Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAdmitted-Finance | ₹4.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.0 Cr+₹75.0 L (17.5%)Admitted-Finance | ₹5.0 Cr+₹75.0 L (17.5%) | L2 | Admitted-Finance |
| 3 | L3₹5.1 Cr+₹77.7 L (18.1%)Admitted-Finance | ₹5.1 Cr+₹77.7 L (18.1%) | L3 | Admitted-Finance |
| 4 | L4₹6.2 Cr+₹1.9 Cr (44.2%)Admitted-Finance | ₹6.2 Cr+₹1.9 Cr (44.2%) | L4 | Admitted-Finance |
| 5 | L5₹6.5 Cr+₹2.2 Cr (52.2%)Admitted-Finance | ₹6.5 Cr+₹2.2 Cr (52.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | North East Engineering n Construction L2 | ASSOCIATED WORKS INFRA PVT. LTD. L4 | M/s P.K.M. ERECTORS L1 | MWIKHWM OWARY L3 | P K CONSTRUCTION L5 |
|---|---|---|---|---|---|---|---|---|
| 10.00 | EXCAVATION-From grade level upto 1.5m de | 870 | CuM | 260 ₹2,26,200 | 375 ₹3,26,250 | 190 ₹1,65,300 Lowest | 235 ₹2,04,450 | 240 ₹2,08,800 |
| 20.00 | Excavation in Road-Road level upto 1.75m | 2,367 | CuM | 270 ₹6,39,090 | 400 ₹9,46,800 | 230 ₹5,44,410 Lowest | 250 ₹5,91,750 | 260 ₹6,15,420 |
| 30.00 | Backfilling around foundations, plinth, | 738 | CuM | 150 ₹1,10,700 Lowest | 250 ₹1,84,500 | 205 ₹1,51,290 | 155 ₹1,14,390 | 200 ₹1,47,600 |
| 40.00 | Repair /Reconstruction (of excavated Roa | 1,911 | CuM | 300 ₹5,73,300 | 3,200 ₹61,15,200 | 625 ₹11,94,375 | 175 ₹3,34,425 Lowest | 2,900 ₹55,41,900 |
| 50.00 | Sand filling under the UG pipe as per co | 66 | CuM | 2,200 ₹1,45,200 | 1,600 ₹1,05,600 | 980 ₹64,680 Lowest | 1,185 ₹78,210 | 1,800 ₹1,18,800 |
| 60.00 | EARTH DISPOSAL-Surplus within plant boun | 353 | CuM | 250 ₹88,250 | 300 ₹1,05,900 | 225 ₹79,425 | 220 ₹77,660 | 120 ₹42,360 Lowest |
| 70.00 | EARTH DISPOSAL-Surplus outsid plant boun | 235 | CuM | 300 ₹70,500 Lowest | 750 ₹1,76,250 | 375 ₹88,125 | 475 ₹1,11,625 | 350 ₹82,250 |
| 80.00 | LEAN CONCRETE (PCC 1:4:8 M7.5)- sleeper, | 34 | CuM | 6,700 ₹2,27,800 | 5,888 ₹2,00,192 | 6,500 ₹2,21,000 | 4,925 ₹1,67,450 | 4,700 ₹1,59,800 Lowest |
| 90.00 | LEAN CONCRETE (PCC 1:4:8 M7.5)-RCC duct | 39 | CuM | 6,900 ₹2,69,100 | 6,000 ₹2,34,000 | 7,000 ₹2,73,000 | 5,140 ₹2,00,460 | 4,700 ₹1,83,300 Lowest |
| 100.00 | FOUNDATION CONCRETE-above with M-30 grad | 162 | CuM | 7,000 ₹11,34,000 Lowest | 9,500 ₹15,39,000 | 8,100 ₹13,12,200 | 7,815 ₹12,66,030 | 10,500 ₹17,01,000 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
12 Dec 2020, 11:00 amClosed
Kaveri Hazarika 9435703123
Numaligarh Refinery Limited
Construction and Drinking water works for Numaligarh Refinery Limited
2020_NRL_597054_1
OC10000377/KAV
Open Tender
Miscellaneous Services
Works
168 days
Numaligarh Refinery Limited
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1 L
Yes
Zoom Meeting
20 Jan 2021
13 Nov 2020
14 Dec 2020
13 Nov 2020
12 Dec 2020
13 Nov 2020
19 Nov 2020
Amount
EXCAVATION-From grade level upto 1.5m de
Excavation in Road-Road level upto 1.75m
Backfilling around foundations, plinth,
Repair /Reconstruction (of excavated Roa
Sand filling under the UG pipe as per co
EARTH DISPOSAL-Surplus within plant boun
EARTH DISPOSAL-Surplus outsid plant boun
LEAN CONCRETE (PCC 1:4:8 M7.5)- sleeper,
LEAN CONCRETE (PCC 1:4:8 M7.5)-RCC duct
FOUNDATION CONCRETE-above with M-30 grad
FOUNDATION CONCRETE-above with M-30-RCC
Supply and installation of 45mm dia PVC
DEFORMED/TMT STEEL BARS FOR CONCRETE REI
SUPPLY AND INSTALLATION OF ANCHOR BOLTS
FORM-WORKS FOR FOUNDATION CONCRETE
SURFACE TREATMENT OF FOUNDATION
NON-SHRINK GROUT FOR STRUCTURAL STEEL CO
NON-SHRINK GROUT for Cement grout 1:2
STRUCTURAL STEEL-Structural Steel includ
STRUCTURAL STEEL-Structural Steel Insert
Elec/Inst road crossing- 3" Pipe sleeves
Elec/Inst road crossing- 4" Pipe sleeves
Elec/Inst road crossing- 6" Pipe sleeves
Elec/Inst road crossing- 8" Pipe sleeves
Elec/Inst road crossing-PVC CONDUIT
Elec/Inst road crossing-WIRW MESH
ROOFING (CANOPY)
Grubbing, scrubbing & clearing the areas
Installation, Alignment, Testing and Co
FAB-CS-NIBR-HVY-Below 2"
FAB-CS-NIBR-HVY- 2"-6"
DYE PENETRANT TEST (DP)- Fabrication
ERC-CS-NIBR-Below 2"
ERC-CS-NIBR-Below 2"-6"
DYE PENETRANT TEST (DP)-Erection
GALV.-CS-THreaded-Below 2"
GALV.-CS-THreaded- 2"-3"
Non Metallic Piping-Below 2"& 2"-6"
PIPE SUPPORTS SUPPLY, FABRICATION & ERE
Painting of Pipes & Pipe Supports
Hook up to existing system and commissi
Construction Water Pump with Accessories
CS-PIP-1.5"-HVY Dimension Standard : IS
CS-PIP-2"-HVY Dimension Standard : IS-1
CS-PIP-3"-HVY Dimension Standard : IS-1
CS-PIP-4"-HVY Dimension Standard : IS-1
CS-PIP-6"-HVY Dimension Standard : IS-1
CS-GAT-1"-# 800Gate Valve, Dimension St
CS-GAT-1.5"-# 800Gate Valve, Dimension
CS-GAT-2"- # 150 Gate Valve, Dimens
CS-GAT-6"- # 150 Gate Valve, Dimens
CS-GLO-6"- # 150 Globe Valve, Dimen
CS-CHE-6"- # 150 Check Valve, Dimen
CS-BLF-1"- # 150Blind Flange, Dimensio
CS-BLF-1.5"- # 150Blind Flange, Dimens
CS-BLF-2"- # 150Blind Flange, Dimensio
CS-FLG-1"- # 150Flange, Dimension Stan
CS-FLG-1.5"- # 150Flange, Dimension St
CS-FLG-2"- # 150Flange, Dimension Stan
CS-FLG-3"- # 150Flange, Dimension Stan
CS-FLG-4"- # 150Flange, Dimension Stan
CS-FLG-6"- # 150Flange, Dimension Stan
CS-GAS-1"- # 150Gasket, Dimension Stan
CS-GAS-1.5"- # 150Gasket, Dimension St
CS-GAS-2"- # 150Gasket, Dimension Stan
CS-GAS-3"- # 150Gasket, Dimension Stan
CS-GAS-4"- # 150Gasket, Dimension Stan
CS-GAS-6"- # 150Gasket, Dimension Stan
CS-BOLT-1"-B16.5,A193, GR.B7/A194 GR.2H.
CS-BOLT-1.5"-B16.5,A193, GR.B7/A194 GR.2
CS-BOLT-2"-B16.5,A193, GR.B7/A194 GR.2H.
CS-BOLT-3"-B16.5,A193, GR.B7/A194 GR.2H.
CS-BOLT-4"-B16.5,A193, GR.B7/A194 GR.2H.
CS-BOLT-6"-B16.5,A193, GR.B7/A194 GR.2H.
CS-45E-2"-STDElbow- 45°, Dimension Stand
CS-45E-3"-STDElbow- 45°, Dimension Stand
CS-45E-4"-STDElbow- 45°, Dimension Stand
CS-45E-6"-STDElbow- 45°, Dimension Stand
CS-90E-1.5"- 80-XS Elbow- 90°, Dimension
CS-90E-2"-STDElbow- 90°, Dimension Stand
CS-90E-3"-STDElbow- 90°, Dimension Stand
CS-90E-6"-STDElbow- 90°, Dimension Stand
CS-ERE-3x1"- STD- 80-XS -Reducer- Ecce
CS-ERE-3x1.5"- STD- 80-XS -Reducer- Ec
CS-ERE-3x2"- STD- STD-Reducer- Eccen
CS-ERE-4x3"- STD- STD-Reducer- Eccen
CS-ERE-6x2"- STD- STD-Reducer- Eccen
CS-ERE-6x3"- STD- STD-Reducer- Eccen
CS-ERE-6x4"- STD- STD-Reducer- Eccen
CS-BR90-3x3"-STD-STD-Straight Tee, Dime
CS-BR90-6x6"-STD-STD-Straight Tee, Dime
CS-BR90-3x1.5"-STD-80-XS -Socket weld co
CS-BR90-3x2"-STD-STD-Weldolet, Dimension
CS-BR90-4x2"-STD-STD-Weldolet, Dimension
CS-BR90-4x3"-STD-STD-Reducing Tee, Dime
CS-BR90-6x0.75"-STD-80-XS -Socket weld c
CS-BR90-6x1"-STD-80-XS -Socket weld coup
CS-BR90-6x1.5"-STD-80-XS -Socket weld co
CS-BR90-6x2"-STD-STD-Weldolet, Dimension
CS-BR90-6x3"-STD-STD-Weldolet, Dimension
CS(GAV)-PIP-0.5"-HVY Dimension Standard
CS(GAV)-PIP-0.75"-HVY Dimension Standard
CS(GAV)-PIP-1"-HVY Dimension Standard :
CS(GAV)-PIP-1.5"-HVY Dimension Standard
CS(GAV)-PIP-2"-HVY Dimension Standard :
CS(GAV)-PIP-3"-HVY Dimension Standard :
CS(GAV)-GAT-3"-PN 1.6 Gate Valve, Dimen
CS(GAV)-GLO-0.5"-Class 2 Globe Valve,
CS(GAV)-GLO-0.75"-Class 2 Globe Valve,
CS(GAV)-GLO-1"-Class 2 Globe Valve, Di
CS(GAV)-GLO-3"-PN 1.6 Globe Valve, Dime
CS(GAV)-CHE-3"-PN 1.6 Check Valve, Dime
CS(GAV)-FLG-0.5"-Flange Screwed, Dimensi
CS(GAV)-FLG-0.75"-Flange Screwed, Dimens
CS(GAV)-FLG-1"-Flange Screwed, Dimension
CS(GAV)-FLG-1.5"-Flange Screwed, Dimensi
CS(GAV)-FLG-2"-Flange Screwed, Dimension
CS(GAV)-FLG-3"-Flange Screwed, Dimension
CS(GAV)-BLF-0.5"-Blind Flange, Dimension
CS(GAV)-BLF-0.75"-Blind Flange, Dimensio
CS(GAV)-BLF-1"-Blind Flange, Dimension S
CS(GAV)-GAS-0.5"- # 150Gasket, Dimensi
CS(GAV)-GAS-0.75"- # 150Gasket, Dimens
CS(GAV)-GAS-1"- # 150Gasket, Dimension
CS(GAV)-GAS-1.5"- # 150Gasket, Dimensi
CS(GAV)-GAS-2"- # 150Gasket, Dimension
CS(GAV)-GAS-3"- # 150Gasket, Dimension
CS(GAV)-BOLT-0.5"-B16.5, A193, Gr.B7/A19
CS(GAV)-BOLT-0.75"-B16.5, A193, Gr.B7/A1
CS(GAV)-BOLT-1"-B16.5, A193, Gr.B7/A194
CS(GAV)-BOLT-1.5"-B16.5, A193, Gr.B7/A19
CS(GAV)-BOLT-2"-B16.5, A193, Gr.B7/A194
CS(GAV)-BOLT-3"-B16.5, A193, Gr.B7/A194
CS(GAV)-90E-0.5"-HVYElbow- 90°, Dimensio
CS(GAV)-90E-0.75"-HVYElbow- 90°, Dimensi
CS(GAV)-90E-1"-HVYElbow- 90°, Dimension
CS(GAV)-90E-1.5"-HVYElbow- 90°, Dimensio
CS(GAV)-90E-2"-HVYElbow- 90°, Dimension
CS(GAV)-90E-3"-HVYElbow- 90°, Dimension
CS(GAV)-45E-1"-HVYElbow- 45°, Dimension
CS(GAV)-45E-1.5"-HVYElbow- 45°, Dimensio
CS(GAV)-45E-2"-HVYElbow- 45°, Dimension
CS(GAV)-45E-3"-HVYElbow- 45°, Dimension
CS(GAV)-COUP-0.75"-HVYCoupling, Dimensio
CS(GAV)-COUP-1"-HVYCoupling, Dimension S
CS(GAV)-COUP-1.5"-HVYCoupling, Dimension
CS(GAV)-COUP-2"-HVYCoupling, Dimension S
CS(GAV)-COUP-3"-HVYCoupling, Dimension S
CS(GAV)-NIPPLE-0.5"-HVY Dimension Standa
CS(GAV)-NIPPLE-0.75"-HVY Dimension Stand
CS(GAV)-NIPPLE-1"-HVY Dimension Standard
CS(GAV)-ERE-1x0.5"-HVY-HVY-Reducer- Ecce
CS(GAV)-ERE-1x0.75"-HVY-HVY-Reducer- Ecc
CS(GAV)-ERE-1.5x0.5"-HVY-HVY-Reducer- Ec
CS(GAV)-ERE-1.5x0.75"-HVY-HVY-Reducer- E
CS(GAV)-ERE-2x1"-HVY-HVY-Reducer- Eccent
CS(GAV)-ERE-3x1"-HVY-HVY-Reducer- Eccent
CS(GAV)-ERE-3x1.5"-HVY-HVY-Reducer- Ecce
CS(GAV)-ERE-3x2"-HVY-HVY-Reducer- Eccent
CS(GAV)-BR90-1.5x1.5"-HVY-HVY-Straight T
CS(GAV)-BR90-3x3"-HVY-HVY-Straight Tee,
CS(GAV)-BR90-1x0.75"-HVY-HVY-Reducing Te
CS(GAV)-BR90-1.5x0.5"-HVY-HVY-Reducing T
CS(GAV)-BR90-1.5x0.75"-HVY-HVY-Reducing
CS(GAV)-BR90-2x0.75"-HVY-HVY-Reducing Te
CS(GAV)-BR90-3x0.75"-HVY-HVY-Reducing Te
CS(GAV)-BR90-3x1"-HVY-HVY-Reducing Tee,
CS(GAV)-BR90-3x1.5"-HVY-HVY-Reducing Tee
CS(GAV)-BR90-3x2"-HVY-HVY-Reducing Tee,
North East Engineering n Construction
MWIKHWM OWARY
ASSOCIATED WORKS INFRA PVT. LTD.
P K CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .