Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
7 Apr 2026, 6:00 pmClosed
Assistant Manager (South West Zone)
Making New Central Verge and Footpath for the year 2026-27 at different Roads in Sarkhej Ward SWZ.
290943
21/2025-26 (28)
Open
Civil - All
Ahmedabad
3 documents required · 3 mandatory
₹3,600
Municipal Commissioner, Ahmedabad
₹1.5 L
27 Mar 2026
27 Mar 2026
27 Mar 2026
7 Apr 2026
27 Mar 2026
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it, specifications
shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of work is in the
form of a designation containing the number of the specification of the material and prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve the
contractor from the responsibility of replacing defective material brought on site or materials used in the
work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
23. Collection of approved materials shall be done at site of work in a systematic manner. Materials shall be
stone at site of work in a systematic manner. Materials shall be stored in such a manner as to prevent
damage, deterioration or intrusion of foreign matter and to-ensure the preservation of their quality and
fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from the site of
work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient numbers and in
good working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the particular item.
27. All tools, templates, machinery and equipment for correct execution of the work as well as for checking
lines, levels, alignment of the works during execution shall be kept in sufficient numbers and in good
working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or over loading
of the various components of the structure during execution or after completion of the structure.
29. All necessary safety measures and precaution (including those laid down in the various relevant Indian
Standards) shall be taken to ensure the safety of men, materials and machinery on the works as also of the
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one percent towards
testing charges is separately made.
31. The tenderer is required to check the web site for Addendum if any, before 48 hours of tender submission
date and time. The tenderer who quotes the tender without attaching the addendum will be rejected.
32. As per City Engineer’s circular no.-6/2011-12 Dt.24.6.2011 all terms & conditions will be applied.
33. Contractor has to follow Planning Department Circular No 10 Dt. 07/09/2018 strictly.
34. As per AMC’s Finance department circular no.38/ Dt.21/11/022 and approval of competent authority, rate of
all the items are taken without GST and prevailing GST will be payable.
35. All the relevant prevailing AMC circulars/ its time to time revisions are applicable for this work and all the
bidders are bound to follow the same, so the bidder must check before applying for the tender.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar days (120) from
opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall furnish to the
Corporation Security Deposit of 5% (Five percent) of the contract price Cheque or Bank Guarantee, pay
order, or demand draft of Nationalized Banks and Schedule Banks only.
Contractor's Signature Dy.C.E.-1
& Stamp (South West Zone)
bu.Bgwrl.frb§h©e, ybœtJtœ Bgwrl. ftuvtuhuNllt mhfgwjh lk.-81, <t.26.02.2015 bwsc <btb «fthle
fLmx[fNlle yufxeJexebtk bwÏg ftuLx[tfxh,mc ftuLx[tfxhlt su bswhtu ftbdehe fh<t ntug <u <btb bswhtulwk dwsht<
rcÕzekd yuLz y^h fLmx[fNl Jfombtk hSMx[uNl fhtJJwk VhSgt< Au.
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 Month(Excluding Monsoon Period) after the order to start the works.
Progress of work should be in proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The contractor shall
arrange for barricading at night and arrangement of Pagi at night to direct the traffic. He shall be responsible for
any damage to public, If any incident happen, during the execution of work. In case of dispute for unseen or
overlooked items the decision of the Dy.City Engineer shall be final. The contractor shall have to give site clean
of all rubbish during the work and at the time of completion of work and hand over the site with final finishing of
the work as directed. All the rejected materials shall be removed from site within 24 hours by contractor at this
risk and cost. Debris shall have to cart daily from site.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he
shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not
available in SOR than based on current market rates. In case of extra item decision of Add. City Engg. shall
remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work
the contractor shall carry out the same at his quoted rates without charges any extra and the contractor will
have to carry out the works and he will be paid at the rate quoted by him. No claim for extra rate for subsequent
changes in site and design is entertained.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully
responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed the to
The tender for the work shall remain open for a period (120) days from the date of opening of the tenders for
this work and that the tenderer shall not be allowed to withdraw on modify the offer on his own during the
period. If any tenderer withdraw or makes any modifications or addition in the terms and conditions of his tender
not acceptable to the Municipal Corporation the Municipal Corporation shall without prejudice to any right or
remedy be at liberty to forfeit in full the said earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work the penalty of
Rs.- ( As per Form - B1) per day of delay shall be recovered from the immediate bills payable to the contractor.
Contractor has to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of demand
draft or in cash.
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form B1
can be is available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat booklets of
Building Works & and Road Works Specifications published by Gujarat Book Depot, Sector-21.
Contractor's Signature Dy.C.E.-1
& Stamp (South West Zone)
DETAILS OF BANK ACCOUT
1 Contractor's name
3 Telephone/ mobile no.
4 Permanent account no. (PAN no.)
5 Name of the bank
6 Branch name and address
11 Contractor/ supplier's
signature and stamp
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
PERCENTAGE RATE TENDER AND CONTRACT FOR WORKS ADDITIONAL INSTRUCTIONS TO PERSONS
1. Competency of Tendered: No contract will be awarded except to responsible bidder capable for
performing the class of work completed. Before the award of the contract, any bidder may be required
to show that he has the necessary facilities, experience, ability and financial resources to perform the
work in satisfactory manner within the time stipulated. Contractor may be required to furnish the
department with the statement as to their experience and their financial status.
2. Tenderer will be deemed to have inspected the site and to have satisfied himself as to the nature of all
works, all existing roads water - way and other means of communication and access to and from the
site of work and the building that may be required for temporary purpose in connection with the
construction, completion and maintenance fo the works and must make his own enquiries as to work
yard, sites, depot and dumps and as to the acquisition of such additional sites and areas as may be
necessary for temporary purpose for constructing, completing and maintaining the works.
3. Payment: - The tenderer must understand clearly the rates quoted are for completed works and include all
cost due to labour, scaffolding plant, supervision, service work, power, royalties and octroi etc. and include
all extras to cover the cost of night work if an when required. No claim for additional payment beyond the
prices or rates quoted will be entertained and the tender will not be entitled subsequently to make may claim
on the ground of misrepresentation or on the ground that he was supplied with information given by any
person (whether the member is the employee of Engineering Department of Corporation or not). Any failure
on his part to obtain all necessary information for the purpose of making his tender and filling the several
prices and rates therein shall not relieve him from any risks or liabilities arising out o, or consequent upon
the submission of the tender.
4. Tender Forms: - the tenderer must fill up every blank in the form of tender and in the schedule and he must
return the documents sent here with.
5. Erasures: - Persons tendering are informed that no erasures of alternations by them in the text of the
documents sent herewith will be allowed and any such erasures or alternations will be disregarded. If there
is any error in writing no over-writing should be done, the wrong words or a figure should be struck out and
the correct one written above or near it in unambiguous way, each correction should be initialed.
CONTRACTORS TO PLEASE READ THIS CAREFULLY
1. The rate for items must be given in words and figures. Amount of each item must also be entered in columns
and the tenderer must strike out grand total of the amount.
and the tenderer must strike out grand total of the amount.
2. If the tender is taken in favor of the company, a power of attorney in favour of the person who may have
signed the tender for the company must accompany the tender.
3. Solvency Certificate of a Bank or a Revenue Officer of an amount upto 20% of the tendered cost plus the
amount of works on hand still to be executed will have to be reduced by the Contractor.
4. Challan for earnest money must accompany the tender. Tenderer may pay earnest money in the form of
CROSSED Demand Draft in favour of the Municipal Commissioner of Municipal Corporation, Ahmedabad.
Earnest money in cash or by cheque shall not be accepted.
5. The Contractor shall have to furnish Income Tax Clearance Certificate before tender is accepted and
intimate assessment number and ward under which is assessed.
6. Copies of certificate as regards previous experience if any must accompany the tender.
7. Declaration showing all works on hand with the Contractor and the value of works that remain to be
executed in each case must accompany tender.
8. All pages should be initial
9. The Contractor should initial all corrections, erasures and over writing.
10. Discrepancies and Adjustment of Errors: Any error in quantity or amount in schedule 'B' showing items of
works to be carried out shall be adjusted in accordance with the following rules :
(a) In the event of a discrepancy between description in words and figures quoted by a tenderer in the
'rates' column, the description in words shall prevail.
(b) In the event of an error occurring in the 'amount' column of the schedule 'B' showing items of work, as a
result of wrong multiplication of the unit- rate and quantity, the units - rate shall be regarded as firm and
multiplication shall be amended on the basis of the rates.
(c) All errors in totaling in amount column and in carry forward totals shall be corrected.
(d) Any rounding off of amounts against 'items' or 'totals' shall be ignored.
11. (i) It any please be noted that tender will be considered as invalid especially, if the requirements as per
instruction. No. 1 to 10 above is not complied with before submitting the tender. Also please read
carefully the face-sheet and General Rules and Directions for the guidance of Contractors of this form.
(ii) Right is reserved to reject any or all tender (s) without assigning any reason(s) thereof.
10A. The tender will be liable to be rejected out tight if the tenderer has filed in tender documents by ball pen
instead in ink.
11. In addition to the above the tender will also be liable to be rejected outright if
(i) The tenderer proposes any alternation in the works specified or in the time allowed for carrying the work
or any condition or correction made in any code or mode of schedule 'B' or specifications.
(ii) Any of the page / pages of the tender is / are removed or replaced.
(iii) The tenderer does not initial all corrections, additions or pasted slips.
(iv) He makes any erasure in the tender. And
(v) The tenderer or in the case of a firm, each partner or the person holding the power of attorney there of
does not sign or the signatures is / are not attested by a witness the tender in the space provided for the
12. A certificate of registration as approved Contractor should be attached with the tender.
12A. In respect of the tenders from the Co-operative Society, a solvency, certificate of an amount equal to
20% of the amount of the work put to tender will have to be produced along with the tender or a certificate
regarding the borrowing capacity of the society issued by the Legal Assistant, Directorate Cottage
industries will have to be produced along with the tender.
13. (1) The several documents forming the contract are the essential parts of the contract a requirement
occurring in one is as binding as though occurring in all they are intended to be mutually explanatory and
complementary and to described and provide for a complete work.
(2) In the event of any discrepancy, the several documents forming the contract or in any one document the
following order or precedence should apply:
(a) Dimension and quantities: -
(i) Schedule 'B' of the tender form.
(ii) Specification.
On drawing, figured, dimensions, unless obviously, incorrect will be followed in
preference to scaled dimension.
(b) Description:
(i) Schedule 'B' of the tender form.
(ii) Specifications.
In case of defective description or ambiguity, the Engineer-in-Charge should issue further instructions
directing in what manner the work is to be carried out, it being understood that the best modern practice is to
be followed. The Contractor should forthwith comply with such instructions.
14. The Contractor should take no advantage of any apparent error or omission in drawings or specifications
and the Engineer-in-Charge shall make such corrections and interpretations as necessary to fulfill the intent
of the plants and specification.
15. All the materials to be used in the work may be from time to time subject to tests as per relevant I.S. as
decided by the Engineer .
16. The board stating the detailed specifications and details of work as per Current circular of AMC/Government
Circular No.TNC-1090-24-S, Dated 17-08-2002, should be erected as directed on the site of work by the
contractor without claiming extra for the same.
17. Action in case of disproportionate progress:
In case of extremely poor progress of the work or any item at any stage of work which in the opinion of the
Engineer, cannot be made good by the contractor considering his available resources, the Engineer will get
it accelerated to make up the lost time through any other agency and recover the additional cost incurred, if
any, in getting the work done from the contractor after informing him in writing about the action envisaged by
him. The action may include blacklisting of the contractor based on the works and severity and decision of
Municipal Commissioner shall be binding in this condition.
Contractor's Signature Dy.C.E.-1
& Stamp (South West Zone)
Name of work: - Making New Central Verge and Footpath for the year 2026-27 at different Roads in Sarkhej
DECLARATION FORM
1. I/We hereby declare that I/We have visited the and fully acquainted myself / ourselves with the local
regarding materials, labour and other factors pertaining to the work before submitting this tender.
2. I/We hereby declare that I/We have carefully studied the conditions of contract, specification and other
tender documents of this work and agree to execute the same accordingly.
Signature of the Contractor
GENERAL RULES AND DIRECTION FOR THE GUIDANCE OF CONTRACTORS :
1. All works proposed to be executed by contract shall be notified in a form of invitation to tender pasted
on a board hung up in the Addl. City Engineer and signed by the Addl. City Engineer. This form will
state the work to be carried out, as well as the date for submitting and opening tenders and the time
allowed for carrying out the work, also the amount of earnest money to be deposited with the tender
and the amount of the security deposit to be paid by the successful tenderer and the percentage, if any,
to be ducted form bills, it will also state whether a refund of quarry fees, royalties, octroi dues and
ground-rent will he granted, copies of the specifications designs and drawings and estimated rates,
scheduled rates and any other documents required in connection with also be open for inspection by
Contractors at the office of the Addl. City Engineer during office hours. Where the works are proposed
to be executed according to the specifications recommended by a Contractor and approved by a
competent authority on behalf of the Municipal Corporation such specification with designs and
drawings shall form part of the accepted tender.
2. In the event of the tender being submitted by a firm, it must be signed on his behalf by a person holding
a power-of-attorney authorizing him to do so.
3. Receipts for payments made on account of any work, when executed by firm, shall also be signed by
all the partners, except where the Contractors are described in their tender as a firm, in which case the
receipt shall be signed in the name of the firm by one of the partners or by some other person having
authority to give effectual receipt for the firm.
4. Any person who submits a tender, shall fill up the usual printed form including the 'column' total
according to estimated quantities, stating at what rate he is willing to undertake each item of the work,
Tenders which purpose any alteration in the works specified in the said form of invitation to tender or in
the time allowed for carrying out the work or which contain any other conditions of any sort, will liable to
rejection. No single tender include more than one work, but Contractors who wish to tender for two or
more works, shall submit a separate tender for each. Tenders. shall have the name and the number of
the work (to which they refer) written outside the envelope.
5. The Addl. City Engineer or his duly authorized Assistant shall open tenders in the presence of any
intending Contractors who have submitted tenders or their representatives who may be present at the
time and he will enter the amounts of the several tenders in a comparative statement in a suitable form.
In the event of a tender being accepted, the Contractor, shall thereupon for the purpose of
identification, sign copies of the specifications and other documents mentioned in this tender in the
event of a tender being accepted the contractor, shall thereupon for the purpose of indification, sign
copies of the specifications and other documents mentioned in this tender in the event of a tender
being rejected, the Municipal Commissioner shall authorize the officer concerned to refund the amount
of the earnest money deposited to the Contractor making the tender on his giving a receipt for the
return of the money.
6. The officer competent the dispose of the tenders shall have the right of rejecting all or any of the
7. No receipt for any payment alleged to have been made by a Contractor in regard to any matter relating
to this tender or the contract shall be valid and binding on Municipal Corporation unless it is signed by
the Addl. City Engineer.
8. The memorandum of work to be tendered for any schedule of materials to the supplied by the Municipal
Corporation and their rates shall be filled in and completed by the office of the Addl. City Engineer
before the tender form is issued. If a form issued to an intending tenders has not been so filled in and
completed, he shall request the said office to have this done before he completes and delivers his
9. All works shall be measured not be standard measure and according to the rules and customs of the
Municipal Corporation without reference to any local custom.
10. Under no circumstances shall any Contractor be entitled to claim enhanced rates for any item in this
11. Every Contractor shall, unless exempted in writing by the Addl. City Engineer concerned, produce
along with this tender, a solvency certificate of his financial stability from the collector of the District
within which he resides or a Bank's his certificate. If he fails to produce such a certificate his tender will
not be considered.
12. All corrections and additions or pasted slips should be initialed.
13. All measurement of work will be taken according to the usual method in use in the Municipal
Corporation and as per I.S. code for general practice and no proposals to adopt alternative methods
will be accepted. The Addl. City Engineer's decision as to what is 'the usual method in use in the
Municipal Corporation' will be final.
14. The Contractor shall have to attach to his tender, Income-Tax Clearance certificate to be obtained from
the Income-Tax Officer.
15. The Contractor will have to construct a shed for a storing controlled and valuable materials issued to
him under schedule A' of the agreement at work-site having double locking arrangement. The materials
will then be taken for use in the presence of the Departmental person. No. Material will be allowed to be
removed form the site of work.
16. No foreign exchange will be released by the Department for the purpose of plant and machinery
required for the execution of the work contracted for.
17. Controlled materials (Essentially Certificate)
(i) As regards controlled materials, the Municipal Corporation will help to arrange for the permit as
far as possible and help the Contractor in securing the same. All incidental charges met with in
procuring these materials shall be borne by the Contractor himself. Though the Municipal
Corporation will help to arrange for the permit as far as possible and help the Contractor in
obtaining materials, it shall not accept any responsibility for any delay or loss on account of
delay caused to the contractor while obtaining the same.
(ii) The contractor shall submit to. Addl. City Engineer on close of every calendar month, the
monthly returns in the prescribed forms as to the receipts and actual use of the controlled
materials during the month.
(iii) The Contractor shall permit the Addl. City Engineer or his representatives to inspect the stock
of the controlled materials stored by him at any time whenever the Addl. City Engineer or his
representative(s) so desire (s).
18. The tender for the work shall remain open for a period of (120 days) from the date of opening of the
tenders for this work and the tenderer shall not be allowed to withdraw of modify the offer on his own
during this period. If any tenderer withdraws or marks any modifications or additions in the terms and
conditions of his tender, not acceptable to the Municipal Corporation, then Municipal Corporation shall,
without prejudice to any right or remedy, be at liberty to forfeit in full the said earnest money.
19. The Contractor shall employ only such labour that shall produce a valid certificate of having been
vaccinated against small - pox within a period of last three years.
TENDER FOR WORKS.
I/We hereby tender for the execution for the Municipal * In Figures as well in words.
Corporation of Ahmedabad (herein before and herein
after referred to as 'Corporation') of the work specified in
the under written memorandum within the time specified
in such memorandum at *
…………………………………... Percent below /
above the estimated rates specified schedule 'B'
(memorandum showing item of works to be carried out)
and in accordance in all respects with the specifications,
designs, drawings and instructions in writing referred to in
this tender and in Clause 13 of the annexed conditions of
contract and agree that when materials for the work are
provided by Corporation, such materials and the rates to
be paid for them shall be as provided in schedule 'A'
(a)General Description Making New Central Verge (a) If several sub works are included the
and Footpath for the year 2026-27 at different Roads should be detailed in a separate list. The
in Sarkhej Ward SWZ. amount of earnest money to be deposited
shall be in accordance with instruction no.
(b) Estimate Cost: Rs.
(c) Earnest Money: 1% of the estimated amount of
tendered work. Rs.49,504.00
(D) SECURITY DEPOSIT
(i) 5% of the contract value cost paid in cash if the contract value is less than Rs. 5000/-
(ii) (a) 1% of the estimated cost paid as earnest money along with the tender.
(b) Security Deposit is equal to 5% of the sectioned tender cost in form DD or Bank Guarantee.
(iii) Bank Guarantee from a Nationalized Bank or Bank approved by the Municipal Corporation for an
amount equal to 5% of sectioned tender cost
Note – 1. All work shall be carried out as per Public Works Department Handbook and other specifications of
Ahmedabad Municipal Corporation or as directed.
Note – 2. Rates quoted include clearance of site (prior of commencement of work and at its close) in all
respects and hold good for work under all condition, site moisture weather etc
Contractor's Signature Dy.C.E.-1
& Stamp (South West Zone)
Tender Fee : Rs 3600.00 Date of submission : 07.04.2026 Time: :18:00 Hrs
Earnest Money : Rs. 1,49,460.00 Date of Opening : 08.04.2026 Time: 17:00 Hrs
Contractor’s Name & Address :
AMDAVAD MUNICIPAL CORPORATION
South West Zone- Engineering Department
Name of work :- Making New Central Verge and Footpath for the year 2026-27 at different Roads in Sarkhej Ward
QTY. ITEM RATE PER AMOUNT
Box cutting the road surface to proper slope and
camber for making a base for road work including
1 2760 removing the excavated stuff and depositing on the 205.35 Cmt
road side slope as directed upto 50Mt.lead.
CONVEYANCE CHARGES-FOR DIFFERENT TYPES OF
MATERIALS (A) lime murrum building rubbish earth
2 manure or sludge & execavated rock and rubbish
[Lime murrum building rubbish]
a 1 a) Lead up to 1 Km. 256.16 Cmt.
b 1 b) Lead From 1Km to 2 Km. 278.18 Cmt.
c 11 c) Lead From 2 Km to 3 Km. 296.43 Cmt.
d 2760 d) Lead From 3 Km to 4 Km. 312.45 Cmt.
e 10 e) Lead From 4 Km to 5 Km. 326.73 Cmt.
Providing and laying cement concrete 1:5:10 (1-
Cement : 5- Coarse sand : 10- hand broken stone
3 845 aggregates 40 mm nominal size) and curing complete 2492.51 Cmt.
excluding cost of formwork in (A)Foundation and
Dismantling the following including loading,
unloading and disposal of unserviceable material for
4 all lead or as directed by Engineer-In-Charge and
stacking the serviceable material and backfilling the
resulting trenches and pits complete.
a 200 central verge -kerb stone (AMC sor) 8.00 No
Dismantling tiled or stone floors laid in mortar
including stacking of serviceable material and
b 250 disposal of uservicalble material with all lead and 47.25 cmt
lifts.(R&B SOR 2023-24-Ahmedabadcity, ITEM
CODE 20005 Item no.as per NBO 20.23)
Demolition & disposal of unservisable material with
c 50 all lead and lift for unreinforeced concrete. (AMC 603.23 cmt
Demolition of brick work & stone masonry including
stacking of serviceable materials and disposal of
d 10 unserviceable materials with all lead and lift (1) In 544.95 cmt
cement mortar.(R&B SOR 2023-24,Ahmedabadcity,
ITEM CODE 20003B Item no.as per NBO 20.11)
Demolition including stacking of serviceable
materials and disposal of unserviceable materials
e 1 with all lead and lift. (I) R.C.C work.(R&B SOR 2023- 1047.38 cmt
24,Ahmedabadcity,ITEM CODE 20002 Item no.as per
Extra rate over item of excavation of earth for
excavation of asphalt pavement / RCC of thickness
up to 0.20 meter including demolishing the asphalt
carpet, metal,s oiling/cutting Reinforcement
etc.comp. with stacking the material as directed.
(Based on Previously approved rate by C E sir )
A 200.00 up to 0.20 meter thickness (By Manual) 71.10 Smt
B 0.20 to 0.30 meter (By any type of Breaker Machine
or R.C.C.Cutter machine including cost of operator, 177.76 Smt
80.00 fuel, & transportation etc complete.
C 0.30 meter & above (By any type of Breaker Machine
or R.C.C.Cutter machine including cost of operator, 311.08 Smt
10.00 fuel, & transportation etc complete.
Providing and laying Cement Concrete 1:3:6 (1-
Cement : 3-Coarse sand : 6-Hand broken stone
6 85.00 aggregates 40mm nominal size) and curing 2976.00 Cmt
complete.excluding cost of form work
in(A)Foundation & plinth
Providing and Laying of Rubber Moulded Paver Block
Grey/Coloured 60 mm thick, M-35 Grade of any
size;shape (Usually Uni-Paver Blocks) using black trap
good quality aggragate of 20 mm nominal size for
footpath, parking areas, service lanes and other
areas as mentioned in the drawing/instruction of
engineer in charge. Cost includes formworks using
rubber mould, Rate providing and laying paver
blocks as per required grading and specification. The
paver block shall be mechanically compacted. The
7 6000.00 work of paving blocks shall be executed in line and 501.60 Smt
level by skill mason of flooring work only. It should
be laid in such a way that the no cutting of the paver
block to be necessary. if cutting of paver block
necessary then it should be cut by machine only and
carting. The finished surface of the paver block shall
have resonably good, plain finished. Paver blocks
shall be compacted and shall be relaid if necessary.
Gravel or such type of materials shall not be allowed
for production. Laying on 5cms thick sand
Paver Block Providing and laying shot
blasted Non - interlocking, Paver blocks of
specified thickness, size, grade of concrete
and colour machine made and blasting by
automatic shot blasting machine and high
density of as per approved sample of
approved make for footpath, parking areas,
service lanes,cross over and other areas as
mentioned in the drawing. Including
providing and laying 50 mm thick averave
bedding layer of coarse sand below paver
block as per required grading and
specification. Laid paver block shall be
8 2350.00 mechanically compacted. The work of the 669.65 Smt
paving blocks shall be executed in line and
level by skilled mason of flooring work only.
Small size of paver block with same
specification shall be used at residue or at
end. It should be laid in such a way that the
no cutting of the paver block to be necessary.
If cutting of paver block shall be required
than cut by machine only and laying to be
done by skilled flooring mason. The finished
surface of the paver block shall have coarse
sand Texture Finish. Pave blocks shall be
compacted and shall be re-laid if necessary.
Actual laid area shall be measured and paid
without any wastage. (A) 60 mm thick M-35
grade Grey Paver block of size 200mm x
200mm.(AMC approved rate)
Supplying and fixing of 300 mm-L x 150 mm-B x
mm-H Kerb Block for Footpath in M-20 grade using
20 mm nominal size black trap aggregate of
Sevaliya/Timba or equivalent quality for pre-cast
blocks, reasonably exposed finish/ formwork , mould
with well equipped with vibratory system for kerb
stones of approved design including curing, etc.
complete, including the cost of formwork etc.
complete. The rate shall also include necessary
9 3000.00 cutting of asphalt, fixing the Kerb stones in line and 350.89 Rmt
level on 5 cm thick sand bedding with necessary
equipments and materials. The rate shall also include
the flush pointing in CM (1:3) for all joints of the
kerbstones. Filling of zari alone the sides of the kerb
stone fixed with Bituminous concrete mixed in
proper position as directed by Engineer in change to
form a portable mixture. In any case Gravel or such
type of materials shall not be allowed for production.
a)Laying on 5 cm thick Sand Bedding.
Pre cast concrete kerb Providing and fixing M25
Grade of concrete precast exposed / Fair finish /
texture finish kerb stones of approved make as per
approved sample of any size and any type. Kerbs
shall be fixed on the foundation prepared as per
approved design. The rate shall also include for
erecting and fixing the pieces in position for
complete kerb system with chamfered type of kerbs
including necessary accessories of kerb like radius
10 1500.00 kerbs, angles and quadrant kerbs, droplet kerbs etc. 912.50 Rmt
complete as per drawing. Kerb shall be fixed as
paper joint without any jointing material. However
cement mortar shall be provided at the backside of
kerb stone joint. (Sample must be approved) Cost of
excavation, cutting , base , side filling shall includes
as directed engineer - incharge in above item
description as per BOQ (b) 380 x 600 x 150 mm high
Labour work for fixing Interlocking Blocks / any kind
of pavement on up to 50 mm thick sand bedding,
levelling, watering and fixing in line & level as well
cleaning the site etc.comp. as directed.
Labour work of fixing Kerb any design of central
verge, (both side) footpath kurb, items includes
necessary excavation, asphalt cutting of any
thickness, erecting in line and position and pointing
with cement mortar (1:3), watering, etc complete,
filling with zari along the side of the kurb, the kurb
stone fix prepared with bitumnious top surface, as
directed by engineer in charge.
Repairing damaged M.H. and rasing M.H. up to road
level incl. removing damaged brick work and
repairing by brick masonry in C.M. 1:5 and plaster in
C.M. 1:3 and fixing C.I. steps and existing MH sheet
cover, removing the debris from MH and carting the
same as directed.
a 60.00 (A) up to 0.15 mt. (@ Two Coarse) 728.82 No.
b 20.00 (B) up to 0.35mt. (@ Four Coarse) 1155.44 No.
c 50.00 (C) up to 0.65 mt. (@ Seven Coarse) 1786.49 No.
Constructing Chamber of following size including
excavation, refilling, BBCC (1:5:10) for foundation,
C.C.Channel (1:2:4), finished 15 mm thick cement
plaster inside in CM 1:3, finishing with cement slurry,
Brick masonary in CM 1:5 & excluding the cost of
chamber seat cover etc.completed.
0.60 X 0.45 mt. size Inside Clear, Depth from
Providing F.R.C. MH seat cover incl. carting to the
work site etc. comp. Directed.
F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers
& Frames Cover : 728mm ø & 100 mm thick circular
cover, 35.00 MT load design, 100x2mm MS flat
allround, 16mm ø plain round bar for lifting the
cover & should be fitted with plastic cups. Frame :
560 mm ø clear opening, outer size- 888x888x175
mm. On the upper periphery of frame 25 x 3 mm
wide MS flat should be well embed in concrete to
protect the edges of frame. FRC E.H.D.-35 manhole
cover & frame described as above
F.R.C. Medium Duty [MD-10] Chamber Covers &
Frame- 600 x 450 mm clear opening, The dimension
of frame and cover as per mentioned in Amend No.1
to IS 12592 : 2002 table
Constructing Bombay Pattern Type Catch Pit of size
0.60 x 0.60 depth up to 1 mt including excavation,
B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the
18 70.00 prop. of CM (1:6) with 40 mm thick IPS flooring in 3110.80 No
the prop M15 at bottom and 15 mm thick cement
plaster inside the catch pit in the proportion of CM
(1:3) with out jali etc. comp. as directed.
CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali
19 70.00 with frame 600mm x 600mm clear opening etc. 1377.64 No
comp.. As directed by engineer in charge.
Providing & Supplying ISI Standard RCC pipes (of
sulphate resisting cement) in a standard lengths of
following class & dia meter suitable for socket-spigot
type including all taxes , insurance, transporation,
freight charges, octroi, inspection charges, loading,
unloading, conveyance to departmental stores,
staking etc complete (IS 458:1989) Class NP-3, test
pressure 0.7/kg/sqcm. Rate also includes supplying
RCC collar for RCC pipes including taxes, carting,
loading, unloading, etc complete. Including labour
work for lowering, laying, jointing, RCC pipes in CM
1:1 1/2 of following diameters in proper position,
grade and alignent at all as directed by engineer in
charge. (RCC pipe Horizontal cast)
a 250.00 300 mm internal diameter 888.37 Rmt.
Hiring Charges For J.C.B.Machine Inclduing Cost Of
Fuel, Operator, Dirver Etc..
Hiring of Tractor with trolley considering 8 Hrs. As
22 60.00 working Day hours inclu. Driver (GWSSB SOR-2022- 2104.09 Day
23 Section-2E-Miscellenous Item No.7)
Constructing Slab type M.H. Chamber of the
following size including excavation, refilling, brick
bats cement concrete (1:5:10) of thickness 15 C.M.,
CC Channel (1:2:4) of thickness 10 C.M., finished
mm thick cement plaster inside & outside (Only for
shaft) in CM 1:3, finishing with cement slurry, P/F
mm dia M.S.Steel HDPE coated steps 35 cm c/c at
23 cm staggered in masonary CM 1:5, RCC Slab in CC
1:1.5:3 of thickness 23 C.M., including Cantering &
reinforcement (double jalli at 15 C.M. c/c bothway
12 mm dia.) but excluding the cost of Manholeseat
cover etc..completed. of Size 1.00 X 1.40 meter
(Inside Clear,M.H. length should be parallel to the
flow, for pipe dia <= 800 mm) (Based on Drainage
a 1.00 1.00 to 2.00 meter depth, (Slab at Ground level) 10177.68 Nos.
Making connection to the ex.M.H.in running sewer
incl. Dewatering and other required machinery etc. of
24 following dia pipes at any convenient time. All
damaged work shall be well repaired as per
instructions. etc..complete.
a 50.00 a. 150 mm to 300 mm dia. 1339.29 Nos.
Supplying Pneumatic Breaker Machine for RCC Slab
or Asphalt Demolishing Work on site by using
Operator, fuel, power Supply etc. Complete as
25 150.00 Directed. (No payment should be allowed for non 528.00 Hr.
working condition of machinery and for pipe line
excavation and M.H. work. Allowed only for break
Excavation for pipe line trenches for sewerage line,
manhole etc all with shoring and struting if required
as per required gardient and line including safety
provisions using site railes and stacking excavated
26 stuff including upto all required lead cleaning the site
etc. Complete for all leads and strata as specified.
(GWSSB SOR-2022-23, page no:32, section: 1& 2 B
labour, Item no:1)
a Excavation upto 1.5mt depth
360.00 In all sorts of soil and soft murrum 84.10 cmt
b Excavation upto 1.5 to 3.0mt depth
1.00 In all sorts of soil and soft murrum 92.60 cmt
150.00 Barricading the entire break down or excavated area
on rental basis using wooden ballies / M.S.angles at
max. 2.00 meter centre to centre, C.G.I. Sheet,
reflective paint / Board out side to avoid accident &
for smooth traffic diversion & movement including
cautionary board etc. Item also includes for making
27 temporary sufficient nos of lighting arrangement
through out the work with necessary required
rrangement. ..The same shall be removed after
completion of work. (Only for break down
work from start to complete)
Providing lying spreading and compacting graded
stone aggregate to wetmix macadam specification
including premixing the material with water at OMC
in mechanical mix plant carriage of mixed material
28 by tipper to site, laying in uniform layers in sub base .
base compcting with prepared surface and achieve the
desired density as per codal provision.
381.00 Production & supply of WMM 1708.13 cmt
Supplying, labour for excavation of all type of soil at
any depth including excavation of asphalt pavement
of any thickness,demolition of brick work in cm of
29 any proportion including stacking of serviceable
materials and disposal of unserviceable material rtc
comp. as directed.
150.00 Mazdoor(male) at day/night(r&b sor 2023-
24,sr.no.1051,code no.L022) 493.00 No
120.00 Mazdoor(Female) at day/night(r&b sor 2023-
24,sr.no.1050,code no.L021) 450.00 No
60.00 Fitter/makadam/supervisor at day/night(r&b sor
2023-24,sr.no.1043,code no.L014) 640.00 No
Pre cast concrete kerb Providing and fixing
M25 Grade of concrete precast exposed / Fair
finish / texture finish kerb stones of approved
make as per approved sample of any size
and any type. Kerbs shall be fixed on the
foundation prepared as per approved design.
The rate shall also include for erecting and
fixing the pieces in position for complete
kerb system with chamfered type of kerbs
including necessary accessories of kerb like
30 3400.00 radius kerb, angles and quadrant kerbs, 1061.61 RMT
droplet kerbs etc. complete as per drawing.
Kerb shall be fixed as paper joint without any
jointing material. However cement mortar
shall be provided at the backside of kerb
stone joint. (Sample must be approved) Cost
of excavation, cutting , base , side filling
shall includes as directed engineer - incharge
in above item description as per BOQ (a)
hight x 600x 150 mm high median kerb.As
per approved rate
(in words also)
CONTRACTOR'S SIGNATURE DY.CITY ENGINEER-1
& STAMP (South West Zone)
AHMEDABAD MUNICIPAL CORPORATION
"South West Zone, Zonal Office", Tushar Deshmukh bhavan Ahmedabad.
Municipal Commissioner invites Percentage Rate sealed tenders from interested contractors .
1 Name of work Making New Central Verge and Footpath for the year 2026-27 at
different Roads in Sarkhej Ward SWZ.
2 Time Limit 12 Months (Excluding Monsoon Period)
3 Eligibility Criteria Register “C” class in PWD in Govt. R&B/CPWD/AMC or equivalent
registration with any other state Govt. or institutions.
4 Estimated Cost put to
5 Earnest Money Deposit Rs.1,49,460.00 (Demand Draft, Pay order, Bank Guarantee (As per
finanance circular No 56) or Cheque in favour of Municipal
Commissioner, Ahmedabad) To be submitted as prescribed in
below. Demand Draft or Bank Guarantee shall be from Nationalized
Bank and valid for 120 days.
6 (A) Security Deposit: 5% of Tender Amount
(B) Retention 1. @ 2% of the value of work done will be deducted from each RA
bill. It will be released along with release of payment of Final Bill.
7 Tender fees Rs.2400/-Demand Draft / Pay order in favour of Municipal
(Non refundable) Commissioner, Ahmedabad)
8 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to
Assistant Manager (South West zone) , Ahmedabad Municipal
Corporation, Late Shree Tushar Deshmukh Bhavan, Nr. Shelby
hospital, Opp. karnavati Club, S.G. highway, Jodhpur, Ahmedabad-
9 Tenders issue date Tenders from the website http://amc.nprocure.com and
http://nprocure.com. shall be down loaded from
10 Last date of receiving Dt. 08.04.2026 up to 16:00 Hrs The tenders received after
Tenders. this date and time will not be entertained under any
11 Date of Opening Dt. 08.04.2026 at 17.00 Hrs to Assistant Manager "South
west Zone Shree Tushar Deshmukh Bhavan, Nr. Shelby hospital,
Opp. karnavati Club, S.G. highway, Jodhpur, Ahmedabad-380015
12 Mode of sending the Document shall be submitted in sealed envelope systems By RPAD/
Tender Speed post/ Hand Delivery/ Courier in sealed covers as described in
Documents submission of the tender.
13 Terms, Condition, & All general condition of contract of Form B1 condition of contract
Specification shall be applicable.
14 GST ltKtk Ftðþ vhevºt lkch - yb>tJt> BGþrlrm5j ftuvtuohNl btk Ítulj ytuVem / v.J.yu. / «tusu¾x rJCtd îtht
31, <t.07-07-2017 Bþsc htuz / rcÕz´d/jtEx/c{es Ft<tytu îtht cnth vtzJtbtk ytJujt xuLzh suLþk mcbeNl
<t.01-07-2017 vAe fhJtLþk &tg Au, <uJt <btb xuLzhtubtk <&t nJu vAe cnth
vtzJtbtk ytJlth Wvhtuf< rJCtd/Ft<tltk <btb xuLzhtubtk (bxehegj + juch mÃjtg
mt&u) GSTlt ltuxeVefuNl Bþsc GST sgtk jtøþ vz<tu ntug ðgtk, m>hnwk ftblt
Bidder yu GST ltuxeVefuNl Bþscle yuÃjefucejexe ægtlbtk htFelu huxLþk cez´d
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any or all the
tenders without assigning any reasons thereof.
Seal and Signature of the Bidder DY. City Engineer-1
(South West Zone)
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (Hereinafter called “the Employer”) invites sealed
Tender document from reputed and qualified bidders for the construction of Works detailed in
the Table below:-
Sr. Name of Works Approximate Bid Security Completion
No. value of works (Rs.) Period
1 Making New Central Verge and Footpath Rs.1,49,45,929.36 Rs.1,49,460.00 12 Months
for the year 2026-27 at different Roads (Excluding
in Sarkhej Ward SWZ. Monsoon
2. Tender (a complete set of bidding document) fee shall be Rs. 1500/- in the form of Demand Draft
/ Pay Order from any Nationalized Bank in favor of MUNICIPAL COMMISSIONER, Ahmedabad,
payable at Ahmedabad, which shall be non refundable. The fees shall be paid at the time of
submitting the tender.
3. Interested bidders shall download the tender documents from website http://amc.nprocure.com
and http://nprocure.com. up to Dt. 08.04.2026 at 16:00 hrs tender fee as mentioned in clause
above shall be paid by the bidder at the time of bid submission.
4. All bids must be accompanied by Bid Security of the amount specified for the Works in the above
Table payable at Ahmedabad and drawn in favor of AHMEDABAD MUNICIPAL CORPORATION,
Ahmedabad. Bid Security will have to be in any one of the forms as specified in Clause of ITB
(Instructions to Bidders).
All Bids must be delivered to Assistant Manager "South West Zone, Zonal Office", Late Shree
Tushar Deshmukh Bhavan, Nr. Shelby hospital, Opp. karnavati Club, S.G. highway, Jodhpur,
Ahmedabad-380015.
Seal and Signature of the Bidder DY. City Engineer-1
(South West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central Govt.
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at different
sites simultaneously. Contractor's having labour force available during festivals shall only apply.
Contractor can not stop the work due to on availably of labour force. In case progress is delayed,
contractor shall be penalized 0.1% of Tender amount per day for work done after time limit,
maximum up to 10% for remaining work.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes. Exluding GST as per As
per circular no 38 Date 21.11.2022of finance department of Ahmedabad Municipal Corporation .
9. If the work is not completed within time limit the penalty will be recovered from immediate bills of
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then
contractor shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as directed"/approved" by
the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to mean
as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of specific
mention of a particular point or aspect, the provisions on these particular points, or aspects in the
relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest to the
following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route and not
necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall be
taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of work is
in the form of a designation containing the number of the specification of the material and prefix 'M'
20. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve the
contractor from the responsibility of replacing defective material brought on site or materials used in
the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
23. Collection of approved materials shall be done at site of work in a systematic manner. Materials shall
be stone at site of work in a systematic manner. Materials shall be stored in such a manner as to
prevent damage, deterioration or intrusion of foreign matter and to-ensure the preservation of their
quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from the
site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient numbers
and in good working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the particular
27. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient numbers
and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or over
loading of the various components of the structure during execution or after completion of the
29. All necessary safety measures and precaution (including those laid down in the various relevant
Indian Standards) shall be taken to ensure the safety of men, materials and machinery on the works
as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one percent
towards testing charges is separately made.
31. Total Station Survey of Central line marking, different utilities, trees, encroachment etc:-
The contractor have to carry out total station survey of each roads included in the tender showing
central line of the road, location of Machine holes, Catchpits, Trees, Temples, Power Distribution
Boards, Encroachments etc. before starting the work on site. Contractor shall have to submit such
survey report and drawing to AMC
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar days
(120) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall furnish to
the Corporation Security Deposit of 5% (five percent) of the contract price cheque or Bank
Guarantee, pay order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE Add.CITY ENGINEER
& STAMP (South West Zone)
SPECIFICATIONS OF MATERIALS – CIVIL
This section gives detail specifications for mainly used materials, for other materials refer Building Specifications.
For materials relevant specification of Building Specification shall apply.
TECHNICAL SPECIFICATIONS
NAME OF THE WORK:- Making New Central Verge and Footpath for the year 2026-27 at different
Roads in Sarkhej Ward SWZ.
Item No.1: Box cutting the read surface in all sorts of soil, murrum to proper slope & camber for
making a base for road work including removing the excavated stuff & depositing on the road
side as directed upto 50.00 mt. Lead.
Any soil which generally yields to the application of pickaxes and shovels, spades, rakes or any
such ordinary excavating implement or organic soil, gravel, silt, sand turf loam, clay, peat etc. falls
under this category. For materials and workmanship for earthwork and excavation, relevant
specification IS: 3764 & IS 1200 (Part I) shall be followed.The depth of the excavation shall be as
per the item description.
Clearing the Site:
The site where the Development has to be carried out shall be cleared and all obstructions, loose
stones, materials and rubbish of all kind, bush; wood and all type trees shall be removed, as
The materials so obtained shall be the property of the Client and shall be conveyed and stacked as
directed, within 50-m. lead. The roots of the trees coming in the sides of the trenches shall be cut
and coated with hot Bitumen.
All types of trees, woods etc. which requires prior permission of Govt./ Forest Authority /
Municipal Commissioner, before cutting shall be cut after obtaining such permission from them. It
shall be the Client's responsibility to obtain such permission from the respective authorities.
The rate of site clearance is deemed to be included in the rate of earthwork, for which no extra will
After cleaning the site, the centerline of the central verge & other constructions will be given by the
Engineer-in-charge. The Contractor shall assume full responsibility for alignment, elevation and
dimension of each and all parts of the work. Contractor shall supply labours, materials, etc. required
for setting out the reference marks and bench marks made of MS angle iron and embedded in 1:2:4
CC.They shall maintain the same as long as required and directed.
The excavation shall be carried out in true line and level and shall have the width and depth, as
shown in the drawings or as directed. The Contractor shall do the necessary shoring and strutting or
shall provide necessary slopes to a safe angle or steps, as required or directed, at his own cost. No
extra payment shall be made for such precautionary measures, taken. The bottom of the excavated
area shall be leveled both longitudinally and transversely, as directed, by removing excess soil and
watering, as required. No earth filling will be allowed for bringing it to level, if by mistake or any
other reason, excavation is made deeper or wider than shown on the drawings or as directed. The
extra depth or width shall be made up with sand filling, as specified for the bottom level of the
subsequent finishing at the cost of the Contractor or as directed by Engineer-In-Charge.
The Contractor shall at his own expense and without extra charge make provision of supporting all
utility services, lighting the excavated areas, separating and stacking serviceable materials neatly,
shoring, timbering, strutting, bailing out water either sub-soil or rainwater, including pumping at
stage of the work. Excavated areas shall be kept free of water while masonry or concrete or relevant
base works are in progress and till the Engineer-in-charge considers it necessary.
Disposal of the Excavated Stuff:
The excavated stuff of the selected type shall be used in filling the excavated areas wherever
required inlayers, including ramming and watering, ensuring proper compaction etc. complete.The
Contractor shall remove the balance of the excavated quantity from the site of work, to a place,as
directed and for all lift.The lead is the shortest practical route and not necessarily the route actually
taken. The decision of Engineer-In-charge shall be final in this regard.
Mode of Measurement and Payment:
The measurement of excavation of excavated area shall be made according to the sections shown
on the drawing or as per sections given by the Engineer-in-charge. No payment shall be made for
surplus excavation made in excess of above requirements or due to stepping and sloping back as
found necessary, on account of conditions of soil and requirements of safety. The rate shall include
for clearing the site, surface dressing, making layout for road, fixing permanent grid points with MS
iron posts, embedded in C.C. 1:2:4, placed sufficiently away from the existing traffic lines and
establishing bench marks etc.The rates shall include for necessary shoring, timbering and strutting
for protection of sides of the excavated area, pumping out rain or surface water at any stage of
construction so as to keep the excavated area dry, to the satisfaction of the /Engineer-in-charge.
The rate shall include leveling and ramming the bottoms of excavations to receive concrete, etc.
including trimming to slope wherever necessary etc. complete.In filling clods bigger than 50 mm.
shall not be allowed. Only consolidated measurements of filling shall be paid. Consolidation to be
done by mechanical compactor as per relevant item.
Item No.2 : CONVEYANCE CHARGES-FOR DIFFERENT TYPES OF MATERIALS (A)
lime murrum building rubbish earth manure or sludge & execavated rock and rubbish
[Lime murrum building rubbish]
The surplus earth, which is left on site after refilling and proper watering of the trenches,
shall be carted away up to a distance within lead upon kmts. All surplus earth should be carted
away immediately after the instruction or orders of the engineer in charge within 24 hours. The
surplus earth shall be spread at the site shown where it is carried. If the work is not carried out by
the contractor as above AMC may carry out the same at the risk and cost of contractor and the
same may be deducted from the dues to the contractor in any form.The measurement of the surplus
earth shall be paid for as per arithmetical calculations. Nothing extra shall be paid for the bulk age
of the excavated earth.
The rate shall be for a unit of Cmt.
Item No.3 : Providing and laying cement concrete 1:5:10 (1- Cement : 5- Coarse sand : 10-
hand broken stone aggregates 40 mm nominal size) and curing complete excluding cost of
formwork in (A)Foundation and Plinth
1.1 Water shall conform to M-1, Cement shall conform to M-5. Sand shall conform to M-10. Stone
aggregate 40 mm. Nominal size shall conform to M-12.
2.0 Workmanship :
2.1 The relevant specification of item No 5.3.2.(A) shall be followed for the work except that the work
is to be carried out in cement concrete 1:5:10.
3.0 Mode of measurement and payment :
3.1 The concrete shall be measured for its length, breadth and depth. Limiting dimensions to those
specified on plans or as directed.The rate shall be for a unit of one cubic meter.
Item No.4 : Dismantling the following including loading, unloading and disposal of unserviceable
material for all lead or as directed by Engineer-In-Charge and stacking the serviceable
material and backfilling the resulting trenches and pits complete.
Dismantling the following including loading, unloading and disposal of unserviceable material for
all lead or as directed by Engineer-In-Charge and stacking the serviceable material and backfilling
the resulting trenches and pits complete.
Item No.5 : Extra rate over item of excavation of earth for excavation of asphalt pavement / RCC
of thickness up to 0.20 meter including demolishing the asphalt carpet, metal,s oiling/cutting
Reinforcement etc.comp. with stacking the material as directed. (Based on Previously
approved rate by C E sir ) a) up to 0.20 meter thickness (By Manual) b) 0.20 to 0.30 meter (By
any type of Breaker Machine or R.C.C.Cutter machine including cost of operator, fuel, &
transportation etc complete. C) 0.30 meter & above (By any type of Breaker Machine or
R.C.C.Cutter machine including cost of operator, fuel, & transportation etc complete.
Extra rate for excavation of asphalt pavement for thickness Upto 0.20 Meter including
demolishing the asphalt carpet, metal, soiling etc. complete by Manualy And For thickness from
0.20 Meter to 0.30 Meter By Breaker Machine with stacking the materials as directed. Cost of
operator, Fuel, & Transportation Etc is Included for Asphalt Cutting By Breaker Machine. The road
surface of asphalt shall carefully be opened to full width as directed by the Engineer in charge
Asphalt, popada's spouls, metals etc shall be separately deposited in such places as may be
determined by the Engineer-in-charge. In case above materials not being so deposited or being
mixed up with the excavated materials will not be allowed for refilling. The cost of materials shall
be charged from the contractor. The decision of the Dy.C.E. Shall be final and binding to the
The rate per sq.mt. in this item shall be paid extra addition to the rate for excavation
Mode of measurement: The rate shall be for a unit of Smt. Basis..
Item No.6 : Providing and laying Cement Concrete 1:3:6 (1-Cement : 3-Coarse sand : 6-Hand
broken stone aggregates 40mm nominal size) and curing complete.excluding cost of form
work in(A)Foundation & plinth
3.2 Water shall conform to M-1, Cement shall conform to M-3. Sand shall conform to M-6. Stone
aggregate 40 mm. Nominal size shall conform to M-12.
4.0 Workmanship :
4.1 The relevant specification of item No 5.3.2.(A) shall be followed for the work except that the work
is to be carried out in cement concrete 1:5:10.
5.0 Mode of measurement and payment :
5.1 The concrete shall be measured for its length, breadth and depth. Limiting dimensions to those
specified on plans or as directed. The rate shall be for a unit of one cubic meter.
Item No.7 : Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm
thick, M-35 Grade of any size ; shape (Usually Uni-Paver Blocks) using black trap good
quality aggragate of 20 mm nominal size for footpath, parking areas, service lanes and
other areas as mentioned in the drawing / instruction of engineer in charge. Cost includes
formworks using rubber mould, Rate providing and laying paver blocks as per required
grading and specification. The paver block shall be mechanically compacted. The work of
paving blocks shall be executed in line and level by skill mason of flooring work only. It
should be laid in such a way that the no cutting of the paver block to be necessary. if cutting
of paver block necessary then it should be cut by machine only and carting. The finished
surface of the paver block shall have resonably good, plain finished. Paver blocks shall be
compacted and shall be relaid if necessary. Gravel or such type of materials shall not be
allowed for production. Laying on 5cms thick sand beddding.(AMC approved Rate )
The scope of work includes manufacturing, supplying and laying of precast paver blocks at various
Retail outlets. The work includes :Verification of the existing site condition and advising our
project in charge to lay suitable base course if required.
Contractors are required to satisfy themselves with quality of sub grade, sub -base course before the
paver blocks are laid and suggest strengthening if required.
Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver
blocks.Manufacturing of paver blocks in your plant as per requirements in technical specification
enclosed.Supplying of paver blocks at site, including handling at both ends.
Laying of paver blocks at site as per requirement in technical specification, within shortest possible
time the site is public place hence care should be taken to ensure that the routine activities shall not
be disturbed. The job of laying may required to be carried out during night also.
Testing of paver blocks through reputed Govt./Non Govt. Test house and submission of test results
as per requirements in Technical Specifications. AMC reserves the right to carryout test at random.
Cost for such tests to be borne by party.The contractor shall guarantee that all material and
components designed, fabricated, supplied and laid by him shall be free from any type of defect due
to faulty material and/or workmanship/erection for a period of 5 year from the date of completion
of work. However, the contractor 5 years shall render free mintenance.
TECHNICAL SPECIFICATIONS :
I) Paver Block Manufacturing Facilities :
The Paver Block shall be made in factory with following minimum facilities :
1.1 Concrete Block making Machines :
The machine should be capable of producing high quality Paver Blocks by obtaining high level of
compaction by application of hydraulic compaction and also by high intensity vibration to the
moulds. The machine should have automatic control panel for uniformity in strength.
1.2 Concrete Batching & Mixing Plant : (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete ingredient
should be mixed in concrete Batching & Mixing plant with minimum capacity of 30 cum/hour. The
plant should equipped with automatic control panel for maintaining water cement ratio from batch
to batch to obtain concrete of uniform quality and strength.
The plant should be equipped with adequate mechanism for mechanized loading of raw materials
into mixer and conveyor belt for transportation of concrete from mixer to concrete block making
machine to maintain quality of wet cement.
The factory should have well designed curing area to ensure adequate curing of paver
1.4 Laboratory (Desirable but not essential) :
The factory should have the following:
Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
(1). Systematic record of test results of various paver blocks manufactured in the factory.
(2). Concrete Mix Design for various grade of concrete used for making of paver blocks.
II) SPECIFICATIONS FOR COLOURED PAVER BLOCKS :
Coloured concrete paver blocks shall be manufactured as per attached specifications using
approved colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with
minimum colour pigment of 3% by weight of cement. The colour shade shall be “RED” as selected
by AMC before commencement of the work. White cement shall be used for colored pavers to
obtain the desired colour shade. The job also includes providing 50 mm thick sand bedding to
match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 Months
(Excluding Monsoon Period)from the date of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers
will be as per attachment.
III) PAVERS BLOCK CHARACTERISTICS :
The concrete pavers should have perpendicularities after release from the mould and the same
should be retained until the laying.
The surface should be reasonably smooth and of anti skid and anti glare type.
The paver should have uniform chamfers to facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand
filling after vibration on the paver S urface.
The concrete mix design should be followed for each batch of materials separately and
automatic batching plant is to be used to achieve uniformity in strength and quality.
The pavers shall be manufactured in single layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying, desired
shape of the surface and adequate compaction of the sand in the joints.
The pavers shall be of cement gray colour without any pigment & for coloured pavers refer
“specifications for coloured pavers.”
The pavers are to be skirted all round with kerbing using solid concrete blocks of size 150mm X
250mm X 380mm. The kerbing should be embedded for 100mm depth. The concrete used for
kerbing shall be cured properly for 7 days minimum.
IV) Paver Block Dimensions :
Thickness 60mm Shape Unirregular (Uniform Shape with no Hollow Or Cracks) Uni, I shape, tri
hex or directed by Dy .C.E.
Chamfer 4mm to 6mm along top edges Colour Natural cement grey colour without use of any
For coloured pavers refer “specifications for coloured pavers”
(+/-) 2mm for length & width,(+/-) 3mm for Height (Thickness)
V) Testing of Paver Blocks :
SR.NO.* TEST SPECIFICATION Average Values (Average of Minimum Five Samples/Site)
1. Compressive Strength Min. 35 N/Sqmm for 60mm thick
2. Flexural Strength Minimum 4.5 N/Sqmm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
5. Minimum Cement Content 380 Kg/Cum (Not Essential)
* Sampling and Testing procedure as per enclosed specifications
SAMPLING AND TESTING PROCEDURES FOR PAVER BLOCKS.
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Essential – Minimum 2 Blocks per 10000 bocks..
1. Sampling For Testing
Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
Compressive Strength
Testing for compressive strength shall be undertaken in accordance with Appendix-B.
The average compressive strength of the bocks tested shall be Min. 35 N/Sqmm.
Sampling of Paver blocks.
Method of sampling :
Before laying paver blocks, each designated section comprising not more than
blocks, shall be divided into ten approximately equal groups. Three blocks shall be drawn
from each group.Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the designated
section of part thereof, and the consignment represented by the sample, are clearly defined. The
sample shall be dispatched to the approved test laboratory taking precaution to avoid damage to the
paving in transit. Protect the paving from damage and contamination until they have been tested.
The testing shall be carried as soon as possible, after the sample has been taken. As soon as
practicable after sampling. The samples shall be stored in water at 20 degree C ± 5 degree C for
hours prior to testing.
The mode of measurement shall be on Smt. basis.
Item No.8 : Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb block for
Footpath in M-20 grade using 20 mm nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably exposed finish/ formwork , mould with well
equipped with vibratory system for kerb stones of approved design including curing, etc.
complete, including the cost of formwork etc. complete. The rate shall also include necessary
cutting of asphalt, fixing the Kerb stones in line and level on 5 cm thick sand bedding with
necessary equipments and materials. The rate shall also include the flush pointing in CM
(1:3) for all joints of the kerbstones. Filling of zari alone the sides of the kerb stone fixed with
Bituminous concrete mixed in proper position as directed by Engineer in change to form a
portable mixture. In any case Gravel or such type of materials shall not be allowed for
production. (AMC approved Rate )a) Laying on 5 cm thick Sand Bedding.
Trenches of specified width and depth shall first be mode along the edges of the wearing course
of the road or along the line of pave block flooring to receive the restraint block.
The bed of the trenches shall be compacted manually with steel rammers or a firm and even surface
and then stones shall be set in sand bedding
The edge restraint blocks shall be laid with their length running parallel to the paving edge, true in
line and gradient.
The joints of blocks shall be not more than to mm and filled with the CM 1:2 (1 cement : 2 fine
sand/) which shall be cured for 7 days.
The edge shall be restored and all surplus earth including rubbish etc. disposed off as directed by
the engineer in charges.
Length of the finished work shall be measured in running meter along the edge of the paving
correct to a cm. Rate The rate shall include the cost of the materials and labour including stone of
specified materials involved in all the operation described above.
The mode of measurement shall be on Rmt. basis.
Pre cast concrete kerb Providing and fixing M25 Grade of concrete precast exposed / Fair
finish / texture finish kerb stones of approved make as per approved sample of any size and
any type. Kerbs shall be fixed on the foundation prepared as per approved design. The rate
shall also include for erecting and fixing the pieces in position for complete kerb system with
chamfered type of kerbs including necessary accessories of kerb like radius kerbs, angles and
quadrant kerbs, droplet kerbs etc. complete as per drawing. Kerb shall be fixed as paper joint
without any jointing material. However cement mortar shall be provided at the backside of
kerb stone joint. (Sample must be approved) Cost of excavation, cutting , base , side filling
shall includes as directed engineer - incharge in above item description as per BOQ (b)
mm high Footpath kerb*600*150mm
Material: (1) Water shall conform to M-1. (2) Cement shall conform to M-3. (3) Sand shall
conform to M-6. Stone aggregate shall conform to M-12 (5) Pre cast kerb shall be of approved make and as
per approvedsample.
1.0 Workmanship :
All Precast exposed/ fare finish/ texture finish kerb stones shall be of approved make.Sufficient
curing shall be done before placement of the same.
The method of transporting and placing the precast members shall be as approved by
theArchitect and Engineer-in-charge. Members shall be so transported that no breakage orundue
stresses are induced in them.
The pits of the size 0.15 M in width and 0.23 M. in depth or as per site condition shall first be
excavated, true to line and level. The specifications for excavation shall be followed as per relevant
The pits shall be filled with a layer of 0.15 M. thick lean concrete M15. The kerbs shall be laid
on existing PCC base in true line and plumb. The specifications for PCC work shall be followed as
per relevant item.
The rate shall also include for erecting and fixing the pieces in position for complete Kerb
systems with Chamfered type of kerbs including all type of necessary accessories of kerb like
Radius Kerbs, Angles and Quadrant Kerbs, inlet kerb etc complete as per drawing.
The rate shall also include the flush pointing in CM (1:2) for all joints of the kerb stones.
Mode of Measurement & Payment:
The rate shall include the cost of material and labour for fixing the kerb system including laying,
jointing and finishing but excluding the cost of excavation, bitumen cutting, base PCC, zari filling
with bitumen material.
The Measurement of the item shall be in Rmt basis.
Item No.10 : Labour work for fixing interlocking blocks / any kind of pavement on up to
50 mm thick sand bedding, leveling, watering and fixing in line & level as well cleaning the
site etc. comp. as directed
Specification as per Item No. 14 only work as mentioned in Abstract.
Item No.11 : Labour work of fixing Kerb any design of central verge, (both side) footpath
kurb, items includes necessary excavation, asphalt cutting of any thickness, erecting in line
and position and pointing with cement mortar (1:3), watering, etc complete, filling with zari
along the side of the kurb, the kurb stone fix prepared with bitumnious top surface, as
directed by engineer in charge.
Work shall be carried out as per item description including cost of all labour and materials etc.
complete as directed. General standard practice of laying of paver block is applicable.
The measurements shall be on SMT basis.
Item No.12 : Repairing damaged M.H. and rasing M.H. up to road level incl. removing
damaged brick work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and
fixing C.I. steps and existing MH sheet cover, removing the debris from MH and carting the
same as directed.
(B) up to 0.35mt. (@ Four Coarse)
This item relates to repairing work of above item of machine hole with fixing existing seat at
top & fixing pre-cast FRC cover (medium duty) repairing up to 2.00 mt. depth. This item relates to
repairing existing machine hole of 1.40 x 1.00 or 1.00 x 0.75 mt. size with removing first existing
seat & cover including demolishing existing loose masonry work up to from GF level to depth if
specified & up to same height brick work in CM 1:5 shall be completed & after of that work
plastering work in CM 1:3 shall also be done. Rate including fixing existing or new (if not there)
C.I. steps shall fixed at time of masonary work. After completion of brick work & plastering same
machine hole seat & cover fixing at top & casted it in C.C. 1:2:4 etc. Measurements shall be given
on no. of basis up to 2.00 mt. depth work.
For detailed specification refer R & B Department booklet for General Technical Specification for building
Items also includes:
1. Proper Barricading to avoid accidents.
2. Removal of debris from site.
3. Compaction of Bitumen by Roller.
4. Applying tack coat before laying of Hotmix material.
The mode of payment for this item shall be on No. Basis.
Item No.13 : Constructing Chamber of following size including excavation, refilling, BBCC
(1:5:10) for foundation, C.C.Channel (1:2:4), finished 15 mm thick cement plaster inside in
CM 1:3, finishing with cement slurry, Brick masonary in CM 1:5 & excluding the cost of
chamber seat cover etc.completed.
a) 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90 meter
Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10) for
foundation, C.C.Channel (1:2:4), finished 15 mm thick cement plaster inside in CM 1:3, finishing
with cement slurry, Brick masonary in CM 1:5 & excluding the cost of chamber seat cover
etc..completed. (Based on Drainage SOR 2009-10)
(A) 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia <=150mm. (Drainage
SOR 2009-10, P.H.E.Chamber, Item No.243 Page No. 63)
(B) 0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to 1.20 meter for pipe dia <=230 mm (Drainage
SOR 2009-10, P.H.E.Chamber, Item No.241 Page No. 63)
(C) Chamber seat cover (FRC) cover 706 x 556 x 50 mm rectangular cover frame size 600 x 450 mm
clear opening outer size 816 x 666 x 100 mm
Mode of measurement:
The rate shall be for a unit of No. basis.
Item No.14 : Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.
a) F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers & Frames Cover : 728mm ø &
mm thick circular cover, 35.00 MT load design, 100x2mm MS flat allround, 16mm ø plain
round bar for lifting the cover & should be fitted with plastic cups. Frame : 560 mm ø clear
opening, outer size- 888x888x175 mm. On the upper periphery of frame 25 x 3 mm wide MS
flat should be well embed in concrete to protect the edges of frame. FRC E.H.D.-35 manhole
cover & frame described as above
d) F.R.C. Medium Duty [MD-10] Chamber Covers & Frame- 600 x 450 mm clear opening, The
dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed. (Based on rate of central
(A)FRC heavy duty cover size 730 mm. & 90 mm thick circular cover 20 M.T. design load and frame size
mm clear opening size 890 x 890 x 120 mm.
(B)FRC heavy duty cover size 730 mm. & 90 mm thick circular cover 20 M.T. design load and frame size
mm clear opening size 890 x 890 x 120 mm.
Mode of measurement:
The rate shall be for a No. basis
Item No.15 Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt
including excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of CM
(1:6) with 40 mm thick IPS flooring in the prop M15 at bottom and 15 mm thick cement
plaster inside the catch pit in the proportion of CM (1:3) with out jali etc. comp. as directed.
For detailed specification refer clause No. 24.44.1 of R & B Department booklet for General
Technical Specification for building works
• Extra Depth of Catch pit size 600mm x 600mm for every additional depth of 100 mm or Part
thereof beyond 1000mm depth upto 1500 mm depth
For detailed specification refer clause No.24.46 of R & B Department booklet for General Technical
Specification for building works.
Mode of measurement and payment
The contractor shall be responsible for any loss or damage to the catch pit up to the end of work. He
shall also be responsible for the cleaning all bituminous material from the catch pit.
The rate shall be for a unit of one No.
Item No.16 CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with frame 600mm x
600mm clear opening etc. comp.. As directed by engineer in charge.
For detailed specification refer clause No. 24.35 of R & B Department booklet forGeneral Technical
Specification for building works.
The contractor shall be responsible for any loss or damage to the catch pit up to the end of work. He
shall also be responsible for the cleaning all bituminous material from the catch pit.
The rate shall be for a unit of one No.
Item No.17 Providing & Supplying ISI Standard RCC pipes (of sulphate resisting cement) in
a standard lengths of following class & dia meter suitable for socket-spigot type including all
taxes , insurance, transporation, freight charges, octroi, inspection charges, loading,
unloading, conveyance to departmental stores, staking etc complete (IS 458:1989) Class NP-3,
test pressure 0.7/kg/sqcm. Rate also includes supplying RCC collar for RCC pipes including
taxes, carting, loading, unloading, etc complete. Including labour work for lowering, laying,
jointing, RCC pipes in CM 1:1 1/2 of following diameters in proper position, grade and
alignent at all as directed by engineer in charge. (RCC pipe Horizontal cast)
a) 300 mm internal diameter
Providing & Supplying ISI Standard RCC pipes (of OP cement) in a standard lengths of
following class & dia meter suitable for socket-spigot type including all taxes , insurance,
transporation, freight charges, octroi, inspection charges, loading, unloading, conveyance to
departmental stores, staking etc complete (IS 458:1989) Class NP-3, test pressure 0.7/kg/sqcm.
Rate also includes supplying RCC collar for RCC pipes including taxes, carting, loading,
unloading, etc complete. Including labour work for lowering, laying, jointing, RCC pipes in CM
1:1 1/2 of following diameters in proper position, grade and alignent at all as directed by engineer
in charge. inlcuding conveyance from store to site of work labour giving hydraulic testing and all
necessary testing as per IS code .(GWSSB SOR-2022-23, page no:15, Item no:10.2.A & 10.3 &
section part 1&2 B labour section, item no:11.B) (RCC pipe Horizontal cast) 300 mm internal
The mode of measurement shall be on Rmt. basis.
Item No.18 Hiring Charges For J.C.B.Machine Inclduing Cost Of Fuel, Operator, Dirver
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge
and/or his authorized representative.
Mode of measurements shall be on HR basis.
Item no.19 Hiring of Tractor with trolley considering 8 Hrs. As working Day hours inclu.
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge
and/or his authorized representative.
Mode of measurements shall be on Day basis.
Item no 20 Constructing Slab type M.H. Chamber of the following size including excavation,
refilling, brick bats cement concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of
thickness 10 C.M., finished 15 mm thick cement plaster inside & outside (Only for shaft) in
CM 1:3, finishing with cement slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at
35 cm staggered in masonary CM 1:5, RCC Slab in CC 1:1.5:3 of thickness 23 C.M.,
including Cantering & reinforcement (double jalli at 15 C.M. c/c bothway 12 mm dia.) but
excluding the cost of Manholeseat cover etc..completed. of Size 1.00 X 1.40 meter (Inside
Clear,M.H. length should be parallel to the flow, for pipe dia <= 800 mm)
Constructing Slab type M.H. Chamber of the following size including excavation, refilling,
brick bats cement concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness 10 C.M.,
finished 15 mm thick cement plaster inside & outside (Only for shaft) in CM 1:3, finishing with
cement slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered in
masonary CM 1:5, RCC Slab in CC 1:1.5:3 of thickness 23 C.M., including Cantering &
reinforcement (double jalli at 15 C.M. c/c bothway 12 mm dia.) but excluding the cost of
Manholeseat cover etc..completed. of Size 1.00 X 1.40 meter (Inside Clear,M.H. length should
be parallel to the flow, for pipe dia <= 800 mm)
Item no.21 Making connection to the ex.M.H.in running sewer incl. Dewatering and other
required machinery etc. of following dia pipes at any convenient time. All damaged work
shall be well repaired as per instructions. etc..complete.
Making connection to the ex.M.H.in running sewer incl. Dewatering and other required
machinery etc. of following dia pipes at any convenient time. All damaged work shall be well
repaired as per instructions. etc..complete.
Item no.22 Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing
Work on site by using Operator, fuel, power Supply etc. Complete as Directed. (No payment
should be allowed for non working condition of machinery and for pipe line excavation and
M.H. work. Allowed only for break down work)
Making connection to the ex.M.H.in running sewer incl. Dewatering and other required
machinery etc. of following dia pipes at any convenient time. All damaged work shall be well
repaired as per instructions. etc..complete.
Item No 23 Excavation for pipe line trenches for sewerage line, manhole etc all with shoring
and struting if required as per required gardient and line including safety provisions using
site railes and stacking excavated stuff including upto all required lead cleaning the site etc.
Complete for all leads and strata as specified.(1) Excavation upto 1.5mt depth( In all sorts of
soil and soft murrum), (2)Excavation upto 1.5 to 3.0mt depth(In all sorts of soil and soft murrum)
Excavation for pipe line trenches for sewerage line, manhole etc all with shoring and struting if
required as per required gardient and line including safety provisions using site railes and stacking
excavated stuff including upto all required lead cleaning the site etc. Complete for all leads and
strata as specified. (GWSSB SOR-2022-23, page no:32, section: 1& 2 B labour, Item no:1)
The mode of measurement shall be on Cmt. basis.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER
STANDARD P.W.D. TECHNICAL SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE
BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS AVAILABLE,
SPECIFICATION GIVEN BY THE ENGINEER-IN-CHARGE SHALL BE FOLLOWED AND FOR
THE SAME I AGREE TO ABIDE BY THEM.
CONTRACTOR'S SIGNATURE DY.CITY ENGINEER-
& STAMP (South West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
As per City Engineer’s circular no.-6/2011-12 Dt.24.6.2011 all terms & conditions
will be applied.
Seal and Signature of the Bidder DY. City Engineer-1
Date: (South West Zone)