| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VINOD KUMAR JUYAL L1 |
|---|---|---|---|---|
| 1.00 | Hill side cutting in all type of soil, rock, shale, earth & boulder etc. what so ever met as site including removal and disposal of surplus excavated material and debries as directed by Engineer in charge to make the road way as per plan, L-section and PWD specifications including supply of all material, labour and T&P etc. required for proper completion of the work. | 1 | One Job | 7,30,000 ₹7,30,000 Lowest |
| 2.00 | Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineeri-n-charge. (As per PWD Uttarakhand specifications) | 135 | Cum | 1,398 ₹1,88,730 Lowest |
| 3.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 405. | 1,275.5 | Cum | 2,219 ₹28,30,334.5 Lowest |
| 4.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. | 885.5 | Cum | 2,391 ₹21,17,230.5 Lowest |
| 5.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 885.5 | Cum | 2,548 ₹22,56,254 Lowest |
| 6.00 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 11,812.5 | Sqm | 45 ₹5,31,562.5 Lowest |
| 7.00 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 | 11,812.5 | Sqm | 14.5 ₹1,71,281.25 Lowest |
| 8.00 | 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A as per Technical Specification Clause 508 (VG 10) | 11,812.5 | Sqm | 180 ₹21,26,250 Lowest |
| 9.00 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A as per Technical Specification Clause 510 (VG 10) | 11,812.5 | Sqm | 61 ₹7,20,562.5 Lowest |
| 10.00 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 484 | Cum | 362 ₹1,75,208 Lowest |
Tender Value
Refer Docs
EMD Value
₹3.4 L
Closing Date
24 Jul 2023, 3:00 pmClosed
SE 12TH CIRCLE PWD PAURI
SE 12TH CIRCLE PWD PAURI
Bitumenous work of Dhauntiyal Buchakhal Sisaldi motor road in Zehrikhal block of Lansdown constituency of Pauri Garhwal under State sector.
2023_pwd_60500_3
4242/141YATA-12/2023-24 DATE 30-06-2023
Open Tender
Civil Works
Item Wise
360 days
DUGADDA
AS PER TECHNICAL BID
3 documents required · 3 mandatory
₹5,900
EE CD PWD DUGADDA
₹3.4 L
SE 12TH CIRCLE PWD PAURI
24 Aug 2023
5 Jul 2023
24 Jul 2023
5 Jul 2023
24 Jul 2023
7 Jul 2023
6 Jul 2023
Amount
Hill side cutting in all type of soil, rock, shale, earth & boulder etc. what so ever met as site including removal and disposal of surplus excavated material and debries as directed by Engineer in charge to make the road way as per plan, L-section and PWD specifications including supply of all material, labour and T&P etc. required for proper completion of the work.
Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineeri-n-charge. (As per PWD Uttarakhand specifications)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 405.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A as per Technical Specification Clause 508 (VG 10)
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A as per Technical Specification Clause 510 (VG 10)
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specification.
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Surface Drains in Soil Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC 1:3:6
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. As per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specification.
White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915.
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 (1:5)
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202. (The reinforcement steel shall be procured from original (primary) steel producers as per clause no.2011.3.1 of MORD specifications (First Revision'2014) and IS 1786:2008 clause no. 1.6)
Providing and laying reinforced cement concrete in substructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 (R.C.C M 25)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2:4) in water way
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .