Loading…
Loading…
Tender ID
Tender Value
₹4.4 L
EMD Value
₹5,000
Closing Date
19 Feb 2026, 4:00 pmClosed
Dy. Executive Engineer, Sachivalaya Complex Electrical Sub Division No 1, Gandhinagar.
SITC of Roof Top Solar System at Govt Dhobi Ghat at Circuit House Campus, Gandhinagar
275351
18/02 OF 2025/2026
Open
Electrical
Works
Gandhinagar
10 documents required · 10 mandatory
₹600
Yes
Executive Engineer, Sachivalaya Complex Electrical Division, Gandhinagar.
₹5,000
Yes
11 Feb 2026
11 Feb 2026
11 Feb 2026
19 Feb 2026
11 Feb 2026
Name of Work: SITC of Roof Top Solar System at Govt Dhobi Ghat at Circuit House Campus, Gandhinagar
Schedule showing (approximately) the materials to be supplied from the Public Works Store for work Contracted to be
executed and the rates at which they are to be charged for
Rate a which the materials will be charged the
Particulars Approximate quantity Place of Delivery
NIL NIL NIL NIL NIL
Sign of Contractor
Deputy Executive Engineer Executive Engineer
SC Electrical sub division No. 1 SC Electrical Division
Gandhinagar Gandhinagar
Name of Work: SITC of Roof Top Solar System at Govt Dhobi Ghat at Circuit House Campus, Gandhinagar
Qty Item Rate in Figure & Word Unit Amount
Supply, Installation, Testing & Commissioning of following size of Grid Tied Solar Power Plant with Solar Panels (ALMM approved): Frame
Material : Anodized Aluminum alloy Frame With Twin Wall Profile, Front Cover : High Transmission Low-Iron Tempered Glass (AR
Coated), High efficency and positive power tolerance Pmax: 0/+5, Module Efficiency should be approx. 19.5%-22%, Normal operating
temperature 45'C, Junction Box with Waterproof IP67 & MC4 Compatible and Enclosed with Bypass diodes, 100% Electroluminescence
test to ensure error free Modules, Thep. temp. co-efficient of the PV module shall equal or better than -0.45%/degree C. Solar PV modules
of minimum fill factor 75% to be used. Unit Production:- More than 4.5 Unit /kw /day (Actual)(1Year Avg) With 10 year Product warranty
and 25 year Linear Power Warranty includes all mechanical and electrical parameters of the Solar panel. Modules must be complied to the
DCR(Domestic content requirements). The Ration of AC to DC is 5:6 for the Installation capacity which are given in AC KW.
Solar Inverter: MPPT Range: MPPT Range: 80-1000 V , Max efficiency: 97.5% - 98.9%, O/p Frequency: 50/60Hz, Operating Altitude (m)
≤4000, O/p Power Factor: ~1, O/P THDi: <3%, Operating Tempreture Range: -25~60°C, Integrated protection of Inverter are Anti-islanding
Protection, Input Reverse Polarity Protection, Insulation Resistor Detection, Ground fault protection, Residual Current Monitoring Unit,
Output Over Current Protection, Output Short Circuit Protection, Output Over Voltage Protection, PV array string fault Protection. Protection
Degree: IP65, User Interface LCD & APP, Datalogger & Communication: GPRS / Wi-Fi.Integrated, Input Reverse Polarity Protection
Integrated, Insulation Resistor Detection Integrated, Residual Current Monitoring Unit Integrated, Output Over Current Protection Rupees
Integrated, Output Short Circuit Protection Integrated, Output Over Voltage Protection Integrated, Protection Degree: IP65, User Interface Forty Four
LCD & APP,Datalogger & Communication: GPRS / Wi-Fi, Module Mounting Structure: The mounting (Rectangular pipe / square pipe / Thousand
1 10 circular pipe) with requisite cross bars, nuts and bolts, etc. shall be Hot deep galvanized with minimum 80micron coating. The Rectangular 44081.45 Eighty One
kW / square /circular hollow pipe section used for the structure should have a minimum thickness of 2.0 mm. other than above, the material And Paise kW
thickness should be minimum 2.5 mm. A certificate of a structural engineer certifying the strength and stability of the mounting structure to Forty Five
withstand the weight and wind speed of 150 km/hour throughout the life span of 25 years of the system, shall be submitted by the vendors. Only
Hot Dipped Galvanized steel coils. suitable arrangement for base plate for foundation , solar panel mounting, the structure should be
suitable for carry the load of solar panel,wiring, sprinkler system etc. with necessary foundation work/wall mount, j bolt, anchor fastner etc.
the nut bolt used for installtion of stucture should be (SS 304) quality.The ground clearance of the bottom most edge of solar panel shall
not be less than 300 mm to 1200 mm or as per site’s technical/feasibility requirement.
a. Column –The minimum section (thickness) should be 60MM*40MM
b. Rafter - The minimum section (thickness) should be 60MM*40MM
c. Purlin - The minimum section (thickness) should be 40MM * 40MM Balane of System with necessary Swichgears (Suitabel size and
protection of ACDB & DCDB), inter connecting wiring, earthing system as per the CEIG drawing approval, lightining arrester system as per
the CEIG drawing approval, all liasoning work with various gov. dipartment like state nodal agency,DISCOM & CEIG is included in agency
scope (Excluding All charges namely GEDA Application fees, Solar connectivity Charges, Meter connectivity Charges, Meter testing
Charges and system stability/strenthning charges.) (B) Grid Tied Solar Power System: 7 - 10 kW (3 - phase)
Rupees Four Lakh(s) Forty Thousand Eight Hundred Fourteen And Paise Fifty Only
Sign of Contractor Deputy Executive Engineer Executive Engineer
SC Electrical Sub Division No. 1 SC Electrical Division
Gandhinagar Gandhinagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Eligibility Criteria for solar work-18 1.pdf
G S T LTR.pdf
GR.pdf
SBD Solar Vol II.pdf
SCHEDULE A AND B Dhobi Ghat Solar.pdf
Solar Terms and Conditions Annexures.pdf
notice no. 18.pdf
SBD Solar Vol I 11 02 2026.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .