Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 LAccepted-AOC | 1 | Accepted-AOC lowest rate quoted bidder | |
| 2 | Rejected-Technical | - | Rejected-Technical Rate Quoted is more than that of lowest bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical Rate Quoted is more than that of lowest bidder | |
| 4 | Rejected-Technical | - | Rejected-Technical Rate Quoted is more than that of lowest bidder |
Tender Value
₹6.3 L
EMD Value
₹15,700
Closing Date
24 Jul 2020, 5:00 pmClosed
Assistant Executive engineer
Assistant Executive engineer Kuttanad Development Sub Division (MI Sub division) 1st Floor Mini Civil Station Cherthala 688524
Desilting of thodu
2020_Irrig_372149_1
4/AEE/KDSNC/2020-21
Open Tender
Civil Works - Others
Item Rate
120 days
Arookutty
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,300
online
₹15,700
27 Aug 2020
16 Jul 2020
28 Jul 2020
16 Jul 2020
24 Jul 2020
16 Jul 2020
16 Jul 2020 - 23 Jul 2020
Amount
SCHEME-1 -DESILTING
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od7950/2020_2021/KP : Earth work in excavation by mechanical means (hydraulic excavator )/ manual means over areas ( exceeding 30 cm in depth ,1.5 m in width as well as 10 sqm on plan) including lead up to 50 m and lift up to 1.5 m and forming bunds on both banks using excavated earth to be levelled and neatly dressed (2.6+ 20% for under water ) for all kinds of soil details of cost for 10 cum average out put of hydraulic excavator per hour =30 cum < hr> MACHINERY
SCHEME-2-DESILTING
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od9467/2020_2021/KP : Earth work in excavation by mechanicl means(hydraulic excavator ) manual means over areas ( exceeding 30 cm in depth ,1.5 m in width as well as 10 sqm on plan including lead up to 50 m and lift up to 1.5 m and forming bunds on both banks using excavated earth to be leveled and neatly dressed (2.6+ 20% for under water ) for all kinds of soil details of cost for 10 cum average out put of hydraulic excavator per hour =30 cum < br> MACHINERY
SCHEME-3-DESILTING
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od9467/2020_2021/KP : Earth work in excavation by mechanicl means(hydraulic excavator ) manual means over areas ( exceeding 30 cm in depth ,1.5 m in width as well as 10 sqm on plan including lead up to 50 m and lift up to 1.5 m and forming bunds on both banks using excavated earth to be leveled and neatly dressed (2.6+ 20% for under water ) for all kinds of soil details of cost for 10 cum average out put of hydraulic excavator per hour =30 cum < br> MACHINERY
SCHEME-4-DESILTING
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od9467/2020_2021/KP : Earth work in excavation by mechanicl means(hydraulic excavator ) manual means over areas ( exceeding 30 cm in depth ,1.5 m in width as well as 10 sqm on plan including lead up to 50 m and lift up to 1.5 m and forming bunds on both banks using excavated earth to be leveled and neatly dressed (2.6+ 20% for under water ) for all kinds of soil details of cost for 10 cum average out put of hydraulic excavator per hour =30 cum < br> MACHINERY
SCHEME-5-DESILTING
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od9467/2020_2021/KP : Earth work in excavation by mechanicl means(hydraulic excavator ) manual means over areas ( exceeding 30 cm in depth ,1.5 m in width as well as 10 sqm on plan including lead up to 50 m and lift up to 1.5 m and forming bunds on both banks using excavated earth to be leveled and neatly dressed (2.6+ 20% for under water ) for all kinds of soil details of cost for 10 cum average out put of hydraulic excavator per hour =30 cum < br> MACHINERY
ELDHOSE K PAUL
SAJU P MAKKAR
GEORGE T J
Bidder Name
SUNIL M
SAJU P MAKKAR
GEORGE T J
ELDHOSE K PAUL
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_526960.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .