Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.4 L+₹28,323.94 (3.99%)Admitted-Fee/PreQual/Technical/Finance | ₹7.4 L+₹28,323.94 (3.99%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.6 L+₹45,674.08 (6.43%)Admitted-Fee/PreQual/Technical/Finance | ₹7.6 L+₹45,674.08 (6.43%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.7 L+₹57,530.43 (8.10%)Admitted-Fee/PreQual/Technical/Finance | ₹7.7 L+₹57,530.43 (8.10%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | BHARATH INFRASTRUCTURE DEVELOPERS L4 | Kadavil Constructions L1 | Devadut S P L2 | JOSEMON THOMAS L3 |
|---|---|---|---|---|---|---|---|
| 1.00school Maintenance | |||||||
| 1.00 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 181.24 | sqm | 196.51 ₹35,615.08 | 181.79 ₹32,947.26 | 50 ₹9,061.9 Lowest | 193.48 ₹35,065.93 |
| 1.00 | 15.14.1:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above | 5.2 | cum | 4,170.1 ₹21,680.35 | 3,857.69 ₹20,056.13 | 2,500 ₹12,997.5 Lowest | 4,105.6 ₹21,345.01 |
| 1.00 | 15.57:Dismantling aluminium / Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by Engineer - in-Charge | 206.72 | sqm | 52.8 ₹10,914.97 | 48.84 ₹10,096.35 | 10 ₹2,067.23 Lowest | 51.99 ₹10,747.53 |
| 1.00 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 1,527.66 | kg | 169.28 ₹2,58,602.28 | 156.6 ₹2,39,231.56 Lowest | 185 ₹2,82,617.1 | 166.67 ₹2,54,615.09 |
| 1.00 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 1,787.1 | kg | 208.99 ₹3,73,484.98 | 193.33 ₹3,45,499.08 Lowest | 200 ₹3,57,419 | 205.76 ₹3,67,712.67 |
| 1.01 | OD25899/2026-2027:Roofing with Departmental mangalor tiles stacked at yard or nearest areas including
conveyance labor charges etc. complete. | 90.62 | sqm | 188.81 ₹17,109.77 | 174.67 ₹15,828.42 Lowest | 208 ₹18,848.75 | 185.89 ₹16,845.17 |
| 1.01 | 12.48:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately) | 90.62 | sqm | 393.39 ₹35,648.61 | 363.92 ₹32,978.07 Lowest | 434 ₹39,328.65 | 387.31 ₹35,097.64 |
| 1.01 | 50.14.1.1:Removing and refixing door shutters after necessary repairs for easy opening and closing etc complete as per the direction of site Engineer-in-charge. | 7 | each | 424.57 ₹2,971.99 | 392.76 ₹2,749.32 Lowest | 469 ₹3,283 | 418.01 ₹2,926.07 |
| 1.01 | 50.14.1.2:Removing and refixing window shutters after necessary repairs for easy opening and closing etc complete as per the direction of site Engineer-in-charge | 17 | each | 300.93 ₹5,115.81 | 278.39 ₹4,732.63 Lowest | 332 ₹5,644 | 296.28 ₹5,036.76 |
Tender Value
₹8.5 L
EMD Value
₹21,213
Closing Date
10 Aug 2026, 6:00 pmClosed
Assistant Engineer
LIDEW Section Kumarakom GP
Annual Plan-Maintenance of ABM School-Project No-384-General Civil Work
2026_LSGD_863685_10
01/AE/LIDEW/KGP/26-27
Open Tender
Civil Works - Buildings
Item Rate
Kumarakom GP
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,875
Yes
₹21,213
Yes
14 Aug 2026
3 Aug 2026
13 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1school Maintenance | |||||
| 1.001 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 0.2 | sqm | - | - |
| 1.002 | 15.14.1:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above | 1 | cum | - | - |
| 1.003 | 15.57:Dismantling aluminium / Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by Engineer - in-Charge | 0.2 | sqm | - | - |
| 1.004 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | - | kg | - | - |
| 1.005 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | - | kg | - | - |
| 1.006 | OD25899/2026-2027:Roofing with Departmental mangalor tiles stacked at yard or nearest areas including
conveyance labor charges etc. complete. | 0.6 | sqm | - | - |
| 1.007 | 12.48:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately) | 0.6 | sqm | - | - |
| 1.008 | 50.14.1.1:Removing and refixing door shutters after necessary repairs for easy opening and closing etc complete as per the direction of site Engineer-in-charge. | - | each | - | - |
| 1.009 | 50.14.1.2:Removing and refixing window shutters after necessary repairs for easy opening and closing etc complete as per the direction of site Engineer-in-charge | - | each | - | - |
stage.html
html • 0.02 MB
finance_1461295.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
SBD384.pdf
Tender Documents • 1.90 MB
BOQ_1461295.xls
BOQ • 0.30 MB
TENDERDOCUMENT_affidavit.pdf
Other Document • 0.20 MB
TENDERDOCUMENT_epaymentform.pdf
Other Document • 0.05 MB
TENDERDOCUMENT_FormOfTender.pdf
Other Document • 0.02 MB
TENDERDOCUMENT_integrity.pdf
Other Document • 0.17 MB
TENDERDOCUMENT_NITDeclaration.pdf
Other Document • 0.02 MB
TENDERDOCUMENT_PreliminaryAgreement.pdf
Other Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .