| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.9 LAccepted-AOC SANJAYPALLY P O CANNING TOWN DIST SOUTH 24 PARGANAS PIN 743329 | CANNING TOWN | SOUTH 24 PARGANAS | WEST BENGAL | 743329 | ₹4.9 L | 1 | Accepted-AOC LI BIDDER |
| 2 | 2₹5.8 L+₹97,487 (20.0%)Rejected-Finance | ₹5.8 L+₹97,487 (20.0%) | 2 | Rejected-Finance L2 |
| 3 | 2₹5.8 L+₹97,487 (20.0%)Rejected-Finance GORAHA ITAHAR U DINAJPUR | ITAHAR | UTTAR DINAJPUR | WEST BENGAL | ₹5.8 L+₹97,487 (20.0%) | 2 | Rejected-Finance L2 |
| 4 | 3₹6.4 L+₹1.6 L (32.0%)Rejected-Finance | ₹6.4 L+₹1.6 L (32.0%) | 3 | Rejected-Finance L3 |
| 5 | 4₹6.4 L+₹1.6 L (32.0%)Rejected-Finance | ₹6.4 L+₹1.6 L (32.0%) | 4 | Rejected-Finance L4 |
Tender Value
₹7.3 L
EMD Value
₹14,616
Closing Date
23 Jun 2026, 5:00 pmClosed
Executive Engineer-II Joynagar Irrigation Division
Office of the Executive Engineer_II, JID
Emergent restoration of Sundarban Embankment damaged due to New Moon Kotal on dated 16.05.2026 to 20.05.2026 inbetween 28.05km to 28.17 km. facing RB of river Gurakhal in Mz - Nagenabad in PS-Maipith Coastal, Block- Kultali in District S24pgs.
2026_IWD_1028691_1
WBIW/EE-II/JOY/SNIT- 2(e)/2026-27
Open Tender
CIVIL WORKS
Percentage
15 days
Kultala
Please refer Tender documents.
7 documents required · 7 mandatory
₹14,616
Yes
3 Sept 2026
20 Jun 2026
24 Jun 2026
20 Jun 2026
23 Jun 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction ofthe Engineer in-charge within a lead of,
NB: Measurement to be taken on the basis of stack
measurement/prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. Compensation for earth for land owned/rranged by the contractor@ Rs. 25.00/cum
The rate is inclusive of Royalty Charges, cess on Royalty and compensation for earth for land owned/arranged by the contractor.
Royalty payment certificate in original from competent Authority are to be produced alongwith the bill, otherwise amount due towards Royalty @Rs. 29.00/cum. and cess on Royalty @ Rs. 5.30/ Cum will be deducted from bills of works.
N.B.: Measurement to be taken on the basis of stack measurement/pre-post work ection measurement and deduction of void as per norms. No extra payment will be made for stacking. (A) Beyond 500 m and upto 1.00 km. | 1,059 | Cum | 330.48 | ₹3,49,978.32 |
| 2 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). | 528 | Mtr | 34.56 | ₹18,247.68 |
| 3 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.
(a) Where boats are not necessary. | 312 | Mtr | 13.11 | ₹4,090.32 |
| 4 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc, all complete (capacity 50 kg). | 2,357 | Each | 7.15 | ₹16,852.55 |
| 5 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone/brick) and sewing as done in case of cement bags (tying with a knot after filling will not be accepted), and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/bag. | 2,357 | Each Bag | 8.34 | ₹19,657.38 |
| 6 | Extra rate for item no 5 for each additional lead of 60 metre or part thereof beyond the initial lead of 30 metre. (i) Three extra lead | 2,357 | Each Bag | 10.73 | ₹25,290.61 |
| 7 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | 2,357 | Each Bag | 3.58 | ₹8,438.06 |
| 8 | Supplying Jhaw/Eucalyptus bullah piles at work site, including dressing and making one end pointed
(i) 12.50 cm av. Diameter. | 879 | Mtr | 172.81 | ₹1,51,899.99 |
| 9 | Labour for driving Jhaw/Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
(i) 12.50 cm av. diameter. | 697.79 | Mtr | 109.65 | ₹76,512.67 |
| 10 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.
Width of thinner end above 10 cm. and less than 15 cm.
Jhaw/Eucalyptus. | 354 | Mtr | 123.95 | ₹43,878.3 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_2526579.xls
BOQ • 0.33 MB
2911.pdf
Tender Documents • 0.98 MB
Additional.pdf
Additional Documents • 2.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .