Assistant Manager (North West Zone)
Repairing of existing footpath at Chanakyapuri Area and other different places in Gota ward, North West Zone.
346982
T.not.no.06/2026-27/T.no. 30
Open
Civil - All
Works
Ahmedabad
3 documents required · 3 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹10,000
19 Sept 2026
19 Sept 2026
19 Sept 2026
28 Sept 2026
19 Sept 2026
Name of work: Repairing of existing footpath at Chanakyapuri Area and other different
places in Gota ward, North West Zone.
ybœtJtœBgwÂlÂmvjftuvtuohuNl
bntldhmuJtmœl - lJtvrùbÍtul
W•thvrùbÍtulÍtuljytuVem,
yr<&e ntuxjltFtkatbtk, sSmckdjthtuz, ctuzfœuJ, ybœtJtœ.
W•thvrùbÍtul xuLzhltuxemlk-06/2026-27btkytJhejuJtgujftbtuleÂJd<tu
1. Wvhtuf<xuLzhtusu<u JdobtkbtLghSMx[uNl ^htJ<t ftuLx[tfxh©eytuyuChJt.
2. xuLzhlerlg<xuLzhVe<&t R.yub.ze. ck^ fJhbtkkWvhltmhltbuÁcÁ / hSMxhyu.ze./ MvezvtuMx/
fwhegh&erlg<mbgbtkbtufjJtlthnuNu.
3. ftuLx[tfxh©eytuyuxuLzhlemt&uBGþrlrmvjbtLghSMx[uNlle/ dJobuLxhSMx[uNlleftuve, (xuLzhftuve<&t yLgvwhtJtmt&u)
yawfmtbujfhJtlehnuNuylufJhWvhxuLzhlkch<&t ftuLxufxlkchsYhMvМNtoJJtltu hnuNu.ck^ fhJhWvhxuLzhltuxemlkch, xuLzhlkch,
ftblwkltb<&t, ftuLx[[tfxhlemkM&tlwkltb<&t ftuLxufxlkchyJ~gœNtoJJtlthnuNu. ftuLx[tfxhtuyuxuLzhbtcukflwltb, Ft<t lkch,
btRfhlkchylumhltbwMvÐyûthtubtkjFJw.
4. xuLzhVe vu ytuzoh / zebtLz z[tVx&eaqfJJtlehnuNu. œhufxuLzhœeXyjdxuLzhxuLzhVeChJtlehnuNu.
5. ytuAehfblexuLzhVe, R.yub.ze. fuxuLzhVe, R.yub.ze. ÂJltltxuLzhtuhœct<j (fuLmj) dKtNu.
6. xuLzhmt&uBþfJtbtkytJ<e yluoMxble, xuLzhlehfblt 1% «btKucukfduhLxe / zebtLz z[tVx / vu ytuzoh / jtufjbtRfhauf&e s
MJefthJtbtkytJNu. œhufxuLzhœeXyjdR.yub.ze. ChJtlehnuNu. R.yub.ze. hfbYt.
yuffhtuzmwDeleykœtS<hfbltftbbtxujtufjbtRfh auf, rzbtLz z[tVx, vu ytuzohfucukfduhkxeltMJYvbtk<&t Yt.
yuffhtuz&eWvhleykœtS<hfbltftbbtxuR.yub.ze.lehfbbtºtrzbtLz z[tVx, vu ytuzohfuckufduhkxeltMJYvbtkytvJtlehnuNu.
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g jFJtltu
hnuNu. ftuLx[t¾xhu vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu ftble
BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ >huf xuLzhh ujuJe.
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm fhelu s xuLzh
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh
fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb btºt
rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle mne
mefft fhe mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu
16. y.Bgw.ftuovtuo le yum.ytu.ve bwsc ftbdehe fhJtle hnuNu.sule ltuk^ >huf xuLzhhu juJe.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h, ybœtJtœ” lt ltbltu fZtJJtu.
The issuing branch of the bank guarantee shall be of Ahmedabad / Gandhinagar City only.
As per Government of Gujarat G.R. No. - EMD/10/2019/50/DMO Dt. 18/06/2019 & AMC Finance
Department, Circular No. (1) 48 Date:- 29/01/2012,(2) 58 Date 16/03/2012(3) 14 Date:-04/06/2013 (4)
Date:- 29/05/2018 (9) 12 Date:-22/07/2019, (10) Circular of Finance Department, AMC no. 26 Date:
25/11/2019 (11) Circular of Finance Department, AMC no. 21 Date: 19/06/2020 (12) Circular of Finance
Department, AMC no. 40 Date: 5/11/2020 (13) Circular of Finance Department, AMC no.12 Date:
14/6/2021 approved Banks are.
yt&e<btb Ft<tltJztyr^fthe©eytu/yuftWLx©e<&t rcjfjtfo©elusKtJJtbtkytJu Au
fu,rmfgwrhxezevtuÍex<ubsyluoMxblezevtuÍexMJefthJtctc<u
htsgmhfth©eîthtbksqh&gujcukftulegtœebtkltKtkrJCtdltS.yth. lk. EMD/10/2021/7729/ DMO Dt. 12/04/2021
bwscmw^thtufhelJegtœebtkcnthvtzJtbtkytJujAu.htsgmhfth©eltltKtkrJCtdltS.yth. lk. EMD/10/2021/7729/
îthtrmfgwrhxezevtuÍex<ubsyluoMxblezevtuÍexbtxubksqh&gujcukftulegtœeykduzu.Bgwrl.frbNlh©e(ltKtk)le
b¤ujbkswheltXhtJ ¢btkf 35 <t. 09/06/2021 bwscltmœhnwvrhvºt «rmæ^ ><theF&e <t. 31/03/2022
mw^ey&Jthtsgmhfth©eîthtytctc<u yLgS.yth «rmîfhJtbtkytJuðgtkmw^eyuluûth-I
btksKtJujcukftulecukfduhkxemefgwhexezevtuÍex<&t R.yub.ze.MJYvbtkMJefthJtbtkytJNu. suleFtmltuk^
juJtyt&esKtJJtbtkytJu Au.
A. Guarantees issued by following banks will be accepted as SD/EMD on permanent basis.
All nationalized Banks
B. Guarantees issued by following banks will be accepted as SD/EMD for the period up to
March- 31, 2022. The validity cut-off date in the GR is with respect to the date of issue of Bank Guarantee
irrespective of the date of termination of Bank Guarantee.
1 Commercial Banks :- 2 Co-operative and Rural Banks Of Gujarat :-
1. RBL Bank 1. The Mehsana Urban Co-operative Bank Ltd
2. Axis Bank 2. The Ahmedabad Mercantile Co-Operative Bank Ltd
3. ICICI Bank 3. NutannagrikSahakari Bank Ltd
4. HDFC Bank 4. The KalupurCommerical Co-operative Bank Ltd
5. Kotak Mahindra Bank 5. Rajkot NagarikSahakari Bank Limited
6. IndusInd Bank 6. The Gujarat State Co-Operative Bank
7. DCB Bank 7. Sarswat Bank
8. Tamilnadu Mercantile Bank 8. SaurashtraGramin Bank
9. Ujjivan Small Finance Bank
10. A U Small Finance Bank
11. Federal Bank
12. Equitas Small Finance Bank
13. Bandhan Bank
14. Standard Chartered Bank
15. City Union Bank
bu.Bgwrl.frb§h©e, ybœtJtœBgwrl. ftuvtuhuNlltmhfgwjh lk.-81, <t.26.02.2015 bwsc<btb
«fthlefLmx[fNlleyufxeJexebtkbwÏgftuLx[tfxh,mcftuLx[tfxhltsubswhtuftbdehefh<t ntug<u
<btbbswhtulwkdwsht<rcÕzekdyuLzy^hfLmx[fNlJfombtkhSMx[uNlfhtJJwkVhSgt< Au.
Tender Fee –900.00 Date of submission: 28/09/2026
Earnest Money-10,000.00 Date of Opening: 30/09/2026
Contractor’s Name& Address
AHMEDABAD MUNICIPAL CORPOATION
NORTH WEST ZONE - ENGINEERING DEPT.
TENDER ABSTRACT
Name of Work :- Repairing of existing footpath at Chanakyapuri Area and other different
places in Gota ward, North West Zone.
Sr. Quantity Item Unit Rate Amount
1 Dismantling the following including loading, unloading
and disposal of unserviceable material for all lead or as
directed by Engineer-In-Charge and stacking the
serviceable material and backfilling the resulting
trenches and pits complete.
a 270.00 central verge -kerb stone Rmt 8
b 140.00 Dismantling tiled or stone floors laid in mortar including Smt 27.44
stacking of serviceable material and disposal of
uservicalble material with all lead and lifts.
c 15.00 Demolition & disposal of unservisable material with all Cmt 348.1
lead and lift for unreinforeced concrete. (AMC sor)
d 15.00 Demolition of brick work & stone masonry including Cmt 314.5
stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift (1) In
e 10.00 Demolition including stacking of serviceable materials Cmt 604.74
and disposal of unserviceable materials with all lead and
lift. (I) R.C.C work.
2 Extra Rate Over Item of Excavation of Earth for
excavation of asphalt pavement / RCC of thickness up to
0.20 meter including demolishing the asphalt carpet,
metal,s oiling/cutting Reinforcement etc.comp. with
stacking the material as directed. (Based on Previously
approved rate by C E sir )
a 65.00 up to 0.20 meter thickness (By Manual) Smt 71.1
b 25.00 0.20 to 0.30 meter (By any type of Breaker Machine or Smt 177.76
R.C.C.Cutter machine including cost of operator, fuel, &
transportation etc complete.
c 15.00 0.30 meter & above (By any type of Breaker Machine or Smt 311.08
R.C.C.Cutter machine including cost of operator, fuel, &
transportation etc complete.
3 33.00 Dismantling of existing structural steel work for railing, Kg 2.05
grill, gate, grating,jali, etc including foundation, sorting
the dismantled material, disposal unserviceable material
with all lifts and up to any lead at non objectional place
and stacking the serviceable material (structural
elements) upto AMC store including loading, unloading
as directed by Engineer-in-charge.(CG Road Approved
4 135.00 Removal of existing any type of paving or paving stones Smt 43.75
of any type, any size, any thickness in required depth
including removing paver with spil sub base and breaking
sub base i.e concrete or metaling etc under the
supervision of concerned department, disposal
unserviceable material with all lifts and up to any lead at
non objectional place and stacking the serviceable
material (paver) upto AMC store including loading,
unloading as directed by Engineer-in-charge. (CG
Road Approved Rate)
5 135.00 Removal of existing kerb stones of any type, any size, any Rmt 13.39
thickness in required depth including removing kerb with
base PCC including excavation etc under the supervision
of concerned department, disposal unserviceable
material with all lifts and up to any lead at non
objectional place and stacking the erviceable material
(paver) upto AMC store including loading, unloading as
directed by Engineer-in- charge. (CG Road Approved
6 1.00 Removal Bus Shelter Removal of existing Bus Shelter with No 13392.9
all structure elements with seating arrangement, roof,
supports, advertise elements etc including excavation,
Breaking concrete foundation under the supervision of
concerned department, disposal unserviceable material
with all lifts and up to any lead at non objectional place
and stacking the serviceable material upto AMC store
including loading, unloading as directed by Engineer-in-
charge. (CG Road Approved Rate)
7 Repairing damaged M.H. and rasing M.H. up to road level
incl. removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I.
steps and existing MH sheet cover, removing the debris
from MH and carting the same as directed. (Based on
Drainage SOR 2009-10) Road Resurface zonal tender
approved rate 2022-23
a 20.00 (A) up to 0.15 mt. (@ Two Coarse) No 728.82
b 10.00 (B) up to 0.35mt. (@ Four Coarse) No 1155.44
c 5.00 (C) up to 0.65 mt. (@ Seven Coarse) No 1786.49
d 1.00 (D) up to 0.90 mt. (@ Ten Coarse ) No 2150.9
8 15.00 Repairing damaged I.C./ Raising removing damaged brick No 399.96
work and repairing by brick masonry in C.M. 1:5 and
plaster in C.M. 1:3 and fixing C.I. steps and existing
chamber sheet cover, removing the debris from chamber
and carting the same as directed. (Based on Drainage
SOR 2009-10) Road Resurface zonal tender approved
9 Conveyance charge of earth, lime, murrum, building
rubbish, manure, garbage, sludge, excavated rock, fly
ash, aggregates of any kind executed outside the road
site. Rate also includes spreading & levelling etc
complete. Internal conveyance above 50 mt done within
the work site is not payable. (R&B 2021-22 Statement
No.5 Page no.5 & RA Approved St.Com.Res
f 30.00 f) Lead From 5 Km to 10 Km. Cmt 78.54
g 10.00 g) Lead From 10 Km to 15 Km. Cmt 104.65
10 75.00 Barricading the entire break down or excavated area on Rmt 79.99
rental basis using wooden ballies / M.S.angles at max.
2.00 meter centre to centre, C.G.I. Sheet, reflective paint
/ Board outside to avoid accident & for smooth traffic
diversion & movement including cautionary board etc.
Item also includes for making temporary sufficient nos of
lighting arrangement throughout the work with
necessary required arrangement. ..The same shall be
removed after completion of work. (Only for break down
work from start to complete) (Based on Drainage SOR
2009- 10)Road Resurface zonal tender approved rate
11 20.00 Carting and Fixing M.H., Chamber or Catchpite Seat and No 746.59
Cover in line and level to match exisisting road level in
C.C. 1:2:4 and finishing smooth, watering and protecting
for 7 days etc. complete as directed. M.H. seat cover will
be supplied byA.M.C.(from any store) (AMC approved
12 15.00 Providing and placing in position 100 mm thick factory No 3240.79
made fair finish Precast RCC Rectangular frame &
perforated/ slotted Covers on drains Alcock, Vyara, of
footpath of various sizes, of M- 25 grade cement
concrete for RCC work, including cost of moulding,
reinforcement, rendering, etc i.c. cost of cartage, all
leads & lift, handling at site etc. all complete as per
direction of Engineer-in-Charge.(CG ROAD Approved
13 15.00 Box cutting the road surface to proper slope and camber Cmt 205.35
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 200 Mt. lead
14 20.00 Filling available excavated earth (excluding rock) Cmt 78.55
intrenches. plinth,sides of foundations etc. Inlayers not
exceeding 20cm. Indepth consolidating each disposited
layer by ramming and watering.(R&B Dist. AHMEDABAD
SOR 2021-22 No.4006 page No.43)
15 25.00 Filling in foundation and plinth with murrum or selected Cmt 192.45
soil in layers of 20cm. thickness including
watering,ramming and consolidating etc. complete. (R&B
Dist. AHMEDABAD SOR 2021- 22 No.04008A page No.43)
16 15.00 Providing and laying cement concrete 1:5:10 (1- Cement : Cmt 2492.51
5- fine sand : 10- graded brick bat aggregates 40mm
nominal size) and curing complete. SOR 23-24 IT NO
17 15.00 Providing and laying cement concrete 1:3:6 (1- Cement : Cmt 4006.15
3- Coarse sand : 6- Hand broken stone aggregates 40mm
nominal size) and curing complete.(R & B SOR Item code
05003A, NBO 5.3.2 Page 73) Road Zonal tender 2022-23
18 20.00 Supplying and Spreading good quality coarse sand free Cmt 312.5
from Impurities including Transporation to Site and
labour cost for Spreading etc. Comp. as directed.(
Approved AMC rate)Road Zonal tender 2022-23
19 Providing, laying, spreading and compacting graded
stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by
tipper to site, laying in uniform layers in sub- base / base
course on well prepared surface and compacting with
vibratory roller to achieve the desired density as per
Codal Provision.
a 40.00 Production & Supply of WMM Cmt 1975
b 40.00 Laying of WMM Cmt 35
20 40.00 Providing TMT Bar FE500D reinforcement for R.C.C. Work Kg 75.46
including bending,binding and placing in position
complete upto floor two level SOR 23-24 IT NO :05014C
21 10.00 Providing and Casting in situ ordinary cement concrete Cmt 4399.29
M200 for R.C.C. Raft and cutt off walls including
necessary shuttering laying, vibrating, ramming and
curing complete.(B) Walls, fom top of foundation level
upto floor two level (upto 10ton). SOR 23-24 IT NO
22 15.00 Providing & Applying Tri mix with Machine floater Smt 48.21
machine on constructed RCC work including Machine &
Labour etc Comp as directed.
23 15.00 Labour work for fixing any kind of paving with cement Smt 69.64
pointing in CM 1:2, including watering, ramming etc
comp. as dir.For pavement aI) Laying on Sand
bedding as per requirement to fix the C.C.Block /
Nibhada Stone in Line & Level
24 65.00 Supplying and fixing of 380 mm H x 300 mm L x 200 mm Rmt 431.96
B Kerb block for Central Verge in M-20 grade using
mm nominal size black trap aggregate of Sevaliya/Timba
or equivalent quality for pre-cast blocks, reasonably
exposed finish/ formwork, mould with well equipped
with vibratory system for kerb stones of approved design
including curing, etc. complete, including the cost of
formwork etc. complete. The rate shall also include
necessary cutting of asphalt, fixing the Kerb stones in line
and level on 5 cm thick sand bedding with necessary
equipments and materials. The rate shall also include the
flush pointing in CM (1:3) for all joints of the kerbstones.
Filling of zari alone the sides of the kerb stone fixed with
Bituminous concrete mixed in proper position as directed
by Engineer in change to form a portable mixture. In any
case Gravel or such type of materials shall not be allowed
for production.(AMC approved Rate )a) Laying on 5 cm
thick Sand Bedding
25 100.00 Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm- Rmt 350.89
H Kerb block for Footpath in M-20 grade using 20 mm
nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably
exposed finish/ formwork , mould with well equipped
with vibratory system for kerb stones of approved design
including curing, etc. complete, including the cost of
formwork etc. complete. The rate shall also include
necessary cutting of asphalt, fixing the Kerb stones in line
and level on 5 cm thick sand bedding with necessary
equipments and materials. The rate shall also include the
flush pointing in CM (1:3) for all joints of the kerbstones.
Filling of zari alone the sides of the kerb stone fixed with
Bituminous concrete mixed in proper position as directed
by Engineer in change to form a portable mixture. In any
case Gravel or such type of materials shall not be allowed
for production. (AMC approved Rate (a) Laying on 5 cm
thick Sand Bedding
26 20.00 Pre cast concrete kerb Providing and fixing M25 Grade of Rmt 1061.61
concrete precast exposed / Fair finish / texture finish
kerb stones of approved make as per approved sample of
any size and any type. Kerbs shall be fixed on the
foundation prepared as per approved design. The rate
shall also include for erecting and fixing the pieces in
position for complete kerb system with chamfered type
of kerbs including necessary accessories of kerb like
radius kerb, angles and quadrant kerbs, droplet kerbs
etc. complete as per drawing. Kerb shall be fixed as
paper joint without any jointing material. However
cement mortar shall be provided at the backside of kerb
stone joint. (Sample must be approved) Cost of
excavation, cutting , base , side filling shall includes as
directed engineer - incharge in above item description as
per BOQ (a) 450 hight x 600x 150 mm high median
kerb.As per approved rate
27 20.00 Pre cast concrete kerb Providing and fixing M25 Grade of Rmt 912.5
concrete precast exposed / Fair finish / texture finish
kerb stones of approved make as per approved sample of
any size and any type. Kerbs shall be fixed on the
foundation prepared as per approved design. The rate
shall also include for erecting and fixing the pieces in
position for complete kerb system with chamfered type
of kerbs including necessary accessories of kerb like
radius kerbs, angles and quadrant kerbs, droplet kerbs
etc. complete as per drawing. Kerb shall be fixed as
paper joint without any jointing material. However
cement mortar shall be provided at the backside of kerb
stone joint. (Sample must be approved) Cost of
excavation, cutting , base , side filling shall includes as
directed engineer - incharge in above item description as
per BOQ (b) 380 x 600 x 150 mm high Footpath kerb. As
per approved rate
28 20.00 Providing & laying Mountable type Central Verge Rmt 361.75
including casting of Kerb of size 15.00 x 32.50 Cm by
mechanical Kerb casting machinery and oil paint colour
to Center verge (Kerb) by Yellow/white and Black patta
(Three Coat) one coat of priming & two coat of oil Paint
including cost of material required for paint and all
labourworketc complete as per direction, detailed
drawing and instruction of engineer incharge .(Including
Epoxy Piant of Approved Quality) (Central Verge) Rate
Anlaysis as per AUDA tender
29 10.00 Supplying and fixing for central verge 230 mm L x 235 Rmt 1376.75
mm Width x 680 mm H Supplying & Fixing in M-20 grade
using 20 mm nominal size black trap aggregate of
sevaliya/timba or equivalent quality for pre-cast
blocks,reasonably exposed finish/formwork,mould with
well equipped with vibratory system for kerb stones of
approved design including curing,etc.complete,including
the cost of formwork etc.complete.THe rate shall also
include necessary cutting of asphalt,fixing the kerb
stones in line and level on 5 cm thick sand bedding with
necessary equipments and materials.The rate shall also
include the flush pointing in CM(1:3)for all joints of the
kerbstones.Filling of Zari alone the sides of the kerb
stone fixed with bituminous concrete mixed in proper
position as directed by engineer in charge to form a
portable mixture.In any case gravel or such type of
materials shall not be allowed for production. (based on
Road Project sor)
30 50.00 Providing and Laying of Rubber Moulded Paver Block Smt 501.6
Grey/Coloured 60 mm thick, M-35 Grade of any size ;
shape (Usually Uni-Paver Blocks) using black trap good
quality aggragate of 20 mm nominal size for footpath,
parking areas, service lanes and other areas as
mentioned in the drawing / instruction of engineer in
charge. Cost includes formworks using rubber mould,
Rate providing and laying paver blocks as per required
grading and specification. The paver block shall be
mechanically compacted. The work of paving blocks shall
be executed in line and level by skill mason of flooring
work only. It should be laid in such a way that the no
cutting of the paver block to be necessary. if cutting of
paver block necessary then it should be cut by machine
only and carting. The finished surface of the paver block
shall have resonably good, plain finished. Paver blocks
shall be compacted and shall be relaid if necessary.
Gravel or such type of materials shall not be allowed for
production. Laying on 5cms thick sand beddding.(AMC
approved Rate )
31 100.00 Providing and laying of interlocking grey Paver Blocks of Smt 572
high density 80mm thick made from M-40 grade
concrete using 6 mm to 20 mm machine crushed well
graded stone aggregate, sand of approved quality, OPC
53 grade cement with contractor's own concrete mix
design as approved by AMC, for parking, road. Cost
Includes formwork, using rubber/FRP mould, laying paver
block as per required grading and specification laid paver
block shall be mechanically compacted. The work of the
paving blocks shall be executed in line and level by skilled
mason of flooring work only. It should be laid in such a
way that the no cutting of the paver block to be
necessary. Cutting of paver block by machine cut only
and carting to be done. The Finished surface of the Paver
Block shall have reasonably good plain finish. Paver
blocks shall be compacted and shall be re-laid if
necessary. Gravel or such type of materials shall not be
allowed for production. Laying on 5 Cms thick sand
32 150.00 Paver Block Providing and laying shot blasted Non - Smt 669.65
interlocking, Paver blocks of specified thickness, size,
grade of concrete and colour machine made and blasting
by automatic shot blasting machine and high density of
as per approved sample of approved make for footpath,
parking areas, service lanes,cross over and other areas as
mentioned in the drawing. Including providing and laying
50 mm thick averave bedding layer of coarse sand below
paver block as per required grading and specification.
Laid paver block shall be mechanically compacted. The
work of the paving blocks shall be executed in line and
level by skilled mason of flooring work only. Small size of
paver block with same specification shall be used at
residue or at end. It should be laid in such a way that the
no cutting of the paver block to be necessary. If cutting
of paver block shall be required , than cut by machine
only and laying to be done by skilled flooring mason. The
finished surface of the paver block shall have coarse sand
Texture Finish. Pave blocks shall be compacted and shall
be re-laid if necessary. Actual laid area shall be measured
and paid without any wastage. (A) 60 mm thick M-35
grade Grey Paver block of size 200mm x 200mm.
33 30.00 Paver Block Providing and laying shot blasted Non - Smt 758.93
interlocking, Paver blocks of specified thickness, size,
grade of concrete and colour machine made and blasting
by automatic shot blasting machine and high density of
as per approved sample of approved make for footpath,
parking areas, service lanes,cross over and other areas as
mentioned in the drawing. Including providing and laying
50 mm thick averave bedding layer of coarse sand below
paver block as per required grading and specification.
Laid paver block shall be mechanically compacted. The
work of the paving blocks shall be executed in line and
level by skilled mason of flooring work only. Small size of
paver block with same specification shall be used at
residue or at end. It should be laid in such a way that the
no cutting of the paver block to be necessary. If cutting
of paver block shall be required , than cut by machine
only and laying to be done by skilled flooring mason. The
finished surface of the paver block shall have coarse sand
Texture Finish. Pave blocks shall be compacted and shall
be re-laid if necessary. Actual laid area shall be measured
and paid without any wastage. (A) 80 mm thick M-35
grade Grey Paver block of size 200mm x 200mm.
34 175.00 Labour work of fixing kurb any design of central verge, Rmt 136.4
(both side) footpath kurb, items includes necessary
excavation, asphalt cutting of any thickness, erecting in
line and position and pointing with cement mortar (1:3),
watering, etc complete, filling with zari along the side of
the kurb, the kurb stone fix prepared with bitumnious
top surface, as directed by engineer in charge.
35 175.00 Labour work for fixing interlocking blocks / any kind of Smt 68.64
pavement on up to 50 mm thick sand bedding,
levelling,watering and fixing in line & level as well
cleaning the site etc.comp. as directed.(AMC approved
36 40.00 Bitumen Cutting Labour charge of cutting in bituminous Rmt 113.39
pavement. Cutting to be done with heavy duty tandom
cutting machine consist of diamond blade. Minimum
cutting depth shall be 75 mm from the finished level.
Cutting shall be perfeclty in line. The width and depth of
the removal of asphalt towards kerb stone shall be as per
the drawing. Bitumen shall be carefully removed so that
the the cutting edge towards the road should not be
disturbed. The work of removal of the asphalt will be
considered in this item as running meter of the cutting
done by machine. One cutting line will be considered per
length of the kerb stone. Bitumen and other debris shall
be disposed within 10.0 km. as per the instruction of the
engineer in charge. Surroundings shall be cleaned to the
satisfaction of the engineer in charge.
37 50.00 Removing and refixing of kerb Removal of Rmt 72.32
existing kerb stones of any type, any size, any thickness
in safe manner with base PCC including excavation etc
and refix the same as desired location as per drawing and
as directed by Engineer in charge. Rate shall be inclusive
of removing with all subbase (including excavtion),
refixed the same (approved before reuse) on existing
base PCC, addition kerb of same profile (if required and
shall be paid relevant tender item), disposal
unserviceable material with all lifts and up to any lead at
non objectional place and stacking the serviceable
material (paver) upto AMC store including loading,
unloading as directed by Engineer-in- charge.
38 150.00 Filling Zari Filling of Zari along the sides of the kerbstone Rmt 50
fixed, prepared with Bituminous Concrete mixed in
proper proportion as directed by Engineer- In - Charge to
form a pourable mixture. (Street Devlopment of
Dehgam Road From Devi Cinema road tender)
39 53.00 Providing and laying cement concrete tactile tile (for Smt 702.24
vision impaired persons as per standards) of size 300 x
300 x 25 to 30mm of Vyara, Super, Nishu approved make
and pattern having water absorption not over 6% and
conforming to IS: 13801:1993, of approved make,
pattern and shade (with UV light resistant colours from
Lanxess only) in outdoor floors such as footpath, court
yard, multi modals location etc., laid on 30 to 40mm
thick base of cement mortar 1:4 (1 cement : 4 coarse
sand) in all shapes & patterns including grouting the
joints with white cement mixed with matching pigments
etc. complete as per direction of Engineer-in-Charge.(CG
Road Approved Rate)
40 401.00 Painting Two Coats on divider and footpath curb surface Smt 71.86
/ New Concrete Surface ( Painting two coats after filling
the surface with synthetic enamel paint in all shades on
new plastered concrete surfaces) (AMC approved Rate )
41 Providing and setting 50 to 60 mm thick rouge kotah
stone water table in line, level and in required gradient
including 25 mm thick beddcing in C.M. 1:6 (1 Part of
cement : 6 Part of coarse sand) with sufficient ramming
consolidation. Providing joints in C.M. 1:3 (1 Part of
cement : 3 Part coarse sand) and smooth pointing in C.M.
1:1 (1 Part of Cement, 1 Part of coarse sand) including
watering etc. complete and as per details in tender
specification & as directed by engineer in charge. (SMC
Approved tender Rate) Road Zonal tender 2022-23
b 75.00 Size : 1' x 1'(40 to 50 mm thick) Smt 103.52
42 25.00 Providing and fixing 75 mm thick Tree Grating No 836.61
950*950*75 mm as per design and drawing. The rate
shall be inclusive of providing and laying 50 to 80 mm
thick average bedding layer of coarse sand below tree
grating as per required grading and specification. The
centre of the grating to be same as the centre of the tree
trunk. The grating to be 8 pieces as per drawing. The
work of the grating blocks shall be executed in line and
level by skilled mason of flooring work only. (Sola
Scienecity Road tender Rate)
43 40.00 Paver Block Providing and laying, Dished Channel Rmt 907
specified thickness, size, grade of concrete and colour
machine made and blasting by automatic shot blasting
machine and high density of as per approved sample of
approved make for suite drain besides paking area and
other areas as mentioned in the drawing. Including
providing and laying 50 mm thick average bedding layer
of coarse sand below dished channel as per required
grading and specification. Laid dished channel shall be
mechanically compacted. The work of the dished channel
shall be executed in line and level by skilled mason. Small
size of dished channel with same specification shall be
used at residue or at end. If cutting of dished channel
shall be required , than cut by machine only and laying to
be done by skilled flooring mason. Actual laid area shall
be measured and paid without any wastage. (A) 600 mm
X 300 mm X 100 mm thick M-25 grade Grey dished
44 12.00 P/L Ready Mix controlled cement concrete M. 200 & Cmt. 3980.17
curing complete, excluding the cost of form work and
reinforcement for reinforced concrete work in
45 67.00 Providing, supplying and fixing precast C.C. blocks (M-20) Rmt 219
edge kerb having size of 75 x 300 x 300 mm depth and as
per design conveying it to the site, jointing into C:M 1:3
and racking out the joints incl. necessary excavation of
asphalt, soil etc..completed.
46 32.00 Scraping oil paint from steel and other Metal Surface and Smt 48.83
making the surface even ( with Hand scraping) bilding
SOR 23-24 item code-0 page-141
47 29.00 Applying priming coat over old kerb surface after and Smt 19.46
including,preparing the surface with ready mixed priming
paint brushing red lead
% ABOVE or % BELLOW
CONTRACTOR'S SIGNATURE ADD.CITY ENGINEER
& STAMP (North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
"North West Zone, Zonal Office", Nr. Atithi Hotel, Bodakdev Ahmedabad.
Municipal Commissioner invites Percentage Rate sealed tenders from interested contractors .
1 Name of work Repairing of existing footpath at Chanakyapuri Area and other different
places in Gota ward, North West Zone.
2 Time Limit 12 Mornth
3 Eligibility Criteria Register “E-2” class in PWD in Govt. R&B/CPWD/AMC or equivalent
registration with any other state Govt. or institutions.
4 Estimated Cost put to tender RS.
5 Earnest Money Deposit RS 10,000.00 Demand Draft, Pay order, or Cheque ,Bank
Guarantee(As per finanance circular No 22) in favour
of Municipal Commissioner, Ahmedabad) To be
submitted as prescribed in 7.0 below. Demand Draft
or Bank Guarantee shall be from Nationalized Bank
and valid for 120 days.
6 (A) Security Deposit: 5% of Tender Amount
(B) Retention 1. @ 2% of the value of work done will be deducted from each RA bill. It
will be released along with release of payment of Final Bill.
7 Tender fees (Non refundable) RS 900.00 Demand Draft / Pay order in favour of Municipal
Commissioner, Ahmedabad
8 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with Tender as
Tender Fees described in the invitation of tender and submitted to Assistant
Manager(North West zone) , Ahmedabad Municipal Corporation, North
West Zone, Zonal Office", Nr. Atithi Hotel, Bodakdev Ahmedabad
9 Tenders issue Tenders from the AMC website http://amc.nprocure.com shall be
down loaded from
10 Last date of receiving 29/09/202 TO 17.00 hrs only. The tenders received after
this date and time will not be entertained under any circumstances.
11 Date of Opening 30/09/2026 TO 12.00 hrs to Assistant Manager "North West
this date and time will not be entertained under any circumstances. Zone
Office", RajmatavijyarajeSindhiyabhavan,Nr.Atithi dining
hall,Judjesbunglow road, Bodakdev
12 Mode of sending the Tender Document shall be submitted in sealed envelope systems By RPAD/ Speed
Document post/ Hand Delivery/ Courier in sealed covers as described in submission of
13 Terms, Condition, & All general condition of contract of Form B1 condition of contract shall be
Specification applicable.
14 liquidated damages- 10% of the Amount For Balance work After Date of Completion or
Compensation For Delay extended time Limit.
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any or all the tenders
without assigning any reasons thereof.
CONTRACTOR'S SIGNATURE ADD.CITY ENGINEER
& STAMP (North West Zone)
- The Defects Liability period shall be as under-
(a) for all works costing upto Rs. 50.000/- (amount put to tender) the period shall be 3 months from the certified
date of completion.
(b) for all works more than Rs. 50,000 and upto Rs. 1 crore (amount put to tender) the period shall be 6 months
from the certified date of completion or one monsoon, whichever is later
(c) for major projects costing more than Rs. 1 Crore, the period shall be 12 months from the certified date of
completion which should include one monsoon. For the purpose of deciding the monsoon period the 30th
September may be treated as the last date.
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (Hereinafter called “the Employer”) invites
sealed Tender document from reputed and qualified bidders for the construction of Works
detailed in the Table below:-
Sr. Name of Works Approximate value Bid Security Completio
No. of works (Rs.) (Rs.) n Period
1 Repairing of existing footpath RS 999996.83 RS 10,000.00 12 mont
at Chanakyapuri Area and hs
other different places in Gota
ward, North West Zone.
2 Tender (a complete set of bidding document) fee shall be Rs 900.00 in the form of Demand Draft
/ Pay Order from any Nationalized Bank in favor of MUNICIPAL COMMISSIONER, Ahmedabad, payable
at Ahmedabad, which shall be non refundable. The fees shall be paid at the time of submitting the
3 Interested bidders shall download the tender documents from website http://amc.nprocure.com.
UP TO DT. 28/09/202 at 18.00 HR tender fee as mentioned in clause 2 above shall be paid by
the bidder at the time of bid submission
4 All bids must be accompanied by Bid Security of the amount specified for the Works in the above Table
payable at Ahmedabad and drawn in favor of AHMEDABAD MUNICIPAL CORPORATION, Ahmedabad. Bid
Security will have to be in any one of the forms as specified in Clause of ITB (Instructions to Bidders).
5 All Bids must be delivered to Assistant Manager "North West Zone, Zonal Office", Nr. AtithiHotel,Bodakdev
Ahmedabad. Not later than DT. 29/09/2026 17.00 HR
Tender (a complete set of bidding document) fee shall be RS 900.00 in the form of Demand
6 Draft / Pay Order from any Nationalized Bank in favor of MUNICIPAL COMMISSIONER, Ahmedabad, payable
at Ahmedabad, which shall be non refundable. The fees shall be paid at the time of submitting the tender.
CONTRACTOR'S SIGNATURE ADD.CITY ENGINEER
& STAMP (North West Zone)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
NORTH WEST ZONE
DETAILS OF BANK ACCOUT
1 Contractor's name
3 Telephone/ mobile no.
4 Permanent account no. (PAN no.)
5 Name of the bank
6 Branch name and address
11 Contractor/ supplier's signature
TENDER DECLARATION FORM
Additional City Engineer
North West Zone
Ahmedabad Municipal Corporation
RajmatavijyarajeSindhiyabhavan,
Nr.Atithidining hall, JudjesBunglow Road, Bodakdev
Name of Work: Repairing of existing footpath at Chanakyapuri Area and other different places in Gota
ward, North West Zone.
I/We the undersigned have carefully gone through and clearly understood the Tender documents of
above mentioned project comprising of Notice Inviting tenders, Articles of Agreement, Scope of work, Definition
of terms, notes Instructions/Information to Bidder, Condition of Contract, special condition of contract,
Appendices, Specifications, Bill of Quantities, furnished by AHMEDABAD MUNICIPAL CORPORATION.
I/We do hereby offer to execute and complete the whole of the work within the time specified all in
accordance with the specification, designs, drawing and instruction in writing referred to in the said document
and with such materials as mentioned for, at the respective rates which I/we have quoted in the Price Bid or at
such other rates as maybe fixed under the provisions of these conditions.
In the event of this tender being accepted I/We agree to enter into an agreement and when required,
execute the contract, according to agreement as or in default where of I/we bound myself/ourselves to forfeit
the "Earnest Money Deposit."
I/We understand that if I/We shall not enter in agreement within fifteen days or as decided by AMC
from the date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and take
necessary action as deemed fit.
I/We have enclosed a Demand Draft / Bank Guarantee as an “Earnest Money Deposit", for the sum as
mentioned in NIT, the full value of which is to be absolutely forfeited to the Employer If I/We fail to commence
the work specified. Otherwise the Employer shall retain the said sum, as on account of such Security Deposit as
provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other than those that may be approved in accordance with
conditions in the aforesaid documents.
I/We understand that Municipal Commissioner is not bound to accept the lowest or any tender, which
are received. I/We also understand & agree that Municipal Commissioner Reserves the right to allot number of
tenders to successful bidders at his sole discretion in case if I/We am/are lowest in more than one tender.
I/We am/are bound to execute the job if the work order is issued within 90 days from the date of
opening of the tender.
I/We agree to pay the Government income-Tax, Sales-Tax (Central and State), Octroi duties, Royalty on
material (i.e. Aggregate, Sand etc.) And any other taxes prevailing and from time to time on such items on
which the same are leviable and the rates quoted by me/us are inclusive of the same.
Yours faithfully
Seal and Sign of Contractor
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central Govt.
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at
different sites simultaneously. Contractor's having labour force available during festivals shall only
apply. Contractor can not stop the work due to on availably of labour force.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate bills of
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then
contractor shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as directed"/approved" by
the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to mean
as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of specific
mention of a particular point or aspect, the provisions on these particular points, or aspects in the
relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest to the
following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route and not
necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall be
taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of work is
in the form of a designation containing the number of the specification of the material and prefix
20. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve the
contractor from the responsibility of replacing defective material brought on site or materials used
in the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
23. Collection of approved materials shall be done at site of work in a systematic manner. Materials
shall be stone at site of work in a systematic manner. Materials shall be stored in such a manner as
to prevent damage, deterioration or intrusion of foreign matter and to-ensure the preservation of
their quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from the
site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient numbers
and in good working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the particular
27. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient numbers
and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or over
loading of the various components of the structure during execution or after completion of the
29. All necessary safety measures and precaution (including those laid down in the various relevant
Indian Standards) shall be taken to ensure the safety of men, materials and machinery on the works
as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one percent
towards testing charges is separately made.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar days
(120) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall furnish to
the Corporation Security Deposit of 5% (five percent) of the contract price cheque or Bank
Guarantee, pay order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE ADD.CITY ENGINEER
& STAMP (North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 Month after the order to start the works. Progress of work should be in
proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The contractor
shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic. He shall be
responsible for any damage to public. If any incident happen, during the execution of work. In case of dispute for
unseen or overlooked items the decision of the Dy. City Engineer shall be final. The contractor shall have to give
site clean of all rubbish during the work and at the time of completion of work and hand over the site with final
finishing of the work as directed. All the rejected materials shall be removed from site within 24 hours by
contractor at this risk and cost. Debris shall have to cart daily from site.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he
shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not available in
SOR than based on current market rates. In case of extra item decision of Add. City Engg. shall remain final
regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work
the contractor shall carry out the same at his quoted rates without charges any extra and the contractor will
have to carry out the works and he will be paid at the rate quoted by him. No claim for extra rate for subsequent
changes in site and design is entertained.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully
responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed the to
The tender for the work shall remain open for a period (120) days from the date of opening of the tenders for
this work and that the tenderer shall not be allowed to withdraw on modify the offer on his own during the
period. If any tenderer withdraw or makes any modifications or addition in the terms and conditions of his
tender not acceptable to the Municipal Corporation the Municipal Corporation shall without prejudice to any
right or remedy be at liberty to forfeit in full the said earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work the penalty
of Rs.- ( As per Form - B1) per day of delay shall be recovered from the immediate bills payable to the
contractor. Contractor has to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of demand
draft or in cash.
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form B1 can
be is available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat booklets of Building
Works & and Road Works Specifications published by Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'S SIGNATURE ADD.CITY ENGINEER
& STAMP (North West Zone)
TECHNICAL SPECIFICATIONS
Name of work : Repairing of existing footpath at Chanakyapuri Area and other different places in Gota
ward, North West Zone.
Dismantling the following including loading, unloading and disposal of unserviceable material for all
lead or as directed by Engineer-In-Charge and stacking the serviceable material and backfilling the
resulting trenches and pits complete.
a. central verge -kerb stone.
b. Dismantling tiled or stone floors laid in mortar including stacking of serviceable
material anddisposal of unserviceable material with all lead and lifts.
c. Demolition & disposal of unserviceable material with all lead and lift for unreinforced
d. Demolition of brick work & stone masonry including stacking of serviceable
materials and disposal of unserviceable materials with all lead and lift (1) In cement
e. Demolition including stacking of serviceable materials and disposal of
unserviceablematerials with all lead and lift. (I) R.C.C work.
The demolition shall consist of demolition of one or more parts of the structure as specified or shown
in the drawings. Demolition implies taking up or down or breaking up. This shall consist of
demolishing whole or part of work including all relevant item as specified or shown in the drawings.
The demolition shall always be planned before hand and shall be done in reverse order of the one in
which the structure was constructed. Contractor is fully responsible for proper and safe demolition.
Necessary dropping, shoring and under pinning shall be provided for the safety of the adjoining work
or property, which is to be left intact, before dismantling and demolishing is taken up and the work
shall be carried out in such a way that no damages is caused to the adjoining property.
Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary precautions
shall be taken to keep the dust nuisance down as and where necessary.
Dismantling shall be commenced in a systematic manner. All materials which are likely to be damaged
by dropping from a height or demolishing roof, masonry etc. shall be carefully dismantled first. The
dismantled articles shall be properly stacked as directed.
All materials obtained from demolition shall be the property of Government unless otherwise d shall
be keptin safe custody until handed over to the Engineer-in-charge.
Any serviceable materials, obtained during dismantling or demolition shall be separated out and
stacked properly as directed, with all lead and lift. All unserviceable materials, rubbish etc. shall b
stacked as directedby the Engineer-in-charge.
On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
Mode of measurements & payment :
Measurements of all work except hidden work shall be taken before demolition dismantling and no
allowance for increase in bulk shall be allowed. The demolition of lime concrete shall be measured
under this item. Specification for deduction for voids, openings etc. shall be on same basis as that
employed for construction of work.
All work shall be measured in decimal system as fixed in its place subject to the following limits, unless
otherwise stated hereinafter : (a) Dimensions shall be measured to the nearest 0.01 mt. (b) Area shall
be worked out to the nearest 0.01 sq. mt. (c,d,e) Cubical connection shall be worked out to the
nearest 0.01 Cu.m.
The rate shall include cost of all labour involved and tools used in demolishing and dismantling
including scaffolding. The rate shall also include the charges for separating out and stacking the
serviceable materials properly and disposing the unserviceable materials with all lead and lift. The
rate also includes for temporary storing for the safety of the portion not required to be pulled down or
of adjoining property and providing temporary enclosures or partitions where considered necessary.
The rate shall be for a unit of one cubic metre.
For Dismantling of Tiled Floor:
The relevant specifications shall be followed except the dismantling of tiled or stone floors laid on
mortars shall be done Dismantling implies carefully taking up or down or these are fixed by nail
screws bolts etc. the shall be taken out with proper tools.
Mode of measurement & Payment :
The supporting materials such as joints beams if any etc. shall be measured separately. The rate shall
includestacking the unserviceable materials as directed will lead and lift.
The rate shall be for a unit of (a) RMT (b) one sq. Meter (C) CMT(d)Cu.m(e)Cu.m
Extra Rate Over Item of Excavation of Earth for excavation of asphalt pavement / RCC of thickness up to
meter including demolishing the asphalt carpet, metal,s oiling/cutting Reinforcement etc.comp. with stacking
the material as directed. (Based on Previously approved rate by C E sir )
(a) up to 0.20 meter thickness (By Manual)
(b) 0.20 to 0.30 meter (By any type of Breaker Machine or R.C.C.Cutter machine including cost of operator,
fuel, & transportation etc complete.
(c) 0.30 meter & above (By any type of Breaker Machine or R.C.C.Cutter machine including cost of operator,
fuel, & transportation etc complete.
Extra rate for excavation of asphalt payment of any thickness including demolishing the asphalt carpet, metal,
soiling etc. complete with stacking the materials as directed. The road surface of asphalt shall carefully be
opened to full width as directed by the Engineer in charge so as to remove all cracks or other damaged portions
of road either manually or with the soiling shall be first be stripped off for the whole width of trenches. All the
Fmaterials shall be separately deposited in such places as may be determined by the Engineer-in-charge. In case
rubble not being so deposited or being mixed up with the excavated materials will not be allowed for refilling.
The cost of materials shall be charged from the contractor. The decision of the C.E. shall be final and binding to
the contractor.
Mode of measurement
Measurement shall be paid by Smt basis.
Dismantling of existing structural steel work for railing, grill, gate, grating, jali, etc including
foundation, sorting the dismantled material, disposal unserviceable material with all lifts and upto
any lead at non objectional place and stacking the serviceable material (structural elements) upto
AMC store including loading, unloading as directed by Engineer-in-charge.
1.Relevant Specifications of MORT&H fifth revision Section – 202 shall apply to this item. 2. The rate
includes tools, plants and scaffolding wherever necessary, for dismantling, removing any type of
structural steel work in any elements for all height etc including removing, dismembering, sorting the
dismantled material, disposal of unserviceable material and stacking the serviceable material with all
lifts/ depth and leads as directed by engineer in charge.
The measurement shall be in Kg.
Removal of existing any type of paving or paving stones of any type, any size, any thickness in required
depth including removing paver with spil sub base and breaking sub base i.e concrete or metaling etc
under the supervision of concerned department, disposal unserviceable material with all lifts and up to
any lead at non objectional place and stacking the serviceable material (paver) upto AMC store
includingloading, unloading as directed by Engineer-in-charge.
1. Relevant Specifications of MORT&H fifth revision Section – 202.3 shall apply to this item.
2. The rate includes tools, plants and equipments wherever necessary for removing/ dismantling of
any type of paving including removing paver/ stone or other surface including all sub layer upto
required depth including sorting the dismantled material, disposal of unserviceable material and
stacking the serviceable material with all lifts/ depth and leads as directed by engineer in charge.
The measurement shall be in Sqmt for any type of road surface upto required depth.
Removal of existing kerb stones of any type, any size, any thickness in required depth including
removing kerb with base PCC including excavation etc under the supervision of concerned
department, disposal unserviceable material with all lifts and up to any lead at non objectional
place and stacking the serviceable material (paver) upto AMC store including loading, unloading as
directed by Engineer-in- charge.
1. Relevant Specifications of MORT&H fifth revision Section – 202.3 shall apply to this item.
2. The rate includes tools, plants and equipments wherever necessary for removing/ dismantling of
any type (i.e. height, thickness, grade etc) of kerb in central verge, median stone, foot path kerb, road
divider stone etc including removing kerb stone including all sub layer upto required depth including
sorting the dismantled material, disposal of unserviceable material and stacking theserviceable
material with all lifts/ depth and leads as directed by engineer in charge.
The measurement shall be in Rmt for any type of road surface upto required depth.
Item No. 6 Removal Bus Shelter
Removal of existing Bus Shelter with all structure elements with seating arrangement, roof, supports,
advertise elements etc including excavation, Breaking concrete foundation under the supervision of
concerned department, disposal unserviceable material with all lifts and up to any lead at non objectional
place and stacking the serviceable material upto AMC store including loading, unloading as directed by
Engineer-in-charge.
1. The relevant specifications for removal of Bus Shelter with all structure elements with seating
arrangement, roof, supports, advertise elements etc as per mentioned in item.
2. The rate includes excavation and dismantling of foundation concrete and lines under the
supervision of concerned department, stacking of all serviceable material to AMC store and
disposal of debris as per relevant item and paid.
The measurement shall be in Nos. basis of Bus Shelter.
(A) Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged
brick work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I.
steps and removing manhole cover and debris from MH and carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
(C) up to 0.65 mt. (@ Seven Coarse)
(D) up to 0.90 mt. (@ Ten Coarse )
Relevant specification shall be followed as per item description : Repairing damaged M.H. and rasing
M.H. up to road level incl. removing damaged brick work and repairing by brick masonry in C.M. 1:5
C.M. 1:3 and fixing C.I. steps and existing MH sheet cover, removing the debris from MH and carting
thesame as directed.
The measurement shall be in Nos. basis Manhole.
Item No. 8 Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick masonry in
C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and removing existing chamber sheet cover, removing the
debris from chamber and carting the same as directed.
Relevant specification shall be followed as per item description : Repairing damaged I.C./ Raising removing
damaged brick work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps
and existing chamber sheet cover, removing the debris from chamber and carting the same as directed.
The measurement shall be in Nos. basis of I.C.
Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock,
flyash, aggregates of any kind Including spreading & levelling etc. complete.
• (a)Lead Upto 1 Km.
• (b)Lead From 1 Km to 2 Km.
• (c)Lead From 2 Km to 3 Km
• (d)Lead From 3 Km to 4 Km
• (e)Lead From 4 Km to 5 Km
• (f)Lead From 5 Km to 10 Km
• (g)Lead From 10 Km to 15 Km
Disposal of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly
ash,aggregates of any kind is subject to the following :
Unsuitable materials obtained from clearing site and excavation shall be disposed off within a lead of
200 meters or as per instruction given by Engineer in charge. Useful materials obtained from clearing
site and excavation shall be stacked and used within the work site. Internal conveyance above 200 mt
within the work site i.e. From starting chainage to End chainage of a given road WILL NOT BE PAYABLE.
Materials suitable for construction of Embankment, earthen shoulder and subgrade shall be stacked at
convenient places within a work site for reuse. No extra payment will be paid to the contractor for
stacking of earth within the work site and reused for the construction of Embankment layer, sub grade
and earthen shoulder purpose. Only surplus earth shall be disposed off outside the work site as per
instruction given by Engineer-In-charge. Useful stones from rock excavation shall be stacked nearly
within a lead of 50 M. and will be allowed to be used by the contractor on payment at rates laid down
in the contract or if not so aid down, at schedule of rates of the Division or at a mutually agreed rates if
there are no such rates in the Schedule of rates.
If surplus materials are required to be conveyed outside the work site i.e. Outside conveyance from a
particular stretch of given road will be paid in this item as per instruction of Engineer in charge. No
bulkage of disposed earth will be considered for the payment.
The rate shall be for a unit of one cubic meter.
Barricading the entire break down or excavated area on rental basis sing wooden ballies / M.S.
angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board outside to avoid
accident & for smooth traffic diversion & movement including cautionary board etc. Item also
includes for making temporary sufficient Nos. of lighting arrangement throughout the work with
necessary required arrangement. The same shall be removed after completion of work. OR as per
the instructions of Engineer in charge.
1. The relevant specifications as given in items shall apply to this item.
2. The measurement shall be in Rmt. area of barricading for barricading sheet with proper
numbering, structural steel, with necessary excavation, concrete base etc including painting. Retro
reflective work and blinkers shall be paid in relevant item.
3. The rate includes labour, material, equipment, shifting of barricading as per requirement of
progress of work and removal the same after completion of work. (All material will be the
property of the contractor after completion of the project).
Carting and Fixing M.H., Chamber or Catchpit Seat and Cover in line and level to match existing road
in C.C. 1:2:4 and finishing smooth, watering and protecting for 7 days etc. complete as directed.
M.H. seatcover will be supplied by A.M.C. (from any store) .
The rate shall be for a unit of
Providing and placing in position 100 mm thick factory made fair finish Precast RCC
Rectangularframe & perforated/ slotted Covers on drains Alcock, Vyara, of footpath of various
sizes, of M-25 grade cement concrete for RCC work, including cost of moulding, reinforcement,
rendering, etc i.c. cost of cartage, all leads & lift, handling at site etc. all complete as per direction
of Engineerin-Charge.-in-Charge.
Water, Cement, Grit, Sand, Graded stone aggregate 20-mm. nominal size as per general specification of
other concreting.
Contractor shall have to manufacture the blocks as per the dimensions given in the drawing.
Specific machineries shall be used to manufacture the precast blocks. These machineries should be
compatible to produce blocks of required strength and dimensions. Moulds/ Dies of the machine shall be
dimensionally checked & to be got approved before commencing theproduction.
Contractor shall prepare proper Drying Yard for keeping the blocks before curing. The drying yard shall be
levelled and covered so that no shrinkage cracks are formed.
Contractor shall prepare adequate size curing pond to cure the blocks for not less than 21 Days. No
other means of curing shall be allowed.
The technical specification of concrete shall confirm to IS 456-20.118.
The concrete mix shall be M25. Concrete work shall have exposed concrete surface or as specified in the
The ingredients required for ordinary concrete containing one bag of cement of 50 Kg. By weight
(0.0342 m3.) for different proportions of mix shall be as per IS 456-20.78. The proportion of the
aggregate for the precast block shall be modified as per the approval of the engineer-in-charge.
The water cement ratios shall not be more than those specified as per IS. The cement of the mix shall be
increased, if the quantity of water in a mix has to be increased to overcome the difficulties of placement and
compaction so that the water cement ratio specified in the table is not exceeded.
The maximum size of coarse aggregate shall be as large as possible within the limits specified but in no case
greater than 1/4th of the minimum thickness of the member, provided that the concrete can be placed
without difficulty so as to surround all reinforcement thoroughly and to fill the corners of the form.
For reinforced concrete work, coarse aggregates having a nominal size of 20 mm are generally considered
Admixture shall be used in concrete only with approval of the Architect and Engineer-in-charge based upon
the evidence that with the passage of time, neither the compressive strength of concrete is reduced nor
are other requisite qualities of concrete impaired by the use of such admixtures.
For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be kept
in first class working condition and maintained throughout the construction.Measured quantity of
aggregate, sand and cement required for each batch shall be poured into the drum of the mechanical mixer
while it is continuously running. After about half a minute ofdry-mixing, measured quantity of water
required for each batch of concrete mix shall be added gradually and mixing continued for another one
minute. Mixing shall be continued till materials are uniformly distributed and uniform colour of the entire
mass is obtained and each
individual particle of the coarse aggregate shows complete coating of mortar containing its proportionate
amount of cement. In no case shall the mixing be done for less than 2 minutesafter all ingredients have been
put into the mixer.
Mixers, which have been out of use for more than 30 minutes, shall be thoroughly cleaned before putting in
a new batch. Unless otherwise agreed to by the Architect and Engineer-in-charge, the first batch of concrete
from the mixture shall contain only 2/3rds of normal quantity of coarse aggregate. Mixing plant shall be
thoroughly cleaned before changing from one type of cement to another.
The degree of consistency which shall depend upon the nature of the work and methods of vibration of
concrete shall be determined by regular slump tests in accordance with IS: 120.9-20.59. The slump of
mm.to 25 mm. shall be adopted when vibrators are used.
All Moulds shall be cleaned and made free from standing water, dust, snow or ice immediately before
placing of concrete.
Formwork/Metal Mould for exposed concrete surface (If indicated):
All the moulds shall be checked for exact dimensions of the Precast blocks. All the edges of the Precast
blocks shall confirm the profile of the final drawing & edges/ curvatures of the moulds shall be checked
accordingly. Moulds shall be regularly checked for correctness of dimensions of Blocks, twists, bends due to
handling, etc. before starting every days work.
Care shall be taken to set all formwork/Mould in perfect line, level and plumb. Formwork/ Mould propping
shall be strong, rigid and sturdy. The formwork/ Mould shall be as per pattern & design shown in drawings.
Formwork/Mould shall be done accurately and precisely so as to achieve neat, clean and smooth concrete
surface, in line, level and plumb. Clinks, twists, offsets, warps, riveting etc. in plates or forms shall not be
allowed. Before placing concrete, forms shall be thoroughly cleaned off of all rust, dust and loose materials.
Colorless oil or grease of approved quality shall be applied before placing steel. Also the formwork material
will be of wood/ plywood/ steel or any sort of such material, as approved by the Architect; so that all
concrete surfaces have uniform colour.
For all kind of exposed concrete work only one brand (to be approved by the Architect or Engineer-in-
charge) of cement shall be used.
Removal of Moulds
Specific time shall be identified for removal of moulds, such that the concrete of the precast blocks shall
gain strength to withstand the stresses generated due to self weight and handling to drying yards without
any deformation to shape/ dimensions/ edges.
Sufficient time shall be given to the block after it is removed from the mould so that it can gain strength and
dry in shade to prevent any cracks due to shrinkage. This shall be done in drying yards.
Curing of block shall be done only in curing pond and curing shall be done for minimum 14 days.
Drying period after removing from pond & before delivery to site
Water should be drained of from the block before it is actually sent to the site. Time should be provided for
proper draining of water, which may be present in the block kept for curing in the pond.
Precaution shall be taken while transporting of the blocks to site.
The blocks should be loaded and unloaded with due care so as to avoid generation of stresses leading to
breaking of block.
Care should be taken to prevent the block from breaking during transporting.
The method of transporting and placing the precast members shall be as approved by the Architect and
Engineer-in-charge.
The block shall be placed in position on already prepared concrete surface as per the drawing.
Sampling and testing of concrete
Samples from fresh concrete shall be taken as per IS : 120.9-20.59 and cubes shall be made, cured and tested
at 7 days or 28 days as per requirements in accordance with IS : 516-20.59. A random sampling
procedure shall be adopted to ensure that each concrete batch shall have a reasonable chance of
being tested i.e. the sampling should be spread over the entire period of concreting and cover all mixing
units. NOTE : At least 1 sample shall be taken from each shift. Ten test specimens shall be made from each
sample, 5 for testing at 7 days and the remaining 5 at 28 days. The samples of concrete shall be taken on
each day of the concreting as per above frequency. The number of specimens may be suitably increased
as deemed necessary by the Architect and Engineer-in charge when procedure of tests given above
reveals a poorquality of concrete and in other special cases.
The average strength of the group of cubes cast for each day shall not be less than the specified cube
strength of 250 Kg/cm2. at 28 days. 20% of the cubes cast for each day may have value less than the
specified strength provided the lowest value is not less than 85% of the specified strength. If the concrete
made in accordance with the proportions given for a particular grade, does not yield the specified strength,
such concrete shall be classified as belonging to the appropriate lower grade. Concrete made in accordance
with the proportions given for a particular grade shall not, however, be placed in a higher grade on the
ground that the test strength are higher than the minimum specified.
If rock pockets/honeycombs in the opinion of Architect and Engineer-in-charge are of such an extent or
character so as to effect the strength of the structure, materially or to endanger the life of the steel
reinforcement, he may declare the concrete defective and require the removal and replacement of the
portion of the structure affected.
Mode of Measurements and Payment:
The rate shall include cost of casting, mould, curing, and the cost of reinforcement.
The Measurement of the item shall be in Sq.mt basis.
Box cutting the road surface to proper slope and camber for making a base for road work including
removing the excavated stuff and depositing on the road side slope as directed upto 200Mt.lead.
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any such
ordinary excavating implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall under this
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone, materials
and rubbish of all kind, bush, wood and trees shall be removed as directed. The materials so obtained
shall be property of the Government and be conveyed and stacked as directed. within 200 M. lead. The
roots of the trees coming in the sides shall be cut and coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra will be
After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor shall
assume full responsibility for alignment, elevation and dimension of each and all parts of the work.
Contractor shall supply laborers, materials, etc. required for setting out the reference marks and bench
marks and shall maintain them as long as required and directed.
The excavation in foundation shall be carried out in true line and level and shall have the width and
depth as shown in the drawings or as directed. The contractor shall do the necessary shoring and
shutting or providing necessary slopes to a safe angle, at his own-cost. The payment for such
precautionary measures shall be paid separately if not specified. The bottom of the excavated area shall
be 1 evened both longitudinally and transversely. as directed by removing and watering as required. No
earth filling will be allowed for bringing it to level, if mistake or any other reason excavation is made.
deeper or wider that shown on the plan or directed. The extra depth or width shall be made up with
concrete of same proportion as specified for the foundation concrete at the cost of the contractor. The
excavation up to 1.5 m. depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling the
ground in layer including ramming and watering etc. The balance of the excavated quantity shall be
removed by the contractor from the site of work to a place as directed with lead upto 200 M. and all lift.
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be made according to the sections of
trenches shown on the drawing or as per sections given by the Engineer-in-charge. No payment shall be
for surplus excavation made in excess of above requirements or due to slopping and sloping back as
found necessary on account of conditions of soil , and requirements of safety.
The rate shall be for a unit of one cubic meter.
Filling available excavated earth (excludingrock) intrenches. plinth,sides of foundations etc. Inlayers
exceeding 20cm. Indepth consolidating each disposited layer by ramming and watering.
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge and/or
his authorized representative. refer R & B Department booklet for General Technical Specification for
building works.
The mode of payment for this item shall be on CMT. Basis.
Filling in foundation and plinth with murrum or selected soil in layers of 20cm.thickness including
watering,ramming and consolidating etc. complete.
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge and/or
his authorized representative. refer R & B Department booklet for General Technical Specification for
building works.
The mode of payment for this item shall be on CMT. Basis.
Providing and laying cement concrete 1:5:10 (1- Cement : 5- fine sand : 10- graded brick bat
aggregates40mm nominal size) and curing complete.
Before starting the concrete the bed of the foundations trenches shall be cleared of all loose materials
and watered and rammed as directed. The proportion of cement, sand and hand broken stone
aggregates shall be one part of cement, 5 parts of coarse sand, 10 parts of hand broken stone
aggregates and shall so measured by volume. The concrete shall be mixed in a mechanical mixer at the
site of work. Hand mixing may however be allowed for smaller quantity of work if approved by the
Engineer-incharge. When hand mixing is permitted by the Engineer-in charge in case of breakdown of
machinery’s and in the interest of the work. it shall be carried out on a water tight platform and care
shall be taken to ensure that mixing is continued until the mass is uniform in colour and consistency.
The quantity of water shall be sufficient to produce a dense concrete of required workability for the
purpose. The concrete shall be handled from the place of mixing to the final position in not more than
15 minutes by the method as directed and shall be placed into its final position, compacted and finished
within 30 minutes of mixing with water i.e. before the setting commences. The concrete shall be laid in
layers of 15 cms. to 20 cms. The concrete shall be rammed with heavy iron rammers and rapidly to get
the required compaction and to allow all the gaps to be filled with mortar. After the final set, the
concrete shall be kept continuously wet, if required by pounding for a period of not less than 7 days
from the date of placement The concrete shall be measured for its length breadth and depth, limiting
dimensions to those specified on plan or as directed.
Mode of measurements shall be on CMT basis
Providing and laying cement concrete 1:3:6 (1- Cement : 3- Coarse sand : 6- Hand broken stone
40mm nominal size) and curing complete
Before starting the concrete the bed of the foundations trenches shall be cleared of all loose materials
and watered and rammed as directed. The proportion of cement, sand and hand broken stone
aggregates shall be one part of cement, 3 parts of coarse sand, 6 parts of hand broken stone aggregates
and shall so measured by volume. The concrete shall be mixed in a mechanical mixer at the site of work.
Hand mixing may however be allowed for smaller quantity of work if approved by the Engineer-
incharge. When hand mixing is permitted by the Engineer-in charge in case of breakdown of
machinery’s and in the interest of the work. it shall be carried out on a water tight platform and care
shall be taken to ensure that mixing is continued until the mass is uniform in colour and consistency.
The quantity of water shall be sufficient to produce a dense concrete of required workability for the
purpose. The concrete shall be handled from the place of mixing to the final position in not more than
15 minutes by the method as directed and shall be placed into its final position, compacted and finished
within 30 minutes of mixing with water i.e. before the setting commences. The concrete shall be laid in
layers of 15 cms. to 20 cms. The concrete shall be rammed with heavy iron rammers and rapidly to get
the required compaction and to allow all the gaps to be filled with mortar. After the final set, the
concrete shall be kept continuously wet, if required by pounding for a period of not less than 7 days
from the date of placement The concrete shall be measured for its length breadth and depth, limiting
dimensions to those specified on plan or as directed.
Mode of measurements shall be on CMT basis
Supplying and Spreading good quality coarse sand free from Impurities including Transportation to Site
labour cost for Spreading etc. Comp. as directed.
As directed by engineer incharge & as per prevailing latest IS & IRC Code.
The mode of payment for this item shall be on Cmt. basis.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
specification including premixing the Material with water at OMC in mechanical mix plant carriage
of mixed Material by tipper to site, laying in uniform layers in sub- base / base course on well
prepared surface and compacting with vibratory roller to achieve the desired density etc complete.
Production & Supply of WMM to site of
worksLaying of WMM
This work shall consist of laying and compacting clean, crushed, graded aggregate and granular
material, premixed with water, to a dense mass on a prepared sub-grade/sub- base/ base or existing
pavement as the case may be in accordance with the requirements of these Specifications. The
material shall be laid in one or more layers as necessary to lines, grades and cross-sections shown on
the approved drawings or as directed by the Engineer.
The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm. When
vibrating or other approved types of compacting equipment are used, the compacted depth of a single
layer of the sub-base course may be upto 200 mm with the approval of the Engineer.
Physical Requirements
Coarse aggregates shall be crushed stone. The aggregates shall conform to the physical requirements
set forth in Table 19-1. Sevaliya/Timba/Ankodiya special aggregate is only acceptable.
If the water absorption value of the coarse aggregate is greater than 2 percent, the soundness test
shall be carried out on the material delivered to site as per IS:2386 (Part-5).
Table 19-1 : Physical Requirements of Coarse Aggregates for Wet Mix Macadam for Sub-base/Base
S. No. Test Test Method Requirements
1. Los Angeles Abrasion value or IS:2386 (Part-4) 40 percent (Max.)
Aggregate Impact value
IS:2386 (Part-4) or 30 percent (Max.)
2. Combined Flakiness and Elongation IS:2386(Part-1) 35 percent (Max.)*
indices (Total)
* To determine this combined proportion, the flaky stone from a representative sample should
first be separated out. Flakiness index is weight of flaky stone metal divided by weight of stone
sample. Only the elongated particles be separated out from the remaining (non-flaky) stone metal.
Elongation index is weight of elongated particles divided by total non-flaky particles. The values of
flakiness index and elongation index so found are added up
Grading Requirements
The aggregates shall conform to the grading given in Table 19-2.
Table 19-2 : Grading Requirements of Aggregates for Wet Mix Macadam
IS Sieve Designation Percent by weight passing the IS Sieve
600 micron 8-22
Material finer than 425 micron shall have Plasticity Index (PI) not exceeding
The final gradation approved within these limits shall be graded from coarse to fine and shall not vary
from the low limit on one sieve to the high limit on the adjacent sieve or vice versa.
Construction Operations:-Preparation of Base
The surface of the sub-grade/sub-base/base to receive the Wet mix macadam course shall be
prepared to the specified grade and camber and cleaned of dust, dirt and other extraneous material.
Any ruts or soft yielding places shall be corrected in an approved manner and rolled until firm surface
Where the Wet mix macadam is to be laid on an existing metalled road, damaged area including
depressions and potholes shall be repaired and made good with the suitable material. The existing
surface shall be scarified and re-shaped to the required grade and camber before spreading the
coarse aggregate for Wetmix macadam.
Preparation of Mix
Wet Mix Macadam should be prepared in an approved mixing plant of suitable capacity having
provision for controlled addition of water and forced/positive mixing arrangement like pugmill or pan
type mixer of concrete batching plant. For small quantity of wet mix work, the Engineer may permit
the mixing to be done in concrete mixers.
Quantity of water should not vary from OMC determined as per IS : 2720 (part VIII) by more than
agreed limit. The mixed material should be uniformly wet and no segregation should be permitted.
Spreading of mix
Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the prepared sub
grade/sub-base/base in required quantities. In no case should these be dumped in heaps directly on
the area where these are to be laid nor shall their hauling over a partly completed stretch be
The mix may be spread either by a paver finisher or motor grader or as per instruction of Engineer-in-
Charge and/or his authorized representative. For portions where mechanical means cannot be used,
manual means as approved by the Engineer shall be used. The motor grader shall be capable of
spreading the material uniformly all over the surface. Its blade shall have hydraulic control suitable for
initial adjustments and maintaining the same so as to achieve the specified slope and grade.
The paver finisher shall be self-propelled, having the following features:
(i) Loading hoppers and suitable distribution mechanism
(ii) The screed shall have tamping and vibrating arrangement for initial compaction to the layer
as it isspread without rutting or otherwise marring the surface profile.
(iii) The paver shall be equipped with necessary control mechanism so as to ensure that the finished
surfaceis free from surface blemishes.
The surface of the aggregate shall be carefully checked with templates and all high or low sports
remedied by removing or adding aggregate as may be required. The layer may be tested by depth
blocks during construction. No segregation of layer and fine particles should be allowed. The
aggregates as spread should be of uniform gradation with no pockets of fine materials.
After the mix has been laid to the required thickness, grade and crossfall/camber the same shall be
uniformly compacted, to the full depth with suitable roller. If the thickness of single compacted layer
does not exceed 100 mm, smooth wheel roller of 80 to 100 kN weight may be used. For a compacted
single layer upto 200 mm, the compaction shall be done with the help of vibratory roller of minimum
static weight of 80 to 100 kN or equivalent capacity roller. The speed of the roller shall not exceed
In portions having unidirectional cross fall/superelevation, rolling shall commence from the lower
edge and progress gradually towards the upper edge. Thereafter, roller should progress parallel to the
centre line of the road, uniformly over-lapping each preceding track by at least one third width until
the entire surface has been rolled. Alternate trips of the roller shall be terminated in stops at least 1 m
away from any preceding stop.
In portions in camber, rolling should begin at the edge with the roller running forward and backward
until the edges have been firmly compacted. The roller shall then progress gradually towards the
centre parallel to the centre line of the road uniformly overlapping each of the preceding track by at
least one-third width untilthe entire surface has been rolled.
Any displacement occurring as a result of reversing of the direction of a roller or from any other
cause shallbe corrected at once as specified and/or removed and made good.
Along forms, kerbs, walls or other places not accessible to the roller, the mixture shall be thoroughly
compacted with mechanical tampers or a plate compactor. Skin patching of an area without scarifying
the surface to permit proper bonding of the added material shall not be permitted.
Rolling should not be done when the sub grade is soft or yielding or when it causes a wave-like motion
in the sub-base/base course or sub grade. If irregularities develop during rolling which exceed 12 mm
when tested with a 3 metre straight edge, the surface should be loosened and premixed material
added or removed as required before rolling again so as to achieve a uniform surface conforming to
the desired grade and cross fall. In no case should the use of unmixed material be permitted to
make up the depressions. Rolling shall be continued till the density achieved is at least 98 per cent of
the maximum dry density for the material as determined by the method outlined in IS : 2720 (Part-8).
After completion, the surface of any finished layer shall be well-closed, free from movement under
compaction equipment or any compaction planes, ridges, cracks and loose material. All loose,
segregated or otherwise defective areas shall be made good to the full thickness of the layer and
Setting and drying:
After final compaction of wet mix macadam course, the road shall be allowed to dry for 24 hours.
Opening to Traffic
Preferably no vehicular traffic of any kind should be allowed on the finished wet mix macadam
surface till ithas dried and the wearing course laid.
Surface Finish and Quality Control of
WorkSurface evenness:
The surface finish of construction shall conform to the requirements of Clause in Item No. 16&17&18.
Quality control:
Control on the quality of materials and works shall be exercised by the Engineer as per Table 19-3.
Table 19-3 : Test and Frequency for Materials for Wet Mix Macadam
Type of Test Frequency IS Code
Construction (As per Circular No. 66)
Wet Mix Gradation One test per 200 Cu.m. IS:2386, Part-I-1963
Macadam Aggregate Impact Value One test per 1000 Cu.m. IS:2386, Part-IV
Combined Flakiness and One test per 500 Cu.m. IS:2386, Part-I
Elongation Indices
Atterberg Limits of One test per 200 Cu.m. IS:2720, Part-V
portion of aggregates
Density of compacted One set of three tests per IS:2720, Part-VIII
layer 1000 sq.m
Rectification of Surface Irregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible tolerances or
where the course is otherwise defective due to subgrade soil getting mixed with the aggregates, the
full thickness of the layer shall be scarified over the affected area, reshaped with added premixed
material or removed and replaced with fresh premixed material as applicable and recompacted. The
area treated in the aforesaid manner shall not be less than 5 m long and 2 m wide. In no case shall
depressions be filled up with unmixed and ungraded material or fines.
Arrangement for Traffic
During the period of construction, arrangements for the traffic shall be provided. The Contractor
shall take all necessary measures for the safety of traffic during construction and provide, erect and
maintain such barricades, including signs, marking, flags, lights and flagmen as per instruction of the
Engineer-in-charge.
Measurements for Payment
The rate shall be for a unit of one cubic meter.
Providing TMT Bar FE500D reinforcement for R.C.C. Work including bending,binding and placing in
position complete upto floor two level.
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge and/or
his authorized representative.
Mode of measurements shall be on Kg basis.
Providing and Casting in situ ordinary cement concrete M200 for R.C.C. Raft and cutt off walls
including necessary shuttering laying, vibrating, ramming and curing complete.(B) Walls, fom top of
foundation level upto floor two level (upto 10 ton).
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge and/or
his authorized representative.
Mode of measurements shall be on CMT basis.
Providing & Applying Tri mix with Machine floater machine on constructed RCC work including
Machine & Labour etc Comp as directed.
The workmanship and the finishing qualities along with the quality of the materials shall be as finalized
by Engineer-In-Charge.
The Measurement of the item shall be in Smt. basis.
Labour work for fixing any kind of paving with cement pointing in CM 1:2, including watering, ramming
comp. as dir. For pavement aI) Laying on Sand bedding as per requirement to fix the C.C.Block / Nibhada
Stone in Line & Level
Work shall be carried out as per item description including cost of all labour and materials etc.
complete as directed. General standard practice of laying of paver block is applicable.
The measurements shall be on Smt. basis.
Supplying and fixing of 380 mm H x 300 mm L x 200 mm B Kerb block for Central Verge in M-20
grade using 20 mm nominal size black trap aggregate of Sevaliya/Timba/Ankodiya or equivalent
quality for pre-cast blocks, reasonably exposed finish/ formwork, mould with well equipped with
vibratory system for kerb stones of approved design including curing, etc. complete, including the
cost of formwork etc. complete. The rate shall also include necessary cutting of asphalt, fixing the
Kerb stones in line and level on 5 cm thick sand bedding with necessary equipments and materials.
The rate shall also include the flush pointing in CM (1:3) for all joints of the kerb stones. Filling of zari
alone the sides of the kerb stone fixed with Bituminous concrete mixed in proper position as
directed by Engineer in change to form a portable mixture. In any case Gravel or such type of
materials shall not be allowed for production.
The specifiction of following materials shall be conforming with specification mentioned for
relaventmaterial / items in General technical specification for building work of R&B Department of
Water shall conform to M-1Cement to M-2 Sand to M-5 Grit to M-7. Graded stone aggregate
mm. nominal size to M-10.
Contractor shall have to manufacture the blocks as per the dimensions given in the drawing. Specific
machineries shall be used to manufacture the precast blocks. These machineries should be compatible
to produce blocks of required strength and dimensions. The machine shall contain hydraulic Press or
advanced equipment to generate required compaction & Grade and finish. Moulds/ Steel Plates/ Dies
of the machine shall be dimensionally checked & to be got approved before commencing the
production. Contractor shall prepare proper Drying Yard for keeping the blocks before curing. The
drying yard shall be levelled and covered so that no shrinkage cracks are formed. Contractor shall
prepare adequate size curing pond to cure the blocks for not less than 21 Days. No other means of
curing shall be allowed. The technical specification of concrete shall confirm to IS 456-2000. The
concrete mix is not required to be designed and only nominal mix as per IS: 456-2000 shall be
followed. The proportion of the concrete mix shall be 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded
stone aggregate 20 mm. nominal size) by volume. Concrete work shall have fairly exposed concrete
surface or as specified in the item. The designation ordinary M-10, M-15, M-20, M-25 specified as per
I.S. corresponds approximately to 1:3:6, 1:2:4, 1:1.5:3 and 1:1:2 nominal mix of ordinary concrete, by
volume respectively. The ingredients required for ordinary concrete containing one bag of cement of
50 Kg. by weight (0.0342 m3.) for different proportions of mix shall be as per IS 456-2000. The
proportion of the aggregate for the kerb stone shall be modified as per the approval of the engineer-
in- charge. The water cement ratios shall not be more than those specified as per IS. The cement of
the mix shall be increased, if the quantity of water in a mix has to be increased to overcome the
difficulties of placement and compaction so that the water cement ratio specified in the table is not
exceeded. The maximum size of coarse aggregate shall be as large as possible within the limits
specified but in no case greater than 1/4th of the minimum thickness of the member, provided that
the concrete can be placed without difficulty so as to surround all reinforcement thoroughly and to fill
the corners of the form. For reinforced concrete work, coarse aggregates having a nominal size of
mm. are generally considered satisfactory. Admixture shall be used in concrete only with approval of
the Engineer-in-charge based upon the evidence that with the passage of time, neither the
compressive strength of concrete is reduced nor are other requisite qualities of concrete impaired by
the use of such admixtures.
Proportioning shall be done by volume, except cement which shall be measured in terms of bags of
kg weight. The volume of one such bag can be taken as 0.0342 m3. Boxes of suitable sizes shall be
used for measuring sand and aggregate. The size of the boxes (internal) shall be 30cm. x 30 cm. and
cm. deep. While measuring the aggregate and sand, the box shall be filled without shaking ramming or
hammering. The proportioning of sand shall be on the basis of its dry volume and in case of damp
sand; allowances for bulk age shall be made.
For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be
kept in first class working condition and maintained throughout the construction. Measured quantity
of aggregate, sand, and cement required for each batch shall be poured into the drum of the
mechanical mixer while it is continuously running. After about half a minute of dry-mixing, measured
quantity of water required for each batch of concrete mix shall be added gradually and mixing
continued for another one and a half minute. Mixing shall be continued till materials are uniformly
distributed and uniform colour of the entire mass is obtained and each individual particle of the coarse
aggregate shows complete coating of mortar containing its proportionate amount of cement. In no
case shall the mixing be done for less than 2 minutes after all ingredients have been put into the
mixer. Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned
before putting in a new batch. Unless otherwise agreed to by the Engineer-in-charge, the first batch of
concrete from the mixture shall contain only 2/3rds of normal quantity of coarse aggregate. Mixing
plant shall be thoroughly cleaned before changing from one type of cement to another.
The degree of consistency which shall depend upon the nature of the work and methods of vibration
of concrete shall be determined by regular slump tests in accordance with IS: 1199-1959. The slump of
10 mm. to 25 mm. shall be adopted when vibrators are used.
All Moulds shall be cleaned and made free from standing water, dust, snow, or ice immediately before
placing of concrete.
Formwork/Metal Mould for exposed concrete surface (If indicated):
All the moulds shall be checked for exact dimensions of the precast blocks. All the edges of the
precast blocks shall confirm the profile of the final drawing & edges/ curvatures of the moulds shall be
checked accordingly. Moulds shall be regularly checked for correctness of dimensions of Blocks, twists,
bends due to handling, etc. Before starting every days work.
Care shall be taken to set all form work/Mould in perfect line, level (or in required camber or slope as
specified) and plumb. Form work/Mould propping shall be strong, rigid, and sturdy. The form
work/Mould shall be as per pattern & design shown in drawings. Form work/Mould shall be done
accurately and precisely so as to achieve neat, clean and smooth concrete surface, in line, level and
plumb. Clinks, twists, offsets, warps, riveting etc. in plates or forms shall not be allowed. Before
placing concrete, forms shall be thoroughly cleaned off of all rust, dust, and loose materials.
Colourless oil or grease of approved quality shall be applied before placing steel. Also the form work
material will be of wood/plywood/steel or any sort of such material, as approved by the Engineer-in-
Charge and/or his authorized representative; so that all exposed concrete surfaces have uniform
For all kind of exposed concrete work only one brand (to be approved by the Engineer-in charge) of
cement shall be used.
Removal of Moulds:
Specific time shall be identified for removal of moulds, such that the concrete of the precast blocks
shall gain strength to withstand the stresses generated due to self weight and handling to drying yards
without any deformation to shape/ dimensions/ edges.
Sufficient time shall be given to the block after it is removed from the mould so that it can gain
strength and dry in shade to prevent any cracks due to shrinkage. This shall be done in drying yards.
Curing of block shall be done only in curing pond and curing shall be done for minimum 14 days.
Drying period after removing from pond & before delivery to site: Water should be drained of from
the block before it is actually sent to the site. Time should be provided for proper draining of water
which maybe present in the block kept for curing in the pond.
Precaution shall be taken while transporting of the blocks to site.
The blocks should be loaded and unloaded with due care so as to avoid generation of stresses leading
to breaking of block. Care should be taken to prevent the block from breaking during transporting.
The pits of the size 150mm in width and required depth shall first be excavated, true to line and level.
The relevant specifications of item A- 1 shall be followed for excavation work. The pits shall be filled
with a layer of 50mm. thick sand bedding. The curbs then shall be placed in position of which 50mm.
shall be below road. Care should be taken to maintain proper line and level. The joints between the
kerbs shall be pointed with
C.M. 1:2 and cured for minimum seven days.
Sampling and testing of concrete:
Samples from fresh concrete shall be taken as per IS : 1199-1959 and cubes shall be made, cured and
tested at 7 days or 28 days as per requirements in accordance with IS : 516-1959. A random sampling
procedure shall be adopted to ensure that each concrete batch shall have a reasonable chance of
being tested i.e. the sampling should be spread over the entire period of concreting and cover all
At least 1 sample shall be taken from each shift. Ten test specimens shall be made from each sample,
for testing at 7 days, and the remaining 5 at 28 days. The samples of concrete shall be taken on each
day of the concreting as per above frequency. The number of specimens may be suitably increased as
deemed necessary by the Engineer-in-charge when procedure of tests given above reveals a poor
quality of concrete and in other special cases. The average strength of the group of cubes cast for each
day shall not be less than the specified cube strength of 200 Kg/cm2 at 28 days. 20% of the cubes cast
for each day may have value less than the specified strength provided the lowest value is not less than
85% of the specified strength. If the concrete made in accordance with the proportions given for a
particular grade, does not yield the specified strength, such concrete shall be classified as belonging to
the appropriate lower grade. Concrete made in accordance with the proportions given for a particular
grade shall not, however, be placed in a higher grade on the ground that the test strength are higher
than the minimum specified. If rock pockets/honeycombs in the opinion of Engineer-in-charge are of
such an extent or character so as to affect the strength of the structure, materially or to endanger the
life of the steel reinforcement, he may declare the concrete defective and require the removal and
replacement of the portion of the structure affected.
Precast Kerb Stones:
The relevant specifications of concreting as per item above shall be followed except that work shall be
carried out for precast concrete kerb stones as specified in the item. All Precast members shall be cast
at workshop. Sufficient curing shall be done before placement of the same the method of transporting
and placing the precast members shall be as approved by the Engineer-in-charge. Members shall be so
transported that no breakage or undue stresses are induced in them. If required, all members shall
have a key provided on both the faces i.e top and bottom surfaces, of adequate size so as to fill the
same with concrete while laying. The function of this key is to avoid the leakage through the joint
between the precast member and the member on which it is laid.
Mode of Measurements and Payment :
The rate shall include cost of formwork and cost of reinforcement. The volume occupied by
reinforcement shall not be deducted from R.C.C. work.
The rate shall be for a unit of Rmt.
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb block for Footpath in M-20 grade
using 20 mm nominal size black trap aggregate of Sevaliya/Timba/Ankodiya or equivalent quality for
pre-cast blocks, reasonably exposed finish/ formwork , mould with well equipped with vibratory
system for kerb
stones of approved design including curing, etc. complete, including the cost of formwork etc. complete.
The rate shall also include necessary cutting of asphalt, fixing the Kerb stones in line and level on
cm thick sand bedding with necessary equipments and materials. The rate shall also include the flush
pointing in CM (1:3) for all joints of the kerbstones. Filling of zari alone the sides of the kerb stone fixed
with Bituminous concrete mixed in proper position as directed by Engineer in change to form a portable
mixture. In any case Gravel or such type of materials shall not be allowed for production.
Specification as per Item No. 40 only size of kerb as mentioned in Abstract.
Pre cast concrete kerb Providing and fixing M25 Grade of concrete precast exposed / Fair finish /
texture finish kerb stones of approved make as per approved sample of any size and any type. Kerbs
shall be fixed on the foundation prepared as per approved design. The rate shall also include for
erecting and fixing the pieces in position for complete kerb system with chamfered type of kerbs
including necessary accessories of kerb like radius kerb, angles and quadrant kerbs, droplet kerbs
etc. complete as per drawing. Kerb shall be fixed as paper joint without any jointing material.
However cement mortar shall be provided at the backside of kerb stone joint. (Sample must be
approved) Cost of excavation, cutting , base , side filling shall includes as directed engineer -
incharge in above item description as per BOQ (a) 450 mm high median kerb*600*150mm
Specification as per Item No.
Pre cast concrete kerb Providing and fixing M25 Grade of concrete precast exposed / Fair finish /
finish kerb stones of approved make as per approved sample of any size and any type. Kerbs shall be fixed
on the foundation prepared as per approved design. The rate shall also include for erecting and fixing the
pieces in position for complete kerb system with chamfered type of kerbs including necessary accessories
of kerb like radius kerbs, angles and quadrant kerbs, droplet kerbs etc. complete as per drawing. Kerb
shall be fixed as paper joint without any jointing material. However cement mortar shall be provided at
the backside of kerb stone joint. (Sample must be approved) Cost of excavation, cutting , base , side
filling shall includes as directed engineer - incharge in above item description as per BOQ (b) 380 mm high
Footpath kerb*600*150mm
Material: (1) Water shall conform to M-1. (2) Cement shall conform to M-3. (3) Sand shall conform to M-6.
(1) Stone aggregate shall conform to M-12 (5) Pre cast kerb shall be of approved make and as per
approvedsample.
1.0 Workmanship :
All Precast exposed/ fare finish/ texture finish kerb stones shall be of approved
make.Sufficient curing shall be done before placement of the same.
The method of transporting and placing the precast members shall be as approved by
theArchitect and Engineer-in-charge. Members shall be so transported that no
breakage orundue stresses are induced inthem.
The pits of the size 0.15 M in width and 0.23 M. in depth or as per site condition shall
first be excavated, true to line and level. The specifications for excavation shall be
followed as per relevant item.
The pits shall be filled with a layer of 0.15 M. thick lean concrete M15. The kerbs shall be
laid on existing PCC base in true line and plumb. The specifications for PCC work shall be
followed as per relevant item.
The rate shall also include for erecting and fixing the pieces in position for complete
Kerb systems with Chamfered type of kerbs including all type of necessary accessories of
kerb like Radius Kerbs, Angles and Quadrant Kerbs, inlet kerb etc complete as per
The rate shall also include the flush pointing in CM (1:2) for all joints of the kerb stones.
Mode of Measurement & Payment:
The rate shall include the cost of material and labour for fixing the kerb system including laying,
jointing and finishing but excluding the cost of excavation, bitumen cutting, base PCC, zari filling with
bitumen material
The Measurement of the item shall be in Rmt basis.
Providing & laying Mountable type Central Verge including casting of Kerb of size 15.00 x 32.50 Cm by
mechanical Kerb casting machinery and oil paint colour to Center verge (Kerb) by Yellow/white and Black
patta (Three Coat) one coat of priming & two coat of oil Paint including cost of material required for paint
and all labourworketc complete as per direction, detailed drawing and instruction of engineer
.(Including Epoxy Piant of Approved Quality) (Central Verge)
CEMENT CONCRETE KERB AND KERB WITH CHANNEL
This work shall consist of constructing cement concrete kerbs and kerbs with channel in the
central median and/or along the footpaths or separators in conformity with the lines,levels and
dimensions asspecified in the drawings.
Kerbs and kerb with channel shall be provided in cement concrete of Grade M20 in accordance
withSection 1700 of theseSpecifications.
Type ofConstruction
These shall be cast-in-situ construction with suitable kerb casting machine in all situations
except atlocations where continuous casting with equipment is not practicable. In those
situations, precast concrete blocks shall be used.
A continuous kerb casting equipment of adequate capacity and controls, capable of laying the
kerbs in required cross-sections and producing a well- compacted mass of concrete free of voids
and honeycombs, shall be used.
ConstructionOperations
Kerb shall be laid on firm foundation of minimum 150 mm thickness of cement concrete of M
grade cast in-situ or on extended width of pavement. The foundation shall have a projection of
mm beyond the kerb stone. Before laying the foundation of lean concrete, the base shall be
levelled and slightly watered to make it damp.
In the median portions in the straight reaches,the kerb shall be cast in continuous
lengths. In the portions where footpath is provided and/or the slope of the carriageway is
towards median (as in case of superelevated portions), there shall be sufficient gap/recess
left in the kerb to facilitate drainageopenings.
After laying the kerbs and just prior to hardening of the concrete, saw cut grooves shall
be provided at 5 m intervals or as specified by the Engineer.
Kerbs on the drainage ends such as along the footpath orthe median in superelevated
portions, shall be cast with monolithic concrete channels as indicated in drawings. The
slope of the channel towards drainage pipes shall be ensured for efficient drainage of the
Vertical and horizontal tolerances with respect to true line and level shall be ± 6mm.
Measurements forPayment
Cement concrete kerb/kerb with channel shall be measured in linear metre for
thecomplete item of work.
Foundation of kerb, where separately provided shall be measured in linear metre
forcomplete item ofwork.
The Contract unit rates for cement concrete kerb/kerb with enamel and foundation
for kerbshall be payment in full compensation for furnishing all materials, labour,
tools, equipment
for construction and otherincidentalcost necessary to complete thework.
Measurements for Payment:
The rate shall be for a unit of one Running meter.
Supplying and fixing for central verge 230 mm L x 235 mm Width x 680 mm H Supplying & Fixing in
M-20 grade using 20 mm nominal size black trap aggregate of sevaliya/timba or equivalent quality
for pre-cast blocks,reasonably exposed finish/formwork,mould with well equipped with vibratory
system for kerb stones of approved design including curing,etc.complete,including the cost of
formwork etc.complete.THe rate shall also include necessary cutting of asphalt,fixing the kerb
stones in line and level on 5 cm thick sand bedding with necessary equipments and materials.The
rate shall also include the flush pointing in CM(1:3)for all joints of the kerbstones.Filling of Zari alone
the sides of the kerb stone fixed with bituminous concrete mixed in proper position as directed by
engineer in charge to form a portable mixture.In any case gravel or such type of materials shall not
be allowed for production.
Work shall be carried out as per item description including cost of all labour and materials etc.
complete as directed. General standard practice of work is applicable.
The measurements shall be on Rmt basis.
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35 Grade of any size
;shape (Usually Uni-Paver Blocks) using black trap good quality aggragate of 20 mm nominal size for
footpath, parking areas, service lanes and other areas as mentioned in the drawing / instruction of
Engineer-in-Charge and/or his authorized representative. Cost includes formworks using rubber mould,
Rate providing and laying paver blocks as per required grading and specification. The paver block shall be
mechanically compacted. The work of paving blocks shall be executed in line and level by skill mason of
flooring work only. It should be laid in such a way that the no cutting of the paver block to be necessary. if
cutting of paver block necessary then it should be cut by machine only and carting. The finished surface of
the paver block shall have resonably good, plain finished. Paver blocks shall be compacted and shall be
relaid if necessary. Gravel or such type of materials shall not be allowed for production. Laying on 50 mm
thick sand bedding.
• Laying on 50 mm thick sand bedding.
Scope of work :
Excavation and compaction up to 300 mm in height for footpath paving in all sorts of soil murrum
including sorting outs and stacking of useful materials stuff up to 50mt.
The scope of work includes manufacturing, supplying, and lying of precast paver blocks at various
Retail outlets. The work includes: Verification of the existing site condition and advising our project in
charge to lay suitable base course if required. Contractors are required to satisfy themselves with
quality of sub grade, sub-base course before the paver blocks are laid and suggest strengthening if
Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks.
Manufacturing of paver blocks in your plant as per requirements in technical specification enclosed.
Supplying of paver blocks at site, including handling at both ends.
Laying of paver blocks at site as per requirement in technical specification on 50 mm thick sand
bedding, within shortest possible time the site is public place hence care should be taken to ensure
that the routine activities should not be disturbed. The job of laying may required to be carried out
during night also.
Testing of paver blocks shall through reputed Govt. /Non Govt. Test house only and submission of
test results as per requirements in Technical Specifications. AMC reserves the right to carryout test at
random. Cost for such tests to be borne by party. The contractor shall guarantee that all material and
components designed, fabricated, supplied, and laid by him shall be free from any type of defect due
to faulty material and/or workmanship/erection for a period of One year from the date of completion
of work. However, the contractor one year's shall render free maintenance.
TECHNICAL SPECIFICATIONS:
Paver Block Manufacturing Facilities:
The Paver Block shall be made in factory with following minimum facilities:
Concrete Block making Machines:
The machine should be capable of producing high quality Paver Blocks by obtaining high level
of compaction by application of hydraulic compaction and also by high intensity vibration to
the moulds. The machine should have automatic control panel
for uniformity in strength.
Concrete Batching & Mixing Plant: (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete
ingredient should be mixed in concrete Batching & Mixing plant with minimum capacity of
cum/hour. The plant should equipped with automatic control panel for maintaining water
cement ratio from batch to batch to obtain concrete of uniform quality and strength. The
plant should be equipped with adequate mechanism for mechanized loading of raw materials
into mixer and conveyor belt for transportation of concrete from mixer to concrete block
making machine to maintain quality of wet cement.
The factory should have well designed curing area to ensure adequate curing of paver blocks.
Laboratory (Desirable but not essential) :
The testing equipment should have required in the Laboratory as per the
following:A Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
Systematic record of test results of various paver blocks manufactured in the
factory.Concrete Mix Design for various grade of concrete used for making of
Specifications For Coloured Paver Blocks:
Coloured concrete paver blocks shall be manufactured as per attached specifications using or
equivalent approved colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS”
with minimum colour pigment of 3% by weight of cement. The colour shade shall be “RED” as
selected by AMC before commencement of the work. White cement shall be used for colored
pavers to obtain the desired colour shade. The job also includes providing 50 mm thick sand
bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of
months from the date of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured
pavers willbe as per attachment.
Pavers Block Characteristics:
The concrete pavers should have perpendicularities after release from the mould and the
same should be retained until the laying. The surface should be reasonably smooth and of
anti skid and anti glare type. The paver should have uniform chamfers to facilitate easy
drainage surface run off. The pavers should have uniform interlocking space of 2mm to 3mm
to ensure compacted sand filling after vibration on the paver Surface. The concrete mix design
should be followed for each batch of materials separately and automatic batching plant is to
be used to achieve uniformity in strength and quality. The pavers shall be manufactured in
single layer only. Skilled labour should be employed for laying blocks to ensure line and level
of laying, desired shape of the surface and adequate compaction of the sand in the joints. The
pavers shall be of cement gray colour without any pigment & for coloured pavers refer
“specifications for coloured pave`” The pavers are to be skirted all round with kerbing using
solid concrete blocks of size 150mm X 250mm X 380mm. The kerbing should be embedded for
100mm depth. The concrete used for kerbing shall be cured properly for 7 days minimum.
Paver Block Dimensions:
Thickness 60 mm
Shape Unipaver, I shape or directed by Addl.C.E.
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey colour without use of any pigment.
For coloured pavers refer “specifications for coloured
Dimensional Tolerance (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
Testing of Paver Blocks :
* TEST Average Values Frequency
1. Compressive Strength Min. 35 N/Sq mm for 250 Smt / 1 Test
2. Flexural Strength Minimum 4.5 N/Sq mm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
* Sampling and testing procedure as per enclosed specifications
Sampling and Testing Procedure for Paver Blocks
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Sampling for Testing Sampling of
Method of sampling :
Before laying paver blocks, each designated section comprising not more than 50000 blocks, shall
bedivided into ten approximately equal groups. Three blocks shall be drawn from each group.
Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the designated
section of part thereof, and the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid
damage to the paving in transit. Protect the paving from damage and contamination until they
have been tested. The testing shall be carried as soon as possible, after the sample has been
taken. As soon as practicable after sampling. The samples shall be stored in water at 20 degree
C 5 degree C for 24 hours prior to testing.
The item is to be executed as per instructions and to the entire satisfaction of Engineer-in-
Charge and/or his authorized representative using Rubber mould and Table vibrator for Kerb
instead of mechanical press system.
Extra rate for excavation of asphalt payment of any thickness including demolishing the
asphalt carpet, metal, soling etc. complete with stacking the materials as directed. The road
surface of asphalt shall carefully be opened to full width as directed by the Engineer-in-Charge
and/or his authorized representative.
Excavation area shall be properly identified and marked in rectangular shape. The road crust
shall be opened up to entire depth i.e. including soling. All the materials shall be separately
deposited in such a way and in places as may be determined by the Engineer-in-Charge and/or
his authorized representative. In case rubble not being so deposited or being mixed up with
the excavated materials will not be allowed for refilling. The cost of materials shall be charged
from the contractor. The decision of the C.E. shall be final and binding to the contract.
For detailed specification for Laying of Paver Block on sand bedding, refer R & B
Department bookletfor General Technical Specification for building works.
The rate shall be for a unit of SMT.
Providing and laying of interlocking grey paver blocks of high density 80mm thick made from M-40
grade concrete using 6 mm to 20 mm machine crushed well graded stone aggregate, sand of
approved quality, OPC 53 grade cement with contractor's own concrete mix design as approved by
AMC, for parking, road. Cost Includes formwork, using rubber/FRP mould, laying paver block as per
required grading and specification laid paver block shall be mechanically compacted. The work of
the paving blocks shall be executed in line and level by skilled mason of flooring work only. It should
be laid in such a way that the no cutting of the paver block to be necessary. Cutting of paver block by
machine cut only and carting to be done. The Finished surface of the Paver Block shall have
reasonably good plain finish. Paver blocks shall be compacted and shall be re-laid if necessary.
Gravel or such type of materials shall not be allowed for production. Laying on 5 Cms thick sand
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge and/or
hisauthorized representative.
The mode of payment for this item shall be on RMT.
Providing and laying shot blasted Non - interlocking, Paver blocks of specified thickness, size, grade of
concrete and colour machine made and blasting by automatic shot blasting machine and high density of
asper approved sample of approved make for footpath, parking areas, service lanes,cross over and other
areas as mentioned in the drawing. Including providing and laying 50 mm thick averave bedding layer of
coarse sand below paver block as per required grading and specification. Laid paver block shall be
mechanically compacted. The work of the paving blocks shall be executed in line and level by skilled
mason of flooring work only. Small size of paver block with same specification shall be used at
residue or at end. It should be laid in such a way that the no cutting of the paver block to be
necessary. If cutting of paver block shall be required , than cut by machine only and laying to be
done by skilled flooring mason. The finished surface of the paver block shall have coarse sand
Texture Finish. Pave blocks shall be compacted and shall be re-laid if necessary. Actual laid area shall
be measured and paid without any wastage. (A) 60 mm thick M-35 grade Grey Paver block of size
Providing and laying shot blasted Non - interlocking, Paver blocks of specified thickness, size, grade of
concrete and colour machine made and blasting by automatic shot blasting machine and high density of
asper approved sample of approved make for footpath, parking areas, service lanes,cross over and other
areas as mentioned in the drawing. Including providing and laying 50 mm thick averave bedding layer of
coarse sand below paver block as per required grading and specification. Laid paver block shall be
mechanically compacted. The work of the paving blocks shall be executed in line and level by skilled
mason of flooring work only. Small size of paver block with same specification shall be used at residue
orat end. It should be laid in such a way that the no cutting of the paver block to be necessary. If cutting
of paver block shall be required , than cut by machine only and laying to be done by skilled flooring
mason. The finished surface of the paver block shall have coarse sand Texture Finish. Pave blocks shall be
compacted and shall be re-laid if necessary. Actual laid area shall be measured and paid without any
wastage. (A) 80 mm thick M-35 grade Grey Paver block of size 200mm x 200mm.
The scope of work: It includes supplying and laying of Precast shot blasted by automatic shot blasting
machine in factory (not on site) paver blocks at footpath, parking area, service lane and other areas.
The work includes:
Paver block should be laid over prepared sub grade.
Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks.
Manufacturing of paver blocks by one of the approved suppliers as per requirements intechnical
specification enclosed.
Supplying of paver blocks at site, including handling at both ends. The type of paver block may be
interlocking or non-interlocking.
Providing and laying average 50 mm coarse sand bedding for laying blocks.
Laying of paver blocks at site as per requirement in technical specification, within shortest possible time.
Testing of paver blocks through reputed Govt. /Non Govt. Test house and submission of test results as per
requirements in Technical Specifications. Client reserves the right to carryout test at random. Cost for such
tests to be borne by contractor.
The contractor shall guarantee that all material and components designed, fabricated, supplied and laid by
him shall be free from any type of defect due to faulty material and/or workmanship/erection for a period of
five year from the date of completion of work at individual sites. However, the contractor for five years shall
render free maintenance.
Technical Specifications:
Paver Block Manufacturing Facilities:
The Paver Block shall be made in factory with following minimum facilities:
Concrete Block making Machines:
The machine should be capable of producing high quality Paver Blocks by obtaining high level of
compaction by application of hydraulic compaction and also by high intensity vibration to the moulds.
The machine should have automatic control panel for uniformity in strength.
Concrete Batching & Mixing Plant: (Not essential) The concrete Mix Design should be followed for
each batch of materials. The concrete ingredient should be mixed in concrete Batching & Mixing plant
with minimum capacity of 30 cum/hour. The plant should be equipped with automatic control panel
for maintaining water cement ratio from batch to batch to obtain concrete of uniform quality and
The plant should be equipped with adequate mechanism for mechanized loading of raw materials into
mixer and conveyor belt for transportation of concrete from mixer to concrete block making machine
to maintain quality of wet cement.
The factory should have well designed curing area to ensure adequate curing of paver blocks. Steam
curingfacility of the paver blocks is preferable.
Laboratory (Desirable but not essential) :
The factory should have the following:
Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
(1) Systematic record of test results of various paver blocks manufactured in the factory.
(2) Concrete Mix Design for various grade of concrete used for making of paver blocks.
Specifications for Coloured Paver Blocks:
Colour concrete paver blocks shall be manufactured as per attached specifications using approved
colour Pigment of iron oxide of approved brand like Bayer, Tata etc. with minimum colour pigment of
3% by weight of cement. The colour shade shall be as selected by Architect before commencement of
the work. The job also includes providing 50 mm thick sand bedding to match the shade of the paver
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months
from the date of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of Color pavers will be as
per attachment.
Paver Block Characteristics:
The concrete pavers should have perpendicularities after release from the mould and the same should
beretained until the laying.
The surface should be reasonably smooth and of anti skid and anti glare type. The paver should have
uniformchamfers to facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling
aftervibration on the paver Surface.
The concrete mix design should be followed for each batch of materials separately and automatic
batchingplant is to be used to achieve uniformity in strength and quality.
The pavers shall be manufactured in Double layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying, desired shape of
thesurface and adequate compaction of the sand in the joints.
Paver Block Dimensions:
Layers Double layered, top layer minimum 8 to 10 mm
Shape Irregular (Uniform Shape with no Hollow Or Cracks) / as per
drawingChamfer 4mm to 6mm along top edges
Colour Natural cement grey Colour without use of any
pigment.For Colour pavers refer “specifications for
Dimensional (+/-) 2mm for length &
width, Tolerance (+/-) 3mm for Height
Testing of Paver Blocks:
* Sampling and testing procedure as per enclosed specifications
Sampling & Testing Procedures for Paver Blocks:
INTERNAL – Average of minimum 3 samples per 10000 Blocks for compressive strength and
waterabsorption.
EXTERNAL – Minimum 2 Blocks per 10000 blocks for abrasion and flexure.
Sampling For Testing: Sampling for testing of paver blocks shall be done in accordance with Appendix-
Compressive Strength: Testing for compressive strength shall be undertaken in accordance with
Appendix-B.The average compressive strength of the blocks tested shall be 30/40 N/Sq.mm as per
Abrasion Resistance: Testing for abrasion shall be in accordance with IS 1237 (Specifications for
CementConcrete Floor Tiles).
Flexural Strength: Testing for flexural shall be in accordance with IS 1237 (Specifications for
CementConcrete Floor Tiles).
Water Absorption: Testing for water absorption shall be in accordance with IS 2185:1979:
Part I(Specifications for Concrete Masonry Units).
Method of sampling: Before laying paver blocks, each designated section comprising not more than
10000 blocks, shall be divided into five approximately equal groups. One block shall be drawn from
each group i.e. 3for internal testing and 2 for external testing.
Marking and identification: All samples shall be clearly marked at the time of sampling in such a way
that the designated sections of part thereof, and the consignment represented by the sample, are
clearly defined.The sample shall be dispatched to the approved test laboratory taking precaution to
avoid damage to the paving in transit. Protect the paving from damage and contamination until they
have been tested. The testing shall be carried as soon as possible, after the sample has been taken. As
soon as practicable after sampling. The samples shall be stored in water at 20 degree oC for 24 hours
prior to testing.
SR.NO. * TEST SPECIFICATION Average Values
(Average of Minimum Five Samples/Site)
1. Compressive Strength Min. 30 N/Sq.mm for 60mm thick and Min.
N/Sq.mmfor 80mm thick
2. Flexural Strength Minimum 3.80 N/Sq.mm and 4.5 N/ Sq. mm for 60 and
mm thick paver block respectively.
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
5. Minimum Cement Content 380 Kg/Cum for M 30 concrete and 430 Kg/Cum for M 40 concrete
Sampling & Testing Procedures for Paver Blocks:
INTERNAL – Average of minimum 3 samples per 10000 Blocks for compressive strength and
waterabsorption.
EXTERNAL – Minimum 2 Blocks per 10000 blocks for abrasion and flexure.
Sampling For Testing: Sampling for testing of paver blocks shall be done in accordance with
Appendix-A. Compressive Strength: Testing for compressive strength shall be undertaken in
accordance with Appendix-B. The average compressive strength of the blocks tested shall be 30/40
N/Sq.mm as per thickness.
Abrasion Resistance: Testing for abrasion shall be in accordance with IS 1237 (Specifications for
CementConcrete Floor Tiles).
Flexural Strength: Testing for flexural shall be in accordance with IS 1237 (Specifications for
CementConcrete Floor Tiles).
Water Absorption: Testing for water absorption shall be in accordance with IS 2185:1979:
Part I(Specifications for Concrete Masonry Units).
Method of sampling: Before laying paver blocks, each designated section comprising not more than
10000 blocks, shall be divided into five approximately equal groups. One block shall be drawn from
each group i.e. 3for internal testing and 2 for external testing.
Marking and identification: All samples shall be clearly marked at the time of sampling in such a way
that the designated sections of part thereof, and the consignment represented by the sample, are
clearly defined. The sample shall be dispatched to the approved test laboratory taking precaution to
avoid damage to the paving in transit. Protect the paving from damage and contamination until they
have been tested. The testing shall be carried as soon as possible, after the sample has been taken. As
soon as practicable after sampling. The samples shall be stored in water at 20 degree C 5 degree C for
24 hours prior to testing.
Test For Compressive Strength:
Testing Machine: The testing machine shall be of suitable capacity for the test and capable of applying
the load of the rate specified. It shall comply, as regards repeatability and accuracy, with the
requirements of clause 2.1 of BS: 1881-Part
Procedure: The sample specimen shall be tested in a wet condition after being stored for at least
hours in water maintained at a temperature of 20 oC + or – 5 oC. Before thespecimens are submerged
in water, the necessary area shall be determined.
The plates for testing machines shall be wiped clean and any loose grit or other material removed
from the contact faces of the specimen. Plywood, nominally 4 mm thick shall be used as packing
between the upper and lower faces of the specimen and the machine plates and these boards shall be
larger than the specimen by the margin of at least 5 mm
at all points. Fresh Packing shall be used for every specimen tested.
The specimen shall be placed in the machine with the wearing surface in the horizontal plane and in
such a way that the axes of the specimen are aligned with those of the machine plates.
The load shall be applied without shock and increased continuously at the rate of approximately
N/ Sq.mm per minute until no greater load can be sustained. The maximum load applied to the
specimen shall be recorded.
Calculation of corrected strength for individual Blocks: The compressive strength of each block
specimen shall be calculated by dividing the maximum load by full cross section area of the block and
multiplying with an appropriate factor of:-
a) For 100 mm thick blocks –
b) For 80 mm thick blocks –
c) For 60 mm thick blocks –
Compressive Strength Calculation: The average corrected compressive strength for the designed
blocksection shall be calculated.
4.0 Method of laying:
Blocks shall be placed on the sand bedding etc. which were well rammed so as to act as firm bed.
Blocks shall be laid in such manner that no gap shall be left in between. Blocks so laid shall be
compacted by means of mechanical compactor or equivalent compacting method so as to obtain
required finished surface. All the joints shall be matched and if any manufacturing defect is
detected the lot shall be replaced and relaying shall be done with out any extra cost up to satisfaction
of Engineer in charge.
50 to 80mm thick coarse sand shall be laid as cushioning layer for arranging the paver blocks. Joints of
the paver blocks shall be filled with the sand.
The paver blocks shall be laid properly on the prepared sub-base as per manufacturer's specification
and as per Architect and Engineer-in-charge's instruction.
Paver block shall be laid by the approved agency only. If manufacturer of the paver block providing the
laying services, then it shall be laid through the supplying agency only. The labourers for paver block
fixing shall be skilled flooring mason only. Only cutting tool shall be used for cutting the paver block.
Full depth cutting toll shall be used for proper finished surface after cutting. Manual cutting or
breaking of the paver block is not permitted.
After laying of the paver block fine sand shall be spread over it and paver block shall be compacted
with mechanical compactor. Any settlement or undulation in the laid area shall be repaired
5.0 Mode of Measurement and payment:
Measurement shall be done as per actual area laid without considering any wastage.
The Measurement of the item shall be in Sq. mt basis.
Labour work of fixing kurb any design of central verge, (both side) footpath kurb, items includes necessary
excavation, asphalt cutting of any thickness, erecting in line and position and pointing with cement
mortar (1:3), watering, etc complete, filling with zari along the side of the kurb, the kurb stone fix
prepared with bitumnious top surface, as directed by engineer in charge.
Work shall be carried out as per item description including cost of all labour and materials etc. complete
as directed. General standard practice of laying of paver block is applicable.The measurements shall be on
Labour work for fixing interlocking blocks / any kind of pavement on up to 50 mm thick sand
bedding,leveling, watering and fixing in line & level as well cleaning the site etc. comp. as directed
Specification as per Item No. 51 only work as mentioned in Abstract.
Item No.36 Bitumen Cutting.
Labour charge of cutting in bituminous pavement. Cutting to be done with heavy duty tandom
cutting machine consist of diamond blade. Minimum cutting depth shall be 75 mm from the finished
level. Cutting shall be perfeclty in line. The width and depth of the removal of asphalt towards kerb
stone shall be as per the drawing. Bitumen shall be carefully removed so that the the cutting edge
towards the road should not be disturbed. The work of removal of the asphalt will be considered in
this item as running meter of the cutting done by machine. One cutting line will be considered per
length of the kerb stone. Bitumen and other debris shall be disposed within 10.0 km. as per the
instruction of the engineer in charge. Surroundings shall be cleaned to the satisfaction of the
engineer in charge.
Cutting of Bituminous pavement for fixing of Kerb stone.
Marking shall be carried out to demarcate the exact location of the kerb stone to be fixed.
Cutting of the bituminous pavement shall be carried out by mechanical cutter only. The cutter
engaged shallbe having a diamond blade.
The minimum cutting depth is of 75 mm..
All the debris generated shall be cleared and transported to a safe place as directed by Engineer-In-Charge.
Bitumen shall be removed without damaging the road edge. If damaged then the edge has to be cut
andremoved and redone.
Surrounding shall be cleared and cleaned to the satisfaction of Engineer-In-Charge.
Mode of Measurement & Payment:
Rate shall be for per running mt of pavement cut.
Removing and refixing of kerb.
Removal of existing kerb stones of any type, any size, any thickness in safe manner with base PCC
including excavation etc and refix the same as desired location as per drawing and as directed by Engineer
in charge. Rate shall be inclusive of removing with all sub base (including excavation), refixed the same
(approved before reuse) on existing base PCC, addition kerb of same profile (if required and shall be paid
relevant tender item), disposal unserviceable material with all lifts and up to any lead at non objectional
place and stacking the serviceable material (paver) upto AMC store including loading, unloading as
directed by Engineer-in-charge.
Relevant specifications shall be followed as per item no – 11 for removing the kerb and item no –
for refixing the kerb as per specification and as directed by engineer in charge.
The Measurement of the item shall be in Rmt basis.
Filling Zari Filling of Zari along the sides of the kerb stone fixed, prepared with Bituminous Concrete
mixed in properproportion as directed by Engineer- In -Charge to form a pourable mixture.
The gaps left out after the fixing of kerbstone shall be filled and levelled.
The filling in Zari shall be done by Bituminous Concrete in proper proportion as directed by Engineer-
Care should be taken while pouring as to do the filling only upto the finished level of the road and match
the surface to the existing surface.
The workmanship and the finishing qualities along with he quality of the materials shall be as
finalized byEngineer-In-Charge.
The measurement shall be done as per the actual work done and the rate shall be for per
Providing and laying cement concrete tactile tile (for vision impaired persons as per standards)of
size 300 x 300 x 25 to 30mm of Vyara, Super, Nishu approved make and pattern having
waterabsorption not over 6% and conforming to IS: 13801:1993, of approved make, pattern and
shade(with UV light resistant colours from Lanxess only) in outdoor floors such as footpath, court
yard, multi modals location etc., laid on 30 to 40mm thick base of cement mortar 1:4 (1 cement :
coarse sand) in all shapes & patterns including grouting the joints with white cement mixed with
matching pigments etc. complete as per direction of Engineer-in-Charge.
Relevant specification shall be followed as per item no – 41 (Kota flooring) for laying of cement
concretetactile precast concrete stone of approved make, shade, pattern, size.
For dressing CPWD specifications clause no. 11.20.2 shall be followed
For laying and preparation of surface CPWD specifications clause no. 11.20.3 shall be followed except
average thickness of CM shall be 35mm to 50 mm, cement mortar shall be 1:6 ( 1 cement : 6 sand)
While laying any chiseling which may be required for making the skirting or dado flush with the plaster
and/or other finishes shall be done. Necessary grooves of required size in cm. between plaster or
other finishes and coping (both side) shall be provided. Forming machine-cut/ rounded edges, gutters,
sills, platforms, channels, curbing, etc. if any, if required, shall be provided as per the drawing and
All exposed edges of coping stone shall be in even thickness, champhered and polished matched to
stone finish. In places where full tiles cannot be fixed, the tiles shall be cut to the size and smoothened
at edge to give straight and true joints.
All necessary slopes, gradients and levels shall be truly maintained as required and directed by the
Architect and Engineer-in-charge.
The floor shall be kept wet for a minimum period of 7 days, so that bedding and joints set properly.
Polishing shall be normally commenced after 14 days of laying the slab. For special polish polishing to
be done with 2 coats of 60, 120 grades of emery, balck chapadi and gutka. For semi mirror polish
polishing to be done with 220, 320, 400, 600 grades of emery. Water shall be properly used during
polishing. The flooring shall then be washed clean with oxalic acid. Daily moping for 15 days shall be
done after polishing or up to the satisfaction of client and engineer-incharge.
All works shall be carried out as directed by the Architect and as specified in the item, nowaxing will be
If any tile is disturbed or damaged it shall be refitted or replaced, properly jointed and polished.
Cement Concrete Tactile Tiles shall be of High Strength and high wear resistant having high finish
with wear resistant aggregates (silicon carbide or equivalent) and balance colour coordinated
aggregates in face mix. Tile shall be produced with colour pigment specified by the architects, using
UV resistant colour pigments from Lanxess.
Sr. Parameters Minimum Requirements (Testing as per IS
1. Percentage Water Absorption Not over 6%
2. Wet transverse strength Not less than 3 MPA
3. Average wear in Thickness- Abrasion Average wear not more than 2mm
4. Tolerance in Size (length + breadth) ± 1mm
5. Thickness of wearing layer Not less than 8mm
6. Variation in Thickness of tiles Variation not to exceed 3mm
7. Flatness of tile surface Concavity / convexity not to exceed 1mm
8. Colours UV Light resistant fast colours from Lanxess
only to beused.
· The Tactile Tiles must confirm to IS 13801:1993.
· The Tiles must be manufactured on automatic machines with mechanical vibration and
rubberizedmoulds.
· The Tiles will be made using wear resistant materials in the face mix as specified by the architects.
· The Tiles must be cured in controlled environment to ensure efflorescence free material.
· The manufacturer must have in house testing laboratory to carry out all testing
includingCompressive strength testing, Water absorption, abrasion resistance etc.
The Measurement of the item shall be in Sqmt basis.
Mode of Measurement and Payment
Kota slab flooring shall be measured in m2 for visible area of work done. Length and
breadth shallbe measured correct to a cm before laying skirting, dado or plaster.
No deductions shall be made or extra paid for any opening in the floor area upto 0.1 m2.
Nothing extra shall be paid for use of cut tiles or for laying the floors at different levels in the
same room or courtyard. Kota slabs laid in floor boarders and bands etc. shall be measured in
the same item and nothing extra shall be payable on account of these or similar bands formed
of half or multiples of half size standard tiles/or other uncut tiles.
The rate shall include the cost of all materials (inclusive of all taxes, levies, and delivery
at site), labour & sundry involved in all the operations, at all floors, at any height and level,
as described above. It shall also include for breakage and wastage. Floating materials and
margin of profit shall also be included. All material samples shall be approved by the
Architect/Engineer-in-charge before placing orders.
No extra shall be paid for any small quantities like narrow widths, mitred & returned ends,
rounds &cutting, fixing and making good upto & around pipes, fittings and fixtures etc.
The basic rate, if at all provided or agreed upon includes cost of material, all taxes, levies &
cost ofdelivery at site.
3.8 The kota stone shall be upto 300mm wide and 900 mm long with champhering and
polishing to allexposed edges.
The Measurement of the item shall be in Sqmt basis.
Painting Two Coats on divider and footpath curb surface / New Concrete Surface (Painting two coats
afterfilling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces)
Relevant specifications shall be followed as per item no – 70 except for application on concrete surface
i.e.kerb, divider instead of MS structure.
The Measurement of the item shall be in Sqm basis.
Providing and setting 50 to 60 mm thick rouge kotah stone water table in line, level and in required
gradient including 25 mm thick beddcing in C.M. 1:6 (1 Part of cement : 6 Part of coarse sand) with
sufficient ramming consolidation. Providing joints in C.M. 1:3 (1 Part of cement : 3 Part coarse
sand) and smooth pointing in C.M. 1:1 (1 Part of Cement, 1 Part of coarse sand) including watering
etc. complete and as per details in tender specification & as directed by engineer in charge.
Size : 1' x 1'(40 to 50 mm thick)
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge and/or
hisauthorized representative.
Mode of measurements shall be on RMT basis.
Providing and fixing 75 mm thick Tree Grating 950*950*75 mm as per design and drawing. The rate
shall be inclusive of providing and laying 50 to 80 mm thick average bedding layer of coarse sand below
tree grating as per required grading and specification. The centre of the grating to be same as the centre
of the tree trunk. The grating to be 8 pieces as per drawing. The work of the grating blocks shall be
executed in line and level by skilled mason of flooring work only.
As per item decription or as decided by engineer in charge.The Measurement of
the item shall be in Number basis.
Paver Block Providing and laying, Dished Channel specified thickness, size, grade of concrete and colour
machine made and blasting by automatic shot blasting machine and high density of as per approved
sample of approved make for suite drain besides paking area and other areas as mentioned in the
drawing. Including providing and laying 50 mm thick average bedding layer of coarse sand below
dished channel as per required grading and specification. Laid dished channel shall be mechanically
compacted. The work of the dished channel shall be executed in line and level by skilled mason.
Small size of dished channel with same specification shall be used at residue or at end. If cutting of
dished channel shall be required , than cut by machine only and laying to be done by skilled flooring
mason. Actual laid area shall be measured and paid without any wastage. (A) 600 mm X 300 mm X
100 mm thick M-25 grade Grey dished curved channel
As per item decription or as decided by engineer in charge.
The Measurement of the item shall be in rmt.
P/L Reqady Mix controlled cement concrete M. 200 & curing complete, excluding the cost of form work and
reinforcement for reinforced concrete work in
This Specification covers the general requirements for concrete using on-site production facilities including
requirements in regard to the quality, handling, storage of ingredients, proportioning, batching,
mixing,transporting, placing, curing, protecting, repairing, finishing and testing of concrete; form work;
requirements in regard to the quality, storage, bending and fixing of reinforcement; grouting as well as mode of
measurement and payment for complete works.
It shall be very clearly understood that the specifications given herein are brief and do not cover minute details.
However, all work shall have to be carried out in accordance with the relevant standards and codes of practices
or in their absence in accordance with the best accepted current engineering practices or as directed by
Engineer from time to time. The decision of Engineer as regards the specification to be adopted and their
interpretation and the mode of execution of work shall be final and binding on Contractor and no claim
whatsoever will be entertainment on this account.
APPLICABLE CODES AND SPECIFICATIONS
The following specifications, standards and codes, including all official amendments/revisions and other
specifications and codes referred to therein, should be considered a part of this specification. In all cases the
latest issue/edition/revision shall apply. In case of discrepancy between this specification and those referred to
herein below or other specifications forming a part of this bid document, this specification shall govern.
CODE FOR MATERIALS:
1. IS: 4031 (Parts 1 to 15) Methods of physical tests for hydraulic cement
2. IS: 4032 Methods of chemical analysis of hydraulic cement
3. IS: 650 Specifications for standard sand for testing of cement
4. IS: 2430 Methods for sampling of aggregates for concrete
5. IS: 2386 (Part 1 to 8) Methods of test for aggregates for concrete
6. IS: 3025 Methods of sampling and test (physical and chemical) water used in industry
7. IS: 6925 Methods of test for determination of water soluble chlorides in concrete admixtures
CODE FOR MATERIALS STORAGE
1. IS: 4082 Recommendations on stacking and storing of construction materials at site
CODE FOR CONCRETE MIX DESIGN
1. IS: 10262 Recommended guidelines for concrete mix design
2. SP: 23 (S&T) Handbook on Concrete Mixes.
CODE FOR CONCRETE TESTING:
1. IS:1199 Method of sampling and analysis of concrete
2. IS:516 Method of test for strength of concrete
3. IS:9013 Method of making, curing and determining compressive strength of accelerated cured concrete test
4. IS:8142 Method of test for determining setting time of concrete by penetration resistance.
5. IS:9284 Method of test for abrasion resistance of concrete
6. IS:2770 Methods of testing bond in reinforced concrete
CODE FOR EQUIPMENT
1. IS:1791 Specification for batch type concrete mixers
2. IS:2438 Specification for roller pan mixer
3. IS:4925 Specification for concrete batching and mixing plant
4. IS:5892 Specification for concrete transit mixer and agitator
6. IS:2505 General requirements for concrete vibrators: Immersion type
7. IS:7251 Specification for concrete finishers
8. IS:2722 Specification for portable swing weigh batchers for
concrete (single and double bucket type).
9. IS:2750 Specification for steel scaffoldings
CODES OF PRACTICE (LATEST REVISION)
1. IS:456 Code of practice for plain and reinforced concrete
2. IS:457 Code of practice for general construction of plain and
reinforced concrete for dams and other massive structures
3. IS:3370 (Parts 1 to 4) Code of practice for concrete structures for storage of liquids.
4. IS:3935 Code of practice for composite construction
5. IS:2204 Code of practice for construction of reinforced concrete shell roof.
6. IS:2210 Criteria for the design of reinforced concrete shell structures and folded plates.
7. IS:2502 Code of practice for bending and fixing of bars for concrete reinforcement
8. IS:5525 Recommendation for detailing of reinforcement in reinforced concrete works
9. IS:2751 Code of practice for welding of mild steel plain and deformed bars used for reinforced concrete
10. IS:9417 Specification for welding cold worked bars for reinforced concrete construction
11. IS:3558 Code of practice for use of immersion vibrators for consolidating concrete
12. IS:3414 Code of practice for design and installation of joints in buildings
13. IS:4326 Code of practice for earthquake resistant design and construction of building
14. IS:4014 (Part 1 and 2) Code of practice for steel tubular scaffolding
15. IS:2571 Code of practice for laying in-situ cement concrete flooring
16. IS:7861 Code of practice for extreme weather concreting
(Part-1) Recommended practice for hot weather concreting
(Part-2) Recommended practice for cold weather concreting.
CODE FOR CONSTRUCTION SAFETY
CODE FOR MEASUREMENT
1. IS:1200 (Part 1 to 28)
Method of measurement of building and engineering works
2. IS:3385 Code of practice for measurement of Civil Engineering works
1. IS:3696(Part 1 and III) Safety code for scaffolds and ladders
2. IS:7969 Safety code for handling and storage of building materials
3. IS:8989 Safety code for erection of concrete framed structures
Engineer shall have the right at all times to inspect all operations including the sources of materials,
procurements, layout and storage of materials, the concrete batching and mixing equipment, and the quality
control system. Such an inspection shall be arranged and Engineer’s approval obtained, prior to starting of
concrete work. This shall, however, not relieve Contractor of any of his responsibilities. All materials does not
conform to this specification shall be rejected. Materials should be selected so that they can satisfy the design
requirements of strength, serviceability, safety, durability and finish with due regards to the functional
requirements and the environmental conditions to which the structure will be subjected. Materials complying
with codes/standards shall generally be used; other materials may be used after approval of the Engineer and
after establishing their performance suitability based on previous data, experience or tests.
Unless otherwise specified or called for by the Engineer, cement shall be Ordinary Portland Cement to IS:
(latest edition) for entire work. Where Portland pozzolana or slag cement are used, it shall be ensured that
consistency of quality is maintained, there will be no adverse interactions between the materials and the finish
specified is not marred. Only one type of cement shall be used in any one mix. The source of supply, type or
brand of cement within the same structure or portion thereof shall not be changed without approval from
Cement which is not used within 90 days from its date of manufacture shall be tested at a laboratory approved
by Engineer and until the results of such tests are found satisfactory, it shall not be used in any work.
“Aggregate” in general designates both find and coarse inert materials used in the manufacture of concrete
(vide BIS 456 and BIS 383) and conforming to tests as per BIS 2386 (Part 1 to VI). “Coarse Aggregate” is
aggregate most of which is retained when passed through on 4.75 mm BIS sieve.All fine and coarse aggregates
prFoposed for use in the works shall be subject to the Engineer-in-charge’s approval and after specific materials
have been accepted, the source of supply of such materials shall not be changed without prior approval of the
Engineer-in-charge.
Aggregates shall consist of natural sand, stone (crushed or uncrushed) and gravel from a source known to
produce satisfactory aggregate for concrete and shall be chemically inert, non-flaky, strong, hard, durable
against weathering, or limited porosity and free from deleterious materials that may cause corrosion of the
reinforcement or may impair the strength and or durability of concrete. The grading of aggregates shall be such
as to produce a dense concrete of specified strength and consistency that will work readily into position without
segregation and shall be based on the “mix design” and preliminary tests on concrete specified later.
SAMPLING AND TESTING
Samples of the aggregates for mixed design and determination of suitability shall be taken under the supervision
of the Engineer-in-charge and delivered to the laboratory, well in advance of the scheduled placing of concrete,
Records of tests, which have been made on proposed aggregates and on concrete made from this source of
aggregates shall be furnished to Engineer-in-charge in advance of the work, for use in determining aggregate
suitability. The costs of all such tests, sampling etc. shall be borne by the contractor.
STORAGE OF AGGREGATE
All coarse and fine aggregates shall be stacked separately in stock piles in the material yard near the work site in
bins properly constructed to avoid inter mixing of different aggregates. Contamination with foreign material and
earth during storage and while heaping the materials shall be avoided. The aggregates must be
of specified quality not only at the time of receiving at site but more so at the time of loading into mixer. Rakers
shall be piled in layers not exceeding 1.20 m in height to prevent coning or segregation. Each layer shall cover
the entire area of stock pile before succeeding layers are started. Aggregates that have become segregated shall
SPECIFIC GRAVITY
Aggregates having a specific gravity below 2.4 (saturated surface dry basis) shall not be used:
Fine aggregate shall consist of natural or crushed sand conforming to IS 383 conforming to tests as per 2386 1 to
IV. The sand shall be clean, sharp, hard, strong and durable and shall be free from dust, vegetables substances,
adherent coating, clay, alkali, organic, matter mica, salt or other deleterious substances, which can be injurious
to the setting qualities/strength/durability of concrete.
SCREENING AND WASHING:
Sand shall be prepared for use by such screening or washing, or both, as necessary, to remove all objectionable
foreign matter while separating the sand grains to the required size fraction.
FOREIGN MATERIAL LIMITATIONS:
The percentage deleterious substances in sand delivered to the mixer shall not exceed the following:
Unless otherwise directed or approved by the Engineer-in-charge, the grading of sand shall be within the limits
indicated hereunder:
Where the grading falls outside the limits of any particular grading zone of sieves, other than 600 microns IS
sieve, by total amount not exceeding 5%, it shall be regarded as falling within that grading zone. This tolerance
sieve, by total amount not exceeding 5%, it shall be regarded as falling within that grading zone. This tolerance
shall not be applied to percentage passing the 600 micron IS sieve or to percentage passing any other sieve on
the coarser limit of grading zone 1 or the finer limit of grading zone IV. Fine aggregates conforming to grading
zone IV shall not be used. Mix designs and preliminary tests shall show its suitability for producing concrete of
specified strength and workability.
FINENESS MODULUS
The sand shall have a fineness modulus of not less than 2.2 or more than 4.2. The fineness modulus is
determined by adding the cumulative percentages retained on the following IS sieve sizes (4.75 mm, 2.35 mm,
1.18 mm, 600 microns and 150 microns) and dividing the sum by
COARSE AGGREGATE
Coarse aggregate for concrete, except as noted above, shall conform to IS 383 and IS 2386. This shall consist of
crushed stone and shall be clean and free from elongated, flaky or laminated pieces, adhering coatings, clay
lumps, coal residue, clinkers, slag, alkali, mica, organic matter or other deleterious matter.
Foreign Material Percentage by weight Uncrushed Crushed.
1. Material finer than 75 micron IS sieve 3.0
2. Shale 1.0 --
3 Coal and Lignite 1.0
4 Clay Lumps 1.0
SCREENING AND WASHING:
Crushed rock shall be screened and or washed for the removal of dirt or dust coating, if so requested by the
Engineer In charge.
Coarse aggregate shall be either in single size or graded, in both cases the grading shall be within the
following units:
Percentage passing for single sized aggregate of normal size Percentage passing for graded aggregate of
The pieces shall be angular in shape and shall have granular or crystalline surfaces. Friable, flaky and laminated
pieces, mica and shale, if present, shall be only within tolerance limits which will not affect adversely the
strength and or durability or concrete. The maximum size of coarse aggregate shall be 40 mm for M 7.5 and M
10 and 20mm for M15 to M20 concrete, or as directed by the Engineer-in-Charge or specified otherwise. The
maximum size of coarse aggregate shall be the maximum size specified above but in no case greater than 1/4th
of the minimum thickness of the number, provided that the concrete can be placed without difficulty so as to
surround all reinforcement thoroughly and fill the corners of the form. For plain concrete the maximum size of
aggregate shall be of 40 mm. For heavily reinforced concrete members, the nominal maximum size of the
aggregate shall be 5 mm less than the minimum clear distance between the reinforcing main bars or 5 mm less
than the minimum cover reinforcement whichever is smaller.
FOREIGN MATERIAL LIMITATIONS
The percentage of deleterious materials in the aggregate delivered to the mixer shall not exceed thefollowing:
Water used for both mixing and curing shall conform to IS: 456. Potable water is generally satisfactory. Water
containing any excess of acid, alkali, sugar or salt shall not be used.
Reinforcement bars shall conform to IS: 432 IS: 226 or IS: 1786 and the welded wire fabric to IS: 1566 as shown
or specified on the drawings.
All reinforcement shall be clean, free from pitting, oil, grease, paint, loose mill scales, rust, dirty dust or any
other substance that will destroy or reduce bond.
Sr. No. Foreign Material
Percentage by weight
Uncrushed Crushed
1. Material finer than 75 micron IS sieve 3.0
2. Coal and Lignite 1.0
3. Clay lumps 1.0
4. Soft fragments 3 .0 --
If permitted by Engineer, welding of reinforcement shall be done in accordance with IS: 2751 or IS:
Accelerating, regarding, water reducing and air entraining admixtures shall conform to IS: 9013 and integral
water proofing admixtures to IS:
Admixtures may be used in concrete as per manufacturer’s instructions only with the approval of Engineer
based upon evidence that with the passage of time neither the compressive strength nor its durability is
reduced. An admixture’s suitability and effectiveness shall be verified by trial mixes with the other material
used in the work. If two or more admixtures are to be used simultaneously in the same concrete mix, their
interaction shall be checked and trial mixes done to ensure their compatibility. There should also be no increase
in risk of corrosion of the reinforcement or other embedment.Calcium chloride shall not be used for accelerating
set of the cement for any concrete containing reinforcement or embedded steel parts. When calcium chloride is
permitted such as in mass concrete works, it shall be dissolved in water and added to the mixing water by an
amount not exceeding 1.5 percent of the weight of the cement in each batch of concrete. The designed concrete
mix shall be corrected accordingly
No wastage allowance for cement and steel shall be considered and paid for.
SAMPLES AND TESTS
All materials used for the works shall be tested before use. Manufacturer’s test certificate shall also be got
tested by the Contractor in a laboratory approved by Engineer at no extra cost to Client. However, where
material is supplied by client, all testing charges shall be borne by client, but transportation of material samples
to the laboratory shall have to be done by contractor at no extra cost.
Sampling and testing shall be as per IS: 2386 under the supervision of Engineer, The cost of all tests,sampling
etc. shall be borne by Contractor. Water to be used shall be tested to comply with requirement of IS:
Contractor shall furnish manufacturer’s test certificates and technical literatures for the admixture proposed to
be used. If directed the admixture shall be got tested and approved laboratory at no extra cost.
STORING OF MATERIAL
All material shall be stored in a manner so as to prevent its deterioration and contamination which would
prelude its use in the works. Requirements of IS: 40-82 shall be complied with.Contractor will have to make his
own arrangements for the storage of adequate quantity of cement even if cement is supplied by client. Cost of
such rejected cement, where cement is supplied by client, shall be recovered at issue rate or open market rate
which ever is higher. Cement bags shall be stored in dry weatherproof shed with a raised floor, well away from
the outer walls and insulated from the floor to avoid moisture from ground. Not more than 15 bags shall be
stacked in any tier. Storage arrangement shall be approved by Engineer. Storage under Tarpaulins shall not be
permitted. Each consignment of cement shall be stored separately and consumed in its order or receipt.Each
size of coarse and fine aggregates shall be stacked separately and shall be protected from leaves and
contamination with foreign material. The stacks shall be on hard, clean, free draining bases, draining away from
the concrete mixing area.
Contractor shall make his own arrangements for storing water at site in tanks to prevent contamination.
The reinforcement shall be stacked on top of timber sleepers to avoid contract with ground/water. Each type
and size shall be stacked separately.
Concrete grade shall be as designated on drawings. In concrete grade M15, M20, M25 etc. the number
represents the specified characteristic compressive strength of 150 mm cube at 28 days, expressed in N/sq.mm
as per IS:456. Concrete in the works shall be “Design Mix Concrete” or Normal Mix Concrete” Allconcrete works
of grade M5, M7.5 and M10 shall be nominal whereas all other grades, M15 and above,
shall be Design Mix Concrete.
DESIGN MIX CONCRETE
MIX DESIGN AND TESTING
For Design Mix Concrete, the mix shall be designed according to IS:10262 and SP:23 to provide the grade of
concrete having the required workability and characteristics strength not less than appropriate values given in
IS:456. The design mix shall in addition be such that it is cohesive and does not segregate and
should result in dense and durable concrete and also capable of giving the finish as specified. Fort water
retaining structures the mix shall also result in water with concrete. The contractor shall exercise great care
while designing the concrete mix and executing the works to achieve the desired result.
Unless otherwise specifically mentioned, the minimum cement content for design mix concrete shall be as given
Grade of Concrete Minimum cement content
In Kg/Cu.m of concrete
The minimum cement content stipulated above shall be adopted irrespective of whether the contractor
achieves the desired strength with less quantity of cement. The contractor’s quoted rates for concrete shall
provide for the above eventually and nothing extra shall become payable to the contractor in this account.Even
in the case where the quantity of cement required is higher than that specified above to achieve desired
strength based on an approved mix design, nothing extra shall become payable to the contractor. It shall be
contractor’s sole responsibility to carry out the mix designs at his own cost. He shall furnish to Engineer atleast
30 days before concreting operations, a statement of proportions proposed to be used for various concrete
mixes and the strength results obtained. The strength requirements of the concrete mixes ascertained on
mm cubes as per IS: 516 shall comply with the requirements of IS:
Minimum Compressive Strength
(N/Sq.mm at 7 days)
Specified compressive strength
(N/Sq.mm at 28 days)
A range of slumps, which shall generally be used for various types of construction unless otherwise instructed by
the Engineer, is given below:-
Structure/member Slump in millimeters
Maximum Minimum
Reinforced foundation walls and footings 75
Plain footings, caissons and substructure walls 75
T.G. and massive compressor foundations 50
Slabs, beams and reinforced walls 100
Pumps and miscellaneous equipment foundations 75
Building columns 100
Heavy mass construction 50
BATCHING AND MIXING OF CONCRETE
Proportions of aggregates and cement, as decided by the concrete mix design, shall be by weight. These
proportions shall be maintained during subsequent concrete batching by means of weigh batchers capable of
controlling the weights within one percent of the desired value. Amount of water added shall be such as to
produce dense concrete of required consistency, specified strength and satisfactory workability and shall be so
adjusted to account for moisture content in the aggregates. Water cement ratio specified shall be maintained.
Each time the work stops, the mixer shall be cleaned out, and while recommending the first batch shall have
10% additional cement to allow for sticking in the drum, Arrangement should be made by contractor to have the
cubes tested in an approved laboratory or in field at his own expense, with prior consent of Engine4re. Sampling
and testing of strength and workability of concrete shall be as per IS: 1199, IS: 516 and IS:
NOMINAL MIX CONCRETE
Mix design and preliminary tests are not necessary for Nominal mix concrete. However works tests shall be
carried out as per IS: 456. Proportions for Nominal Mix Concrete and water/cement ratio may be adopted as per
Table 3 of IS: 456. However it will be contractor’s sole responsibility to adopt appropriate nominal mix
proportions to yield the specified strength.
BATCHING AND MIXING CONCRETE
Based on the adopted nominal mixes, aggregates and cement shall be measured by weight.
PREPARATION PRIOR TO CONCRETE PLACEMENT
Before concrete is actually placed in position, the inside of the form work shall be cleaned and mould oil applied,
inserts and reinforcement shall be correctly positioned and securely held, necessary openings pockets etc.
All arrangements formwork, equipment and proposed procedure, shall be approved by Engineer. The Contractor
shall maintain separate Pour Card for each pour as per the format enclosed and shall produce before
commencement of concreting to Engineer-in-charge.
TRANSPORTING, PLACING AND COMPACTING CONCRETE
Concrete shall be transported from the mixing plant to the formwork with minimum time lapse by methods that
shall maintain the required workability and will prevent segregation, loss of any ingredients or ingress of foreign
matter or water.
In all cases concrete shall be deposited as early as practicable directly in its final position. To avoid segregation
concrete shall not be re-handled or caused to flow. For locations where direct placement is not possible and in
narrow forms. The Contractor shall provide suitable drops and “Elephant Trunks” Concrete shall not be dropped
from a height of more than 1.0 mm as stipulated in clause D.6.8.13.
Concrete shall not be placed in flowing water. Under water, concrete shall be placed in position by tremies or by
pipeline from the mixer and shall never be allowed to fall freely through the water. While placing concrete the
Contractor shall proposed as specified below and also ensure the following:
a) Continuously between construction joints and predetermined abutments.
b) Without disturbance to forms or reinforcement.
c) Without disturbance to pipes, ducts, fixings and the like to be cast in; ensure that such items are securely
fixed. Ensure that concrete cannot enter open ends of pipes and conduits etc.
d) Without dropping in a manner that could cause segregation or shock.
e) In deep pours only when the concrete and framework designed for this purpose and by using suitable chutes
f) Do not place if the workability is such that full compaction cannot be achieved.
g) Without disturbing the unsupported sides of excavations; prevent contamination of concrete with earth.
Provide sheeting if necessary. In supported excavations, withdraw the lining progressively as concrete is placed.
h) If placed directly on to hardcore or any other porous material, dampen the surface to reduce loss of water
from the concrete.
i) Ensure that there is no damage or displacement to sheet membranes.
j) Record the time and location of placing structural concrete. Concrete shall normally be compacted in its final
position within thirty minutes of leaving the mixer. Concrete shall be compacted during placing with approved
vibrating equipment without causing segregation until it forms a solid mass free from voids thoroughly worked
around reinforcement and embedded fixtures and into all corners of the formwork. Immersion vibrators shall be
inserted vertically at points not more than 450 mm apart and withdrawn slowly till air bubbles cease to come to
surface, leaving no voids. When placing concrete in layers advancing horizontally, care shall be taken to ensure
adequate vibration, blending and melding of concrete between successive layers. Vibrators shall not be allowed
come in contract with reinforcement, formwork and finished surfaces after start of initial set. Over vibration
shall be avoided.Concrete may be conveyed and placed by mechanically operated equipment after getting the
complete procedure approved by Engineer. The slump shall be held to the minimum necessary for conveying
concrete by this method. When concrete is to be pumped concrete mix shall be specifically designed to suit
pumping. Care shall be taken to avoid stoppages in work once pumping has started.Except when placing with
slip forms, each placement of concrete in multiple lift work, shall be allowed to set for at least 24 hours after the
final set of concrete before the start of subsequent placement. Placing shall stop when concrete reaches the top
of the opening in walls or bottom surface of slab, in slab and beam construction, and it shall be resumed before
concrete takes initial set but not until it has had time to settle as determined by Engineer. Concrete shall be
protected against damage until final acceptance.
Curing and protection shall start immediately after the compaction of concrete to protect it from:
(a) Premature drying out, particularly by solar radiation and wind;
(b) Leaching out by rain and flowing water;
(c) Rapid cooling during the first few days after placing;
(d) High internal thermal gradients;
(e) Low temperature of frost;
(f) Vibration and impact which may disrupt the concrete and interfere with its bond to the reinforcement.All
concrete, unless directed otherwise by Engineer, shall be cured by use of continuous sprays or pounded water or
continuously saturated coverings of sacking, canvas, hessian or other absorbent material for the period of
complete hydration with a minimum of 7 days. The quality of curing water shall be the same as that used for
mixing.Where a curing membrane is directed to be used by the Engineer, the same shall be of a non-wax base
and shall not impair the concrete finish in any manner. The curing compound to be used shall be got approved
from the Engineer before use and shall be applied with spraying equipment capable of a smooth, even textured
coat. Curing may also be done by covering the surface with an impermeable material such as polyethylene,
which shall be well sealed and fastened. Extra precautions shall be exercised in curing concrete during cold and
CONSTRUCTION JOINTS AND KEYS
Construction joints will be as shown on the drawing or as approved by Engineer. Concrete shall be placed
without interruption until completion of work between construction joints. If stopping of concreting becomes
unavoidable anywhere, a properly formed construction joint shall be made with the approved of Engineer.
Dowels for concrete work, not likely to be taken up in the near future, shall be coated with cement slurry and
encased in lean concrete as indicated on the drawings or as directed by Engineer. Before resuming concreting on
a surface which has hardened all laitance and loose stone shall be thoroughly removed by wire brushing/hacking
and surface washed with high pressure water jet and treated with thin layer of cement slurry for vertical joints
and a 15 mm thick layer of cement sand mortar for horizontal layers, the ratio of cement and sand being the
same as in the concrete mix. When concreting is to be resumed on a surface which has not fully hardened, all
laitance shall be removed by wire brushing, the surface wetted, free water removed and a coat of cement slurry
applied. On this a layer of concrete not exceeding 150 mm thickness shall be placed and well rammed against
the old work. There after work shall proceed in the normal way.
FOUNDATION BEDDING
All earth surfaces upon which or against which concrete is to be placed, shall be well compacted and free
from standing water, mud or debris. Soft or spongy area shall be cleaned out and back filled with either soil
cement mixture, lean concrete or clean sand compacted as directed by Engineer. The surfaces of absorptive
soils shall be moistened.
The frame work for concrete works shall be such as to give the finish as specified; defects due to bad
workmanship (e.g. damaged or misaligned forms, defective or poorly compacted concrete) will not be
accepted. The Contractor shall construct the formwork using the correct materials and to meet the
requirements of the design and to produce finished concrete to required dimensions, plumbs, planes and
REPAIR AND REPLACEMENT OF UNSATISFACTORY CONCRETE
Immediately after the shuttering is removed, all the defective areas such as honey combed surfaces, rough
patches, holes left by form bolts etc. shall be brought to the notice of Engineer who may permit patching of the
defective areas or reject the concrete work. All though holes for shuttering shall be filled for full depth and
neatly plugged flush with surface. Rejected concrete shall be removed and replaced by Contractor at no
additional cost to Client.For patching of defective areas all loose materials shall be removed and the surface
shall be prepared as directed by the Engineer.Bonding between hardened and fresh concrete shall be done
either by placing cement mortar or by applying epoxy. The decision of the Engineer as to the method of repairs
to be adopted shall be final and binding on the Contractor and no extra claim shall be entertained on this
account. The surface shall be saturated with water for 24 hours before patching is done with 1:5 cement sand
mortar. The use of epoxy for bonding fresh concrete shall be carried out as directed by Engineer.
HOT WEATHER REQUIREMENTS
Concreting during hot weathers shall be carried out as per IS: 7861 (Part-I) Adequate provisions shall be made to
lower concrete temperatures which shall not exceed 40 Deg. C at the time of placement of fresh
concrete.Where directed by Engineer, Contractor shall spray non-wax based curing compound of unformed
concrete surfaces at no extra costs.
COLD WEATHER REQUIREMENTS
Concreting during cold weather shall be carried out as per IS : 7861 (Part-II). The ambient temperature during
placement and upto final set shall fall below 5 Deg. C. Approved antifreeze/accelerating additives shall be used
where directed.For major and large scale concreting works the temperature of concrete at time of mixing and
placing, the thermal conductivity of the formwork and its insulation and stripping period shall be closely
LIQUID RETAINING STRUCTURES
The Contractor shall take special care of concrete for liquid retaining structures, underground structures and
those others specifically called for to guarantee the finish and water tightness. The minimum level of surface
finish for liquid retaining structures shall be as per clause D.6.16. All such structures shall be hydro-tested.The
contractors shall include in his price of hydro-testing of structure, all arrangements for testing such as temporary
bulk heads, pressure gauges, pumps, pipelines etc.Any temporary arrangements that may have to be made to
ensure stability of the structures shall also be considered to have been taken into account while quoting the
rates.Any leakage that may occur during the hydro-test or subsequently during the defects liability period or the
period for which the structure is guaranteed shall be effectively stopped either by cement/epoxy pressure
grouting, gunting or such other methods as may be approved by the Engineer. All such rectification of the Client
/ Engineer at no extra cost to the Client.
TESTING CONCRETE STRUCTURE FOR LEAKAGE
Hydro-static test for water tightness shall be done at full storage by Engineer, as described below:
In case of structures whose external faces are exposed, such as elevated tanks, the requirements of the test
shall be deemed to be satisfied if the external faces show no sign of leakage or sweating and remain completely
dry during the period of observation of seven days after allowing a seven day period for absorption after filling
with water.In case of structures whose external faces are submerged and are not accessible for inspection, such
as underground tanks, the structures shall be filled with water and after the expiry of seven days after filling,the
level of the surface of the water shall be recorded. The level of water shall be recorded again at subsequent
intervals of 24 hrs, over a period of seven days. Backfilling shall be withheld till the tanks are tested. The total
drop in surface level over a period for seven day shall be taken as an indication of the water tightness of the
structure. The Engineer shall decide on the actual permissible nature of this drop in the surface level, taking into
account weather the structures are open or closed and the corresponding effect it has on evaporation losses.
Unless specified otherwise, a structure whose top is covered shall be deemed to be water tight if the total drop
in the surface level over a period of seven days does not exceed 40 mm.
Each compartment/segment of the structure shall be tested individually and then all together.For structures
such as pipes, tunnels etc. the hydro-static test shall be carried out by filling with water, after curing as specified,
and subjecting to the specified test pressure for specified period. If during this period the loss of water does not
exceed the equivalent of the specified rate, the structure shall be considered to have successfully passed the
If Engineer feels that the materials i.e. .cement, sand coarse aggregates, reinforcement and water are not in
accordance with the specifications or if specified concrete strengths are not obtained, he may order tests to be
carried out on these materials in laboratory, to be approved by the Engineer, as per relevant IS Codes. Client
shall pay only for the testing of material supplied by the Client, otherwise Contractor shall have to
pay for the tests. Transporting of all material to the laboratory shall however be done by the Contractor at no
extra cost to client.In the even of any work being suspected of faulty material or workmanship requiring its
removal or if the works cubes do not give the stipulated strengths, Engineer reserves the right to order the
Contractor to take out cores and conduct tests on them or do ultrasonic testing or load testing of structure, etc.
All these tests shall be carried out by Contractor at no extra cost to the Client. Alternatively Engineer also
reserves the right to ask the Contractor to dismantle and re-do such unacceptable work at the cost of
Contractor.If the quoted unit rates/prices of concrete shall be deemed to provide for all tests mentioned above.
All materials, workmanship and finished construction shall be subject to continuous inspection and approval of
Engineer. Materials rejected by Engineer shall be expressly removed from site and shall be replaced by
Contractor immediately at no extra cost to Client.
Upon the completion of concrete work, all forms, equipment, construction tools, protective coverings and
any debris, scraps of wood etc. resulting from the work shall be removed and the premises left clean.
ACCEPTANCE CRITERIA
Any concrete work shall satisfy the requirements given below individually and collectively for it to be acceptable.
a) Properties of constituent materials;
b) Characteristic compressive strength;
c) Specified mix proportions;
d) Minimum cement content;
e) Maximum cement content;
f) Workability;
g) Temperature of fresh concrete;
h) Density of fully compacted concrete;
i) Cover to embedded steel;
k) Tolerances in dimensions;
l) Tolerances in levels;
n) Surface finishes;
o) Special requirements such as :
(i) Water tightness;
(ii) Resistance to aggressive chemicals
(iii) Resistance to freezing and thawing
(iv) Very high strength
(v) Improved fire resistance
(vi) Wear resistance
(vii) Resistance to early thermal cracking
The Engineer’s decision as to the acceptability or otherwise of any concrete work shall be final and binding of
the Contractor. For work not accepted, the Engineer may review and decide whether remedial measures are
feasible so as to render the work acceptable. The Engineer shall in that case direct the Contractor to undertake
and execute the remedial measures. These shall be expeditiously and effectively implemented by the
Contractor.Nothing extra shall become payable to the Contractor. Nothing extra shall become payable to the
Contractor by the Client for executing the remedial measures.
Providing, supplying and fixing precast C.C. blocks (M-20) edge kerb having size of 75 x 300 x 300 mm depth
and as per design conveying it to the site, jointing into C:M 1:3 and racking out the joints incl. necessary
excavation of asphalt, soil etc..completed..
Providing ,Supplying & fixing precast C.C. block (M20) edge having size of 75 x 300 x 300 mm depth and as per
design, conveying it to the site, jointing info C.M.(1:3) & racking out the joints including with necessary
excavation of asphalt / soil or any type of materials, disposing of the unserviceable material with in 5.0 km.
lead etc. comp. as directed.(b) Laying in 5 cm thick 1:6 bedding
Laying Trenches of specified width and depth shall first be made along the edges of the wearing course of the
road or along the line of pave block flooring to receive the restraint blocks. The bed of the trenches shall be
compacted manually with steel rammers to a firm and even surface and then stones shall be set in P.C.C.The
edge restraint blocks shall be laid with their length running parallet to the paving edge, true in line and gradient.
The joints of blocks shall be not more than 10 mm and filled with the CM 1:3(1cement:3 fine sand) which shall
be cured for 7 days.Finishing The edges shall be restored and all surplus earth including rubbish etc. disposed off
as directed by the Engineer-in Charge.Measurements Length of the finished work shall be measured in running
The rate shall include the cost of the materials and labour including stone of specified material involved in all
the operation described above.
Mode of mesaurement: measurement shall be Rmt. Basis
Item No. 46 Scraping oil paint from steel and other Metal Surface and
making the surface even ( with Hand scraping) bilding SOR 23-24 item code-0 page-141
Mode of mesaurement: measurement shall be smt Basis
Item No. 47 Applying priming coat over old kerb surface after and including,preparing the surface with ready
mixed priming paint brushing red lead
Mode of mesaurement: measurement shall be smt Basis
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (North West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
As per City Engineer’s circular no.-6/2011-12 Dt.24.6.2011 all terms & conditions will be
CONTRACTOR'S SIGNATURE ADD.CITY ENGINEER
& STAMP (North West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
30 Tender documents.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .