| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-Finance | L1 | Accepted-Finance First Lowest | |
| 2 | L2₹5.1 L+₹735.64 (0.14%)Accepted-Finance | L2 | Accepted-Finance Second Lowest |
| Sl No | Description | Qty | Unit | UNITECH CONSTRUCTION L1 | Ramakrishnan L2 |
|---|---|---|---|---|---|
| 1.00CIVIL WORKS | |||||
| 1.00 | 2.28.1
Surface dressing of the ground including removing vegetation and in-equalities not
exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5
m.All kinds of soil | 500 | sqm | 35 ₹17,500 Lowest | 35 ₹17,500 Lowest |
| 1.00 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 5.13 | cum | 257 ₹1,319.18 Lowest | 258 ₹1,324.31 |
| 1.00 | 5.9.5
Centering and shuttering including strutting, etc. and removal of form for:Lintels,
beams, plinth beams, girders bressumers and cantilevers | 26.27 | sqm | 761 ₹19,989.95 Lowest | 763 ₹20,042.48 |
| 1.00 | 5.1.2
Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm
nominal size derived from natural sources) | 2.35 | cum | 10,468 ₹24,610.27 Lowest | 10,489 ₹24,659.64 |
| 1.00 | 5.22.6
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing
in position and binding all complete upto plinth levelThermo - Mechanically Treated
bars of grade Fe-500D or more | 271.28 | kg | 112 ₹30,383.36 Lowest | 112 ₹30,383.36 Lowest |
| 1.01 | 5.3
Reinforced cement concrete work in beams, suspended floors, roofs, having slope up
to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size
derived from natural sources). | 1.04 | cum | 13,415 ₹13,965.01 Lowest | 13,442 ₹13,993.12 |
| 1.01 | 5.9.7
Centering and shuttering including strutting, etc. and removal of form for:Stairs,
(excluding landings ) except spiral - staircases) | 11.61 | sqm | 823 ₹9,555.03 Lowest | 825 ₹9,578.25 |
| 1.01 | 50.6.2.2
Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or
nearest available size confirming to IS 2185 part I of 1979 for super structure up to
floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 8.42 | cum | 7,699 ₹64,802.48 Lowest | 7,714 ₹64,928.74 |
| 1.01 | 13.1.1
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 259.02 | sqm | 369 ₹95,576.9 Lowest | 370 ₹95,835.92 |
Tender Value
₹5.1 L
EMD Value
₹12,900
Closing Date
26 Sept 2026, 4:00 pmClosed
REGIONAL ENGINEER- 8111882868
KERALA STATE NIRMITHI KENDRA OPP GOVT POLYTECHNIC COLLEGE STAFF QUARTERS KODUMBU P O PALAKKAD
RCC, Solid Block Masonry, Plastering, Painting, and Fencing
2026_KSNK_871141_1
KSN/T/PKD/CWTRSGCC-77(R2)/2026
Open Tender
Civil Works - Others
Item Rate
90 days
Chittur
Refer NIT
5 documents required · 5 mandatory
₹1,029
₹12,900
Yes
5 Oct 2026
18 Sept 2026
28 Sept 2026
18 Sept 2026
26 Sept 2026
18 Sept 2026
18 Sept 2026 - 26 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORKS | |||||
| 1.001 | 2.28.1
Surface dressing of the ground including removing vegetation and in-equalities not
exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5
m.All kinds of soil | 500 | sqm | - | - |
| 1.002 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 5.13 | cum | - | - |
| 1.003 | 5.9.5
Centering and shuttering including strutting, etc. and removal of form for:Lintels,
beams, plinth beams, girders bressumers and cantilevers | 26.27 | sqm | - | - |
| 1.004 | 5.1.2
Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm
nominal size derived from natural sources) | 2.35 | cum | - | - |
| 1.005 | 5.22.6
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing
in position and binding all complete upto plinth levelThermo - Mechanically Treated
bars of grade Fe-500D or more | 271.28 | kg | - | - |
| 1.006 | 5.3
Reinforced cement concrete work in beams, suspended floors, roofs, having slope up
to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size
derived from natural sources). | 1.04 | cum | - | - |
| 1.007 | 5.9.7
Centering and shuttering including strutting, etc. and removal of form for:Stairs,
(excluding landings ) except spiral - staircases) | 11.61 | sqm | - | - |
| 1.008 | 50.6.2.2
Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or
nearest available size confirming to IS 2185 part I of 1979 for super structure up to
floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 8.42 | cum | - | - |
| 1.009 | 13.1.1
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 259.02 | sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Agreement.pdf
Tender Documents • 0.20 MB
TC.pdf
Tender Documents • 0.63 MB
EP.pdf
Additional Documents • 0.01 MB
BOQ_1476351.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .