| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC KRISHNA SREYAS LANE CHERUPARAMBATH ROAD ELAMKULAM VILLAGE KADAVANTHRA ERNAKULAM ERNAKULAM KERALA 682020 | ERNAKULAM | KERALA | 682020 | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.0 L+₹3.0 L (36.8%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
20 Aug 2022, 3:00 pmClosed
Prasobh P S
63/3466, Udaya Nagar Road, Gandhi Nagar, Kochi -682020.
DRY DOCK REPAIRS/ AFLOAT REPAIR OF STEEL MARINE CRAFTS OF KSINC, FOR TWO YEARS
2022_KSINC_502445_1
KSINC/Tender/12/2022-23
Open Tender
Marine Works
Piece-work
30 days
KADAVANTHRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,850
Yes
₹1 L
Yes
3 Oct 2023
6 Aug 2022
22 Aug 2022
6 Aug 2022
20 Aug 2022
6 Aug 2022
Amount
(a)Surface preparation, Sand blasting to S.A 2.5 standard including the cost of material (Hull of repairing vessels), air compressor will be hired by KSINC.
(b)Surface preparation, Sand blasting to S.A 2.5 standard including the cost of material for new M.S plates/ angles, air compressor will be hired by KSINC.
Surface preparation other than sand blasting (Chipping, scrapping)
(a)For external areas
(b)For inner sides of tanks / compartments
Removing the thickly formed oyster coating and other vegetation growth from the underwater portion of the vessel including cleaning the vessel complete as per the instruction of the Corpn. Officers.
a) Painting per coat (Hand brush painting)
b) 1. Painting per Coat (Spray painting)
2. Applying putty for enabling spray painting.
(a)Supplying and welding (using IS 6013/ IS 7018 marine quality welding rod) with new various thickness plate of IS 2062 GR B quality for beam/ gazette and other plate work of original size and shape to the various portions of the vessel after heating and bending to shape, V cut on the matting edge of the plate and three layer welding on both sides together. The rate including the welding charges, tools, plants, scaffolding other incidental expenses etc complete as per the direction of KSINC officers. (Entire quantity of welding rod supply should be get inspected and designated by KSINC.
(b)Supplying and welding (using IS 6013/ IS 7018 marine quality welding rod) with new various size of MS round bar, angles, flats and shape to the various portion on the vessel (already removed from the damaged portion of the vessel) after heating and bending to shape, V cut on the matting edge of the plate and three layer welding on both sides together. The rate including the welding charges, tools, plants, scaffolding other incidental expenses etc complete as per the direction of KSINC officers.
(c)Supplying and welding (using IS 6013/ IS 7018 marine quality welding rod) with various size of M.S items and fabrication of skylight, Air cowl, doors, and other out fittings. The rate including the welding charges, tools, plants, scaffolding other incidental expenses etc complete as per the direction of KSINC officers.
Welding Zinc anodes on the underwater portion of the hull after removing old brackets.
(i)Removing the old rubber fender after cleat cutting and refitting new rubber fender with new cleats at regular intervals as per the direction of KSINC Officers. Fenders will be supplied by KSINC.
(ii)Removal and refitting of wooden / rubber fenders for carrying out steel fabrication.
Fitting split pipe fender with new pipe 6” or 8” with brackets spaced at 300 mm at straight portion and 500 mm maximum at curved areas.
Cutting and removing corroded and damaged pipe of following sizes with or without flanges from sea water / fresh water lines in different parts of the vessel without damaging remaining parts. Fabricating and welding using best quality B class GI pipe, bend etc, in place of removed portion in same shape with or without flanges and coupling the pipes using new bolts and nuts, joints etc direction of dept officers.
Welding per run (using IS 6013/ IS 7018 grade electrodes)
Gas cutting
Gouging
Grinding
Buffing
Fixing doublers (4mm/6mm/8mm)
Renewal of exhaust pipe with or without flanges, bends, brackets etc.
Removal and refitting of exhaust pipe with or without flanges, bends, brackets etc.
Renewal of Single Bollard on doublers using:
Renewal of Double Bollard on doublers using:
Renewal of Towing post:
Fabricating, supplying and fixing letters or numbers by welding, using M.S plate in the vessel as per the direction of department officers.
1. Renewal of air vent 1 ½ “ dia
2. Renewal of air vent 1 ½ “ dia
3. Renewal of air vent 6“& 8”dia suitable for oil barges.
1. Removal and refitting of air vent 1 ½ “ dia
2. Removal and refitting of air vent 1 ½ “ dia
3. Removal and refitting of air vent 6“& 8”dia suitable for oil barges.
Making of Bilge headers & fittings of its valves.
Removing both anchor with cable (stud link chain) from the winch. Chipping, scrapping, wire brushing, cleaning, free the swivel links and applying red oxide and painting the chain and placing chain with anchor on the winch as per the direction and satisfaction of KSINC officers.
Sea chest making & fixing with drilled cover plate with bolting arrangements.
Strum box making for bilge suction lines.
(a) Concreting decks and floors with wall tiles and floor tiles fitting (excluding material)
(b) Bathroom W.C and pipe line removing and refitting
(c) Bathroom W.C new fitting in position with all lines
Engine room bilge cleaning after removal & fitting of platform plates.
Renewal of scuppers
Fixing of Pipe rails & stanchions on doubler plates on deck.
Berth frame making and fixing (6’x 21/2’)
Renewal of 4mm / 5mm chequered plates with frames and fastness.
Removal and refitting of 4 mm / 5mm Chequered plates
Renewal of Leuvre type windows size (40x40) cms.
Filling pits by welding.
Rope guard for propeller shaft.
Accommodation / hylum sheet / Sun mica/ ceiling plywood renewal / side paneling renewal with new M.S cleets, wooden reapers and 6mm/4mm new plywood without causing damage to other parts, after removing the old damaged hylum sheet / plywood.
Removal & refitting of hylum sheet / Sun mica/ plywood (6mm/4mm) without causing damage to other parts for enabling steel works on those areas.
Stern tube fitting and alignment.
Loading of main engine to the vessel, erecting and aligning. (Rate to be quoted including all the modifications / steel fabrication works which may occur to align the gear box with the main engine. The replaced engine to be shifted to the yard covered area.)
Loading of gear box to the vessel, erecting and aligning to the main engine. (Rate shall include all the modifications / steel fabrication works which may occur to align the gear box with the main engine. The replaced gear box to be shifted to the yard covered area.)
New Hydraulic steering remote control fitting, testing and commissioning.
Semi rotary pump fixing with pipes and flanges.
Opening up of the man hole cover of diesel service tank/lube oil storage tank and making gas free after drain out existing diesel oil / lubrication oil to be barrel cleaning the tank and refill diesel oil lube oil from barrels to the tank and close the man hole cover using new bolt and nut, joint etc, as per the direction of Corpn. officers
Opening up the manhole cover of freshwater storage tank of various capacities. Removing the sediments in the tank and cleaning the complete surface of the tank. Washing (coating) the inside of the tank using white cement refit the man hole cover using new bolt and nut, joints etc as per the direction of dept officers.
Making and supplying and providing by welding tyre fender, tying hook, along with ring using 20mm dia M.S rod as per the direction and satisfaction of dept officers.
Removing the glasses of the windows in the wheel house / accommodation, buffing the glass surface, replacing damaged rubber beadings, locks, new rubber beadings screw of original size, fixing with the glass already removed as per the direction and satisfaction of Corporation officers.
Cutting and removing the broken and damaged fender holding brackets, bolts, nuts and wooden bits. Welding a pair of M.S clits size (100mmx100mmx8mm) at an interval of 42cm between the adjacent cleat and around the vessel. Fixing firmly the wooden fender in between the cleats after making 20mm bolt with washer etc complete as per the direction of Corpn, officers (fender of 15cm x 20cm). Fenders will be supplied by KSINC.
Clear removal of the old plastering in various places in the vessel and plastering the cement mortar with 1:3 15 mm thick one coat on various places of the vessel as per the direction of Corpn. Officers. (including material)
Damaged manhole and cover renewal as per the existing size and fitting with packing etc
Fresh water tank fixing and connections to E/R, Kitchen & Toilet excluding cost of tank & fittings.
Propeller shaft bracket fixing & aligning.
A bracket removing and refitting correcting alignment.
Damaged handrails renewal 1” and 1 ½“GI pipe renewal.
Sea chest & gratings removal, cleaning and refitting
Vertical ladders making to internal compartment of the vessel by using 35 x 35mm M.S angles.
Sanitary pipes renewal
Rudder stuffing box new making
Rudder stock removing and refitting
Steering chain pulley removing and refitting
Auxiliary engine old foundation removing and refitting
Bilge line removing, cleaning (various sizes) and fitting in position with new packings and fasteners
Corrugated sheet old removing and new fitting in position
Providing thermal insulation including pin welding
200 GSM FRP layering
8” dia and 6” dia cargo lines pressure testing and certification (for petroleum carriage barges)
200 MT Barge
300 MT Barge
650 MT Barge
Removal and refitting of pipelines of following sizes with or without bends, flanges etc in different parts of the vessel without damaging the remaining parts using new bolts, nuts, joints etc as per direction of the departmental officers.
Cleaning and gas freeing of Cargo Tank’s, forepeak tank, cofferdam, cargo pump room and cargo pipelines of Oil barge to the satisfaction and certification of officials of P.E.S.O.
200 MT Barge
300 MT Barge
650 MT Barge
Water jet cleaning: - After docking, the vessel shall be thoroughly cleaned to remove any scales, dirt, marine growth etc by high pressure water jet.
Water jet washing: - After docking, the vessel shall be thoroughly washed by high pressure water jet.
KRISHNA MARINE ENGINEERING
Bidder Name
MARETEK INDIA PVT LTD
KRISHNA MARINE ENGINEERING
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .