Tender Value
₹36.9 L
EMD Value
₹37,000
Closing Date
19 Aug 2026, 6:00 pmClosed
Executive Engineer, Navsari (R&B) Division, Navsari
Package : Vansda Section 01 CR to Various Road Under Chikhli (R & B) Sub Division Dist. Navsari (Jungle Cutting, White Lime & Geru Washing To Tree, Painting of km Stone, Hectometer Stone, Boards and repairs to side shoulders)
333505
10 of 2026-27
Open
Civil Works - Roads
Works
Navsari
9 documents required · 9 mandatory
₹1,500
Executive Engineer, Navsari (R&B) Division, Navsari
₹37,000
10 Aug 2026
10 Aug 2026
10 Aug 2026
19 Aug 2026
10 Aug 2026
Name of work : Package : Vansda Section 01 CR to Various Road Under Chikhli (R & B) Sub Division Dist.
Navsari (Jungle Cutting, White Lime & Geru Washing To Tree, Painting of km Stone, Hectometer Stone, Boards
and repairs to side shoulders)
Memorandum showing items of work to be carried out
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. estimated but according to
may be more or In figure estimated
less Rs. Ps. quantities
1 7.70 Hec. Clearing and grubbing road land 84495.12 Rupees Eighty Hec.
including uprooting rank vegetation grass Four Thousand
bushes,shrubs,sapling and trees girth up Four Hundred
to 300 mm removal of stumps of trees cut Ninety Five and
earlier and disposal of unserviceable Paise Twelve
materials (A) By manual means in area of only
2 662.00 No Applying two coat of geru and lime on 77.87 Rupees Seventy No
tree up to 1.2mt. height (0.30 mt. lime, Seven and Paise
0.90mt. geru) including cost of material Eighty Seven
labour etc. complete. only
3 10.00 No Providing and fixing ordinary kilometer 1293.39 Rupees One No
stone of precast C.C. 1:2:4 including Thousand Two
necessary reinforcement as per I.R.C. type Hundred Ninety
design fixing in C.C. 1:4:8 including Three and Paise
painting and lettering etc. complete for Thirty Nine only
4 23.00 No Painting and lettering with enamel paint 3- 205.29 Rupees Two No
coats etc complete.(i) Ordinary K.M. Hundred Five
Stone for N.H. S.H. and M.D.R. and Paise
5 31.00 No Providing and fixing hectometer as per 356.50 Rupees Three No
I.R.C. type design including painting Hundred Fifty
lettering etc. complete fixing in C.C. Six and Paise
1:5:10. Fifty only
6 88.00 No Painting and lettering with enamel paint 3- 52.79 Rupees Fifty No
coats etc complete.(iv) Hectometer stone. Two and Paise
7 30066.12 Sqmt Distempeing (Two coats) with oil bound 73.70 Rupees Seventy Sqmt
distemper of approved brand and Three and Paise
manufacture and of required shade on Seventy only
wall surfaces to give an even shade, over
and including a priming coat with
distemper primer of approved brand and
manufacture after thoroughly brushing the
surface free from mortar dropping and
other foreign matter and also including
preparing the surface even and sand
papered smooth.
8 3977.00 Sqmt Scraping oil paint from steel and other 50.55 Rupees Fifty and Sqmt
metal surface and making the surface Paise Fifty Five
even (with Hand Scraping.) only
9 3977.00 Sqmt Painting one coats (excluding priming 45.65 Rupees Forty Sqmt
coat) on previously painted steel and Five and Paise
other metal surface with enamel paint, Sixty Five only
brushing to give an even shade including
cleaning the surface of all dirt, dust and
other foreign matter
10 122.00 No Repairing including make it in line and 101.00 Rupees One No
level using concrete 1:2:4 where required Hundred and
& Colour Road signages board'angles as One only
directed by engineer in charge
11 22650.00 Sqmt Repairing & Rolling Side Sholders and 15.37 Rupees Fifteen Sqmt
road side drain using JCB,Grader,power and Paise Thirty
roller,Broomer and labour including Seven only
addding approx 10% Quaryy spall and
make it line and level with Camber as
directed by engineer in charge
Rupees Thirty Six Lacs Ninety Four Thousand Four Hundred Twenty Seven and Paise Ninety only
I/We am/are willing to carry out the work at _______ % above/below ( percent should be
written in figures and in words ) of the estimated rates mentioned above. Amount of my/our
tender works out as under.
*Estimated amount *Estimated amount
put to tender Rs. 36,94,427.90 put to tender Rs.
Deduct ____ % below Rs. _________ Add ____ % above Rs. _________
Net Rs. _________ Total Rs. _________
*( Please strike out which ever is not applicable )
Note 1:- All work shall be carried out as per public work department hand book and other specifications of
Division or as directed
Note 2:- Rates quoted include clearance of site (Prior commencement of work and its close) in all respects and
hold good for work under all condition, site, moisture/ weather etc
Note 3:- The Contractor shall exhibit a board as per Government Circular No. BDG/ 3277/ 1657/ N Dated
26/1/1997 S (M.GUJ) with detailed specification and details of work and amount involved at site
without any payment as directed by the Engineer-in-charge.
Signature of Bidder
Deputy Executive Engineer Executive Engineer
Chikhli (R&B) Sub Division Navsari (R&B) Division
Chikhli Navsari
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. SBD - Vansda Pkg.-1.pdf
1.1 GR.pdf
1.2 Performance Bond and Bitumen date.pdf
2. BOQ - Vansda Pkg.-1.pdf
3. Specification - Vansda Pkg.-1.pdf
4. Self - Site Visit Declaration Certificate.pdf
5. Special Condition (1).pdf
6. Special Condition (2).pdf
7. Road List - Vansda Pkg.-1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .