Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC AMBAGAN BISHALGARH SEPAHIJALA TRIPURA PIN 799102 | BISHALGARH | SEPAHIJALA | TRIPURA | 799102 | ₹9.8 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹10.0 L+₹26,302 (2.69%)Rejected-AOC | ₹10.0 L+₹26,302 (2.69%) | L2 | Rejected-AOC Non-responsive |
| 3 | L3₹10.4 L+₹60,161 (6.15%)Rejected-AOC | ₹10.4 L+₹60,161 (6.15%) | L3 | Rejected-AOC Non-responsive |
| 4 | L4₹11.0 L+₹1.2 L (12.6%)Rejected-AOC DWS DIVISION KAMALPUR DHALAI TRIPURA | GOMATI | TRIPURA | 799104 | ₹11.0 L+₹1.2 L (12.6%) | L4 | Rejected-AOC Non-responsive |
| 5 | L5₹11.1 L+₹1.3 L (13.6%)Rejected-AOC RD AMBASSA SUB DIVISION DHALAI DISTRICT TRIPURA | DHALAI | TRIPURA | 799204 | ₹11.1 L+₹1.3 L (13.6%) | L5 | Rejected-AOC Non-responsive |
Tender Value
₹15.1 L
EMD Value
₹30,231
Closing Date
2 Jul 2026, 3:00 pmClosed
Executive Officer, Kamalpur NP, Kamalpur
O/O the Executive Officer, Kamalpur NP, Kamalpur
Construction of Market Stall near Old SDM corner at Netaji Chowmuhani of Kamalpur Nagar Panchayat, Dhalai Tripura, during the year 2025-26.
2026_Urban_74097_1
404/NP/EO/KMP/MMNUP/2025-26
Open Tender
Civil Works
Percentage
90 days
Kamalpur
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
Yes
₹30,231
Yes
25 Aug 2026
24 Jun 2026
2 Jul 2026
24 Jun 2026
2 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Total Work | |||||
| 1.1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be eveled and neatly dressed.
–All kinds of soil | 1 | Cum | 179.9 | ₹179.72 |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry With all lifts including spreading in horizontal layers, watering, grading to required slope ,ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1 | Cum | 1,177.3 | ₹1,176.12 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering
–All work upto plinth level:
1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 40 mm nominal size) | - | Cum | 10,691.7 | - |
| 4 | First class brick work in foundation and plinth including cost of all materials as required complete
In cement mortar 1:6 (1 cement : 6 fine sand ). | - | Cum | 9,515.2 | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement-
-All work upto plinth level:
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 12,073.8 | - |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centering, shuttering, finishing and reinforcement-
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 13,305.8 | - |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centering, shuttering, finishing and reinforcement-
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 13,584.5 | - |
| 8 | Centering shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns etc. for mass concrete with timber plank | 1 | Sqm | 333.9 | ₹333.57 |
| 9 | Centering shuttering including strutting, propping etc. and removal of form work for: Columns, Pillars, Piers, Abutments, Posts and Struts with wooden plank | - | Sqm | 570 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_75413.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_75413.xls
BOQ • 0.30 MB
DNIT_404.pdf
Tender Documents • 3.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .