Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | L1 | Accepted-AOC AWARDED | |
| 2 | Rejected-Technical | - | Rejected-Technical TECHNICALLY NOT OK | |
| 3 | Rejected-Technical MOHAMMAD IMTIYAZ CHITARPUR RAMGARH 825101 JHARKHAND INDIA | CHITARPUR | RAMGARH | JHARKHAND | 825101 | - | Rejected-Technical TECHNICALLY NOT OK |
| Sl No | Description | Qty | Unit | PAPPU ELECTRICAL L1 |
|---|---|---|---|---|
| 1.00Rewinding/Repairing of 18.5 and 3.7 KW induction motor | ||||
| 2.00 | Cost of SE Wire | 17.76 | kg | 1,263 ₹22,430.88 Lowest |
| 3.00 | Insulating material @15% of sl 1 | 1 | LS | 3,364.63 ₹3,364.63 Lowest |
| 4.00 | Labour cost @15% of sl 1 | 1 | LS | 3,364.63 ₹3,364.63 Lowest |
| 5.00 | Welding electrode for Welding work on the shaft | 0.2 | kg | 4,745 ₹949 Lowest |
| 6.00 | Turing/Machining work on both the end of shaft as per bearing size on the lath machine | 3 | hrs | 160 ₹480 Lowest |
| 7.00 | Bearing housing welding and Turning work | 2 | nos. | 4,560 ₹9,120 Lowest |
| 8.00 | Connecting lead | 6 | mtr | 750 ₹4,500 Lowest |
| 9.00 | Cooling fan | 1 | nos. | 2,200 ₹2,200 Lowest |
| 10.00 | Fan cover | 1 | nos. | 1,450 ₹1,450 Lowest |
Tender Value
₹2.6 L
EMD Value
₹3,300
Closing Date
31 Jul 2025, 6:00 pmClosed
SO ENM
SO ENM OFFICE RAJRAPPA
rewinding repairing of the induction motor rewinding n overhauling of the defective ceiling fan fabrication n fitting of terminal block of induction motor under Rajrappa washery project
2025_CCL_339865_1
GM(R)/ SO(W)/Rjp/25-26/Et/48 dt 19.07.25
Open Tender
Electrical and Maintenance Works
Item Wise
30 days
RAJRAPPA
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,300
23 Sept 2025
19 Jul 2025
1 Aug 2025
21 Jul 2025
31 Jul 2025
21 Jul 2025
21 Jul 2025 - 24 Jul 2025
Amount
Rewinding/Repairing of 18.5 and 3.7 KW induction motor
Cost of SE Wire
Insulating material @15% of sl 1
Labour cost @15% of sl 1
Welding electrode for Welding work on the shaft
Turing/Machining work on both the end of shaft as per bearing size on the lath machine
Bearing housing welding and Turning work
Connecting lead
Cooling fan
Fan cover
Terminal Block complete set
Contractor"s profit
Scrap value
Ceiling fan rewinding/reparing and overhauling
Rewinding/Reparing of ceiling fan
Complete overhauling of running ceiling fan at site
Fabrication and mounting of the terminal block on the induction motor
Fabrication and mounting of the terminal block on the induction motor 18.5KW & 22KW
Fabrication and mounting of the terminal block on the induction motor 100KW & 125KW
Cooling fan 18.5KW & 22KW
Fan Cover 18.5KW & 22KW
Total impact of GST for the purpose of CTC
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .