| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAdmitted-Finance | ₹4.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.3 Cr+₹4.3 L (1.02%)Admitted-Finance | ₹4.3 Cr+₹4.3 L (1.02%) | L2 | Admitted-Finance |
| 3 | L3₹4.3 Cr+₹6.2 L (1.47%)Admitted-Finance | ₹4.3 Cr+₹6.2 L (1.47%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MEGHALAYA CONSTRUCTION AND SUPPLY CO. L3 | aarav enterprises L1 | GAUTAM ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00 | SCHEDULE 'A' PART-I (Provn of 03 x seated toilet block (Building wk)
Earth work in excavation in trenches n'exc 1.5 m wide and n'exc 1.50 mtr in depth for fdn etc and getting out in all kinds of soil). | 5.55 | Cum | 3,596.4 ₹3,596.4 | 3,552 ₹3,552 Lowest | 3,563.1 ₹3,563.1 |
| 2.00 | Providing and laying in position PCC 1:4:8 in fdns, filling and mass concrete- All work up to plinth level. | 1.11 | Cum | 15,789.75 ₹15,789.75 | 15,762 ₹15,762 Lowest | 15,784.2 ₹15,784.2 |
| 3.00 | Providing and laying for RCC 1:2:4 (use 20mm graded aggregate) in fdns, plinth beams, base of columns- All work upto plinth level. | 3.33 | Cum | 54,828.45 ₹54,828.45 | 54,778.5 ₹54,778.5 Lowest | 54,811.8 ₹54,811.8 |
| 4.00 | M/L for centering and shuttering including strutting, propping etc and removal of form for lintels, beams, plinth beams, girders, bressumers and cantilevers. | 15.3 | Sqm | 21,114 ₹21,114 | 20,655 ₹20,655 Lowest | 21,037.5 ₹21,037.5 |
| 5.00 | M/L for steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete . (use Thermo-Mechanically Treated bars.) | 667.26 | Kg | 1,40,124.6 ₹1,40,124.6 | 1,33,452 ₹1,33,452 Lowest | 1,36,788.3 ₹1,36,788.3 |
| 6.00 | M&L for brick work with F.P.S bricks of class designation 75 in foundation and plinth in cm 1:6. | 4.92 | Cum | 73,790.16 ₹73,790.16 | 73,701.6 ₹73,701.6 Lowest | 73,750.8 ₹73,750.8 |
| 7.00 | M& L for half brick work with common burnt clay F.P.S (non modular) bricks of class designation 7.5 in plinth level in Cement mortar 1:4 (1 cement : 4 coarse sand). | 56.28 | Sqm | 1,30,288.2 ₹1,30,288.2 | 1,29,444 ₹1,29,444 Lowest | 1,30,006.8 ₹1,30,006.8 |
| 8.00 | M&L for plastering 15mm thick on the rough side of single or half brick wall of mix use cm 1:4 for externally. | 86.91 | Sqm | 64,313.4 ₹64,313.4 | 63,444.3 ₹63,444.3 | 37,545.12 ₹37,545.12 Lowest |
| 9.00 | M&L for plastering 12 mm thick on the rough side of single or half brick wall of mix use cm 1:6 for internally. | 105.99 | Sqm | 78,962.55 ₹78,962.55 | 78,432.6 ₹78,432.6 Lowest | 78,644.58 ₹78,644.58 |
| 10.00 | Returning, filling in, available earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth , consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | 4.47 | Cum | 2,570.25 ₹2,570.25 | 2,547.9 ₹2,547.9 Lowest | 2,556.84 ₹2,556.84 |
Tender Value
₹4.0 Cr
EMD Value
₹8.1 L
Closing Date
14 Mar 2026, 4:00 pmClosed
SO-1 (Wks) HQ DGAR, Laitkor Shillong
Engr Branch HQ DGAR Laitkor Shillong
Provn of 03 x (03 seated toilet block) and 03 x (03 seated bath block) alongwith allied services and devp wks for Mon of 27 AR
2026_ARMHA_899695_1
VIII.11014/9277/7 Sect/31 COBs/Engr/2026
Open Tender
Civil Works
Works
365 days
27 AR
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,500
HQ DGAR
₹8.1 L
2 Apr 2026
21 Feb 2026
16 Mar 2026
21 Feb 2026
14 Mar 2026
21 Feb 2026
21 Feb 2026 - 12 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SCHEDULE 'A' PART-I (Provn of 03 x seated toilet block (Building wk)
Earth work in excavation in trenches n'exc 1.5 m wide and n'exc 1.50 mtr in depth for fdn etc and getting out in all kinds of soil). | 5.55 | Cum | - | - |
| 2 | Providing and laying in position PCC 1:4:8 in fdns, filling and mass concrete- All work up to plinth level. | 1.11 | Cum | - | - |
| 3 | Providing and laying for RCC 1:2:4 (use 20mm graded aggregate) in fdns, plinth beams, base of columns- All work upto plinth level. | 3.33 | Cum | - | - |
| 4 | M/L for centering and shuttering including strutting, propping etc and removal of form for lintels, beams, plinth beams, girders, bressumers and cantilevers. | 15.3 | Sqm | - | - |
| 5 | M/L for steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete . (use Thermo-Mechanically Treated bars.) | 667.26 | Kg | - | - |
| 6 | M&L for brick work with F.P.S bricks of class designation 75 in foundation and plinth in cm 1:6. | 4.92 | Cum | - | - |
| 7 | M& L for half brick work with common burnt clay F.P.S (non modular) bricks of class designation 7.5 in plinth level in Cement mortar 1:4 (1 cement : 4 coarse sand). | 56.28 | Sqm | - | - |
| 8 | M&L for plastering 15mm thick on the rough side of single or half brick wall of mix use cm 1:4 for externally. | 86.91 | Sqm | - | - |
| 9 | M&L for plastering 12 mm thick on the rough side of single or half brick wall of mix use cm 1:6 for internally. | 105.99 | Sqm | - | - |
| 10 | Returning, filling in, available earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth , consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | 4.47 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.65 MB
Tendernotice_2.pdf
PDF • 26.17 MB
BOQ_945683.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .