Loading…
Loading…
Tender Value
₹5.5 Cr
EMD Value
₹11.0 L
Closing Date
21 Sept 2026, 5:00 pmClosed
Krishan Kumar
Infra-I (Roads and Buildings)
Construction of Footpath for 45 mtr. wide road between Sector 8/19 and 18/19 and Special repair of 45 Mtr. Wide Master Road between sector 18-19 from Swarnaprastha School Rd towards Sector 18A in U/E Sonipat
2026_HRY_544264_1
2026EF266988 55D6 4D17 BB8A 53C8CAE206002248005
Open Tender
Civil Works
Works
290 days
Sonepat Sonepat
2 documents required · 2 mandatory
₹3,000
₹11.0 L
Yes
SMDA Office, Sonipat
21 Sept 2026
27 Aug 2026
22 Sept 2026
27 Aug 2026
21 Sept 2026
27 Aug 2026
4 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Analysis of rates for Speed bumps supply and fixing with apoxy adhesive and Bitumax material 1.Speed bumps made up of ABS Plastic size 250x350x50mm including cost of Carriage, cost of material and labour, cost of 4 No. nails of high tempering complete in all respect | 38 | Rmt. | 2,692.25 | ₹1,02,305.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_623790.xls
BOQ • 0.30 MB
1180CorrigendumforitemPaverfinisher_.pdf
PDF • 0.42 MB
1174corrigendumfortimeextention.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .