| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.9 LAccepted-AOC | ₹63.9 L | L1 | Accepted-AOC Due to lowest rate |
| 2 | L2₹67.5 LRejected-Finance | ₹67.5 L | L2 | Rejected-Finance Due to highest rate |
| 3 | L3₹85.0 LRejected-Finance | ₹85.0 L | L3 | Rejected-Finance Due to highest rate |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | ABHINAV PATHANIA L3 | sunil balouria govt contractor L2 | AJAY PATHANIA L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in drain and chenal .in classification of all kinds of soil such as pick work, spade, jumper work, blasting work soft /hard rock, chiesling soft /hard rock lift upto 1.50 metres stacking the excavated soil with 15cm layer when required into plinth ,sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus earth as per direction of Engineer-in-Charge with in all leads and lifts | 710.98 | Cum | 527 ₹3.7 L | 33 ₹23,462.34 | 60 ₹42,658.80 |
| 2.00 | Providing and laying cement concrete 1:4:8(1 cement: 4sand: 8graded stone agg.40mm nominal size) and curing complete excluding cost of form work in foundation and plinth with in all leads and lifts. | 207.86 | Cum | 4,027 ₹8.4 L | 4,400 ₹9.1 L | 4,950 ₹10.3 L |
| 3.00 | providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish i/c centring, shuttering,strutting and propping etc. with wooden batten and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs.height of propping and centring below supporting removal of the same for insitu work in:- RCC duct kuhl both side shuttering with steel plates complete with in all leads and lifts. | 5,105.68 | Sqmt. | 237 ₹12.1 L | 55 ₹2.8 L | 70 ₹3.6 L |
| 4.00 | P/L C.C. 1:2:4(1 cement: 2sand: 4graded stone agg.40mm nominal size)and curing complete excluding the cost of form work and reinforcement work for rainforcement cement concerete work in :-Foundation, footing bases of columns and the like and mass concrete wall (and thickness but not less than 0.1 mtrs thicknes) attached pillers butteresses plinth and string sources etc. within all leads and lifts. | 595.46 | cum | 7,027 ₹41.8 L | 6,600 ₹39.3 L | 5,499 ₹32.7 L |
| 5.00 | Providing tor /mild steel reinforcement for RCC work i/c bending,binding and placing in position complete upto floor two level within all leads and lifts(Tor steel). | 20,847.75 | Kgs. | 91 ₹19.0 L | 77 ₹16.1 L | 80.99 ₹16.9 L |
Tender Value
₹75.3 L
EMD Value
₹1.1 L
Closing Date
12 Dec 2025, 11:00 amClosed
Executive Engineer
Jal Shakti Division Shahpur
C/O FIS Bhadodar Kuhl in Tehsil Shahpur, Distt, Kangra, (HP)
2025_HPIPH_122484_1
EE/JSDS/NIT/2025- 7833-82 dated- 03/12/2025
Open Tender
Civil Works
180 days
Shahpur
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,000
Executive Engineer
₹1.1 L
5 Feb 2026
3 Dec 2025
12 Dec 2025
3 Dec 2025
12 Dec 2025
3 Dec 2025
3 Dec 2025 - 12 Dec 2025
Excavation in drain and chenal .in classification of all kinds of soil such as pick work, spade, jumper work, blasting work soft /hard rock, chiesling soft /hard rock lift upto 1.50 metres stacking the excavated soil with 15cm layer when required into plinth ,sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus earth as per direction of Engineer-in-Charge with in all leads and lifts
Providing and laying cement concrete 1:4:8(1 cement: 4sand: 8graded stone agg.40mm nominal size) and curing complete excluding cost of form work in foundation and plinth with in all leads and lifts.
providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish i/c centring, shuttering,strutting and propping etc. with wooden batten and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs.height of propping and centring below supporting removal of the same for insitu work in:- RCC duct kuhl both side shuttering with steel plates complete with in all leads and lifts.
P/L C.C. 1:2:4(1 cement: 2sand: 4graded stone agg.40mm nominal size)and curing complete excluding the cost of form work and reinforcement work for rainforcement cement concerete work in :-Foundation, footing bases of columns and the like and mass concrete wall (and thickness but not less than 0.1 mtrs thicknes) attached pillers butteresses plinth and string sources etc. within all leads and lifts.
Providing tor /mild steel reinforcement for RCC work i/c bending,binding and placing in position complete upto floor two level within all leads and lifts(Tor steel).
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
Form6and8.pdf
Tender Documents • 0.82 MB
Termsandconditions.pdf
Tender Documents • 0.28 MB
BOQ_179725.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid