Loading…
Loading…
Tender Value
₹10.0 L
EMD Value
₹10,000
Closing Date
28 Sept 2026, 6:00 pmDue tomorrow
Assistant Manager (North West Zone)
Providing Supplying & Laying Wetmix at Drainage line & Water line Exacavation Area And Labour work of laying Hotmix Material Patch work at TP2 Area And Other Area in Ghatlodia ward North West Zone (ARC)
346553
06/2025-26 T No 47
Open
Civil Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹10,000
19 Sept 2026
19 Sept 2026
19 Sept 2026
28 Sept 2026
19 Sept 2026
Name of Work :- Providing , Supplying & Laying Wetmix at Drainage line & Water line
Exacavation Area And Labour work of laying Hotmix Material Patch work at TP-2 Area And
Other Area in Ghatlodia ward North West Zone. (A.R.C.)
Sr. Quantity Item Description Rate Per Amoun
Extra rate over item of excavation of earth for
excavation of asphalt pavement of thickness up to
1 meter including demolishing the asphalt
carpet,metal,soiling etc.comp. with stacking the material
as directed. AMC SOR Year 2016 (As On website)
a 20.00 a) up to 0.20 meter thickness (By Manual) 80.00 smt
b)Up to 0.30 meter (By Breaker Machine including cost of
b 50.00 operator, fuel, & transportation etc complete. 200.00 smt
c) 0.30 meter & above (By Breaker Machine including
c 10.00 cost of operator, fuel, 350.00 smt
& transportation etc complete.
Barricading the entire break down or excavated area on
rental basis using wooden ballies / M.S.angles at max.
2.00 meter centre to centre, C.G.I. Sheet, reflective
paint / Board out side to avoid accident & for smooth
traffic diversion & movement including cautionary board
2 50.00 etc. Item also includes for making temporary sufficient 90.00 Rmt
nos of lighting arrangement through out the work with
necessary required arrangement. ..The same shall be
removed after completion of work. (Only for break
down work from start to complete) (Based on
Drainage SOR 2009-10)
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
3 400.00 excavated stuff and depositing on the road side slope as 67.94 Cu.M
directed upto 50Mt.lead. (EXECUTED WITH MECHANISED
EFFORTS / MACHINARY) SOR -(Jan- 2021/22 AMC)
Conveyance charge of earth, lime, murrum,
buildingrubbish, manure, garbage, sludge, excavated
4 rock, fly ash,aggregates of any kind Including spreading &
levelling etc. complete.
Sta.5 5 SOR -(Jan- 2021/22 AMC)
a 10.00 a) Lead up to 3 Km. 42.97 CMT
b 10.00 b) Lead up to 4 Km. 50.98 CMT
c 10.00 c)Lead up to 5 Km. 58.71 CMT
d 10.00 d)Lead up to 10 Km. 87.96 CMT
e 500.00 e)Lead up to 15 Km. 117.21 CMT
Rolling of earthwork in layers with power roller including
5 200.00 filling in depressions which occur during the process. 12.50 Cmt
SOR ‐(Jan‐ 2021/22 AMC)
Watering of earth work as directed. SOR ‐(Jan‐ 2021/22
AMC) SOR ‐(Jan‐ 2021/22 AMC)
Construction of granular Sub base by providing coarse
graded material , spreading in uniform layers with motor
grader on prepared surface mixing by mix in place
7 method with front end loader at OMC and compacting 738.00 Cmt
with vibratory roller to achieve the desired density,
complete as per Clause 401. For all grade SOR ‐(Jan‐
a 90.00 (A) Production & Supply of GSB (Natural) 704.00 Cmt
b 90.00 (B) Laying of GSB (Natural) 34.00 Cmt
Construction of granular Sub base using crusher run,
spreading in uniform layers with motor grader on
prepared surface mixing by mix in place method with front
8 end loader at OMC and compacting with vibratory roller to 1467.00 Cmt
achieve the desired density, complete as per Clause
For all grade SOR ‐(Jan‐ 2021/22 AMC)
10.00 Production & Supply of GSB (Crusher Run) 1437.00 Cmt
10.00 Laying of GSB (Crusher Run) 30.00 Cmt
Providing, laying, spreading and compacting graded
stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by tipper
9 to site, laying in uniform layers in sub‐ base / base course 1710.00 Cmt
on well prepared surface and compacting with vibratory
roller to achieve the desired density as per Codal
Provision. SOR ‐(Jan‐ 2021/22 AMC)
A 310.00 Production & Supply of WMM 1975.00 Cmt
B 310.00 Laying of WMM 35.00 Cmt
Providing and applying primer coat with cationic bitumen
emulsion SS1 grade conforming to ASTM GRADE on
prepared surface of wet mix macadam including clearing
of Wet mix macadam surface with air compressor to
remove all loose material other foreign material. The
10 1300.00 primer shall be sprayed uniformly at the rate of 0.70‐1.0 40.04 Smt
kg/sqm. It shall be applied by a self‐propelled or towed
bitumen pressure sprayer, equipped for spraying the
material uniformly at a specified rate. No dilution or
heating at site of RS1 bitumen emulsion shall be
permitted. SOR ‐(Jan‐ 2021/22 AMC)
Labour charges for hand laying hotmix material DBM/BC
on the road surface in line & level incl. cleaning the
surface with air compressor and if require re carting
material by JCB at necessory place of work also rolling
with 8 ‐ 10 tonnes vibratory roller and Dust spreading on
BC after rolling, rate also includes re‐carting of Hotmix
material from place of Work / AMC store to Location of
laying having narrow width like chawls, poles, gamtal
complete SOR ‐(Jan‐ 2021/22 AMC)
Hiring of Tractor with trolley considering 8 Hrs. As
working Day hours inclu. Driver (GWSSB SOR‐2022‐23
Section‐2E‐ Miscellenous Item No.7) SOR ‐(Jan‐ 2021/22
BASIC RATES OF LABOUR
13 (R&B Building SOR Year 2024‐25)
A 40.00 (A) Labour charges ‐ Excavator (Item Code No.L012) 566 NO
(B) Labour charges ‐ Mazdoor (Female) (Item Code
(C) Labour charges ‐ Mazdoor (Male) (Item Code
Providing & Supplying JCB Machine on rental basis in
case of emergency situation and break down type work &
also during unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel
and operating charges and stacking of useful & non-
14 18.00 useful materials separately up to store. (No payment 600.00 hr
should be allowed for non working condition of
machinery and for pipe line excavation and laying
work) ( Based on Previously approved rate by C E sir
) SOR ‐(Jan‐‐ 2021/22 AMC)
Bitumen Cutting Labour charge of cutting in
bituminous pavement. Cutting to be done with heavy
duty tandom cutting machine consist of diamond blade.
Minimum cutting depth shall be 75 mm from the finished
level. Cutting shall be perfeclty in line. The width and
depth of the removal of asphalt towards kerb stone
shall be as per the drawing. Bitumen shall be
carefully removed so that the the cutting edge towards
15 17.00 the road should not be disturbed. The work of removal of 113.39 Rmt
the asphalt will be considered in this item as running
meter of the cutting done by machine. One cutting line will
be considered per length of the kerb stone. Bitumen and
other debris shall be disposed within 10.0 km. as per the
instruction of the engineer in charge. Surroundings shall
be cleaned to the satisfaction of the engineer in charge.
SOR ‐(Jan‐ 2021/22 AMC)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
T.No.47 TP-2 Abstract Wetmix Tender.pdf
T.No. 47 TP-2 Wetmix and Patchwork.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .