Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹17.8 L+₹98,694.85 (5.88%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | OVERSEAS CONSTRUCTION AND LABOUR CONTRACT SAHAKARANA SANGHAM L1 | VENGAPPALLY LABOUR CONTRACT CO OPERATIVE SOCIETY L2 |
|---|---|---|---|---|---|
| 1.00ALT WORKS - Stone bund 1 m height -26 Rm sree shankara vidhya mandir school | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 22.1 | cum | 240 ₹5,304 Lowest | 250 ₹5,525 |
| 1.00 | OD1849/2026-2027:Dry rubble Masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactiness lines and levels cost and conveyance all materials labour charges etc.. | 27.3 | cum | 3,727 ₹1,01,747.1 Lowest | 4,000 ₹1,09,200 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 5.3 | sqm | 360 ₹1,908 Lowest | 375 ₹1,987.5 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 60.68 | kilogram | 104 ₹6,310.3 Lowest | 106 ₹6,431.66 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.3 | cum | 9,299 ₹12,088.7 Lowest | 9,500 ₹12,350 |
| 2.00Stone bund 1 m height- 20 Rm A D Yashoda Edappetty | |||||
| 2.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 17 | cum | 240 ₹4,080 Lowest | 250 ₹4,250 |
| 2.00 | OD1847/2026-2027:Dry rubble Masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactiness lines and levels cost and conveyance all materials labour charges etc.. | 21 | cum | 3,727 ₹78,267 Lowest | 4,000 ₹84,000 |
| 2.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 4.1 | sqm | 360 ₹1,476 Lowest | 375 ₹1,537.5 |
Tender Value
₹16.8 L
EMD Value
₹42,009
Closing Date
22 Sept 2026, 3:00 pmClosed
Deputy Director of Soil Conservation
Directorate of Soil Survey and Soil Conservation, 3rd and 4th Floor, Centre Plaza Building, Vazhuthacaud, Thiruvananthapuram
1. Stone bund 1m height - 150 m 2. Retaining wall 1.5 m height - 100 Rm
2026_DSSC_867293_1
SOIL/DSSSC/33/2026-2027
Open Tender
Civil Works - Others
Item Rate
210 days
Kalpetta municipality
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹42,009
Yes
24 Sept 2026
3 Sept 2026
24 Sept 2026
3 Sept 2026
22 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ALT WORKS - Stone bund 1 m height -26 Rm sree shankara vidhya mandir school | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 22.1 | cum | - | - |
| 1.002 | OD1849/2026-2027:Dry rubble Masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactiness lines and levels cost and conveyance all materials labour charges etc.. | 27.3 | cum | - | - |
| 1.003 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 5.3 | sqm | - | - |
| 1.004 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 60.68 | kilogram | - | - |
| 1.005 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.3 | cum | - | - |
| 2Stone bund 1 m height- 20 Rm A D Yashoda Edappetty | |||||
| 2.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 17 | cum | - | - |
| 2.002 | OD1847/2026-2027:Dry rubble Masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactiness lines and levels cost and conveyance all materials labour charges etc.. | 21 | cum | - | - |
| 2.003 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 4.1 | sqm | - | - |
stage.html
html • 0.02 MB
finance_1468543.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1468543.xls
BOQ • 0.33 MB
GandhinagarBidDocument.pdf
Tender Documents • 4.07 MB
GandhinagarDateExtensionCorrigendum.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .