Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-AOC 19 1 69 3 PLOT NO 17 NEW ADARSH COLONY BIDAR 585 401 | BIDAR | KARNATAKA | 585401 | L1 | Accepted-AOC Due to L1 | |
| 2 | L2₹18.8 L+₹13,507.20 (0.73%)Rejected-Finance | L2 | Rejected-Finance Due to L2 | |
| 3 | L3₹19.1 L+₹42,987.20 (2.31%)Rejected-Finance | L3 | Rejected-Finance Due to L3 | |
| 4 | L4₹19.3 L+₹67,107.20 (3.60%)Rejected-Finance | L4 | Rejected-Finance Due to L4 |
Tender Value
Refer Docs
EMD Value
₹43,200
Closing Date
2 Feb 2021, 6:00 pmClosed
GE (AF) Bidar
GE AF Bidar, Naubad road, Bidar, Karnataka 585401
OUTSOURCING OF SERVICES FOR MAINTENANCE AND OPERATION OF AC PLANTS AND STANDBY DG SETS, UNDER GE AF BIDAR
2021_MES_409509_1
8269/E8
Open Tender
Miscellaneous Works
Item Rate
330 days
GE (AF) Bidar
As per NIT
7 documents required · 7 mandatory
₹500
GE (AF) Bidar
₹43,200
Yes
8 Mar 2021
5 Jan 2021
3 Feb 2021
5 Jan 2021
2 Feb 2021
19 Jan 2021
Amount
Maintenance and operation with One skilled Ref Mech per shift of 8 hours each for three shifts per day on all days including Sundays & Holidays for Package A/C plant of capacity (13.7 TR x 3). (Location : 41 ED). The unit comprising of : (i) Compressors - 03 Nos, (ii) AHU, (iii) Condensing unit, (iv) Cooling tower and Electrical control panel including refrigerant control system and maintaining of log sheet all as directed. Shift Timings:- (i) First shift:- 0600 hrs to 1400 hrs. (ii) Second Shift:- 1400 hrs to 2200 hrs. (iii) Third shift :- 2200 hrs to 0600 hrs
Maintenance and operation with One skilled Ref Mech per shift of 8 hours each for three shifts per day on all days including Sundays & Holidays for Package type A/C plant (3x16.5 TR) Tandom scroll compressor including DG set 100 KVA - 01 No when GESCOM supply fails. Location : Hawk Simulator (OLD FTD HALL). The unit comprising of : (i) Compressors, (ii) Condensing unit, (iii) Air cooled cooling coil, (iv) Air blower unit, necessary electrical and refrigerant control system etc, complete including maintaining of Log sheets all as directed. Shift Timings:- (i) First shift:- 0600 hrs to 1400 hrs. (ii) Second Shift:- 1400 hrs to 2200 hrs. (iii) Third shift:- 2200hrs to 0600 hrs.
Maintenance and operation with One skilled Ref Mech per shift of 8 hours each for two shifts per day on all days including Sundays & Holidays for Liquid chiller A/C plant of capacity (3x48 TR) at EEC/MEC Block and (3 x 33 TR) Capacity at Tettra School. Location : EEC/MEC and Tettra School Block. The unit comprising of : (i) Compressors, (ii) Condensing unit, (iii) AHU, (iv) Chiller water pumps 03 Nos, (v) Air blower unit, with necessary electrical and refrigerant control system etc, complete including maintaining of Log sheets all as directed. Shift Timings:- (i) First shift:- 0600 hrs to 1400 hrs. (ii) Second Shift:- 1400 hrs to 2200 hrs Note : (i) General cleanliness of AC Plants and DG Sets to be maintained. (ii) Monitor/Recording of following parameters i.e, Voltage Current, Eng Temp, Oil Presser, RPM for DG Sets and SP, DP, OP, RH and Temperatures of AC Plants as per format in Log sheets. (iii) Daily checking of DG Sets to be carried before starting. (iv) No of shifts in each installation will be as directed by Engr-in-charge.
Bismi Engineering
GOWRIPRIYA ENTERPRISES
M/s.Santosh Kotarki
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .