ytuAt bsqhtu ytJu <ulu je^u fhJtbtk ytJNu."
ftuLx[tfxhle mne yuzeu.mexe.yuLS.
rm¬t ylu btuctEj lkch (œrûtK Ítul)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SZ E Tender Notice No 05 2026 2027 Tender No 219.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].