Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.7 LAccepted-AOC AIR FORCE ROAD GORAIMARI HALESHWAR TEZPUR SONITPUR ASSAM 784104 | SONITPUR | ASSAM | 784104 | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹22.3 L+₹1.2 L (5.55%)Rejected-Finance | L2 | Rejected-Finance OTHER THAN LOWEST BIDDER | |
| 3 | L3₹22.9 L+₹1.8 L (8.43%)Rejected-Finance VILLAGE GOROIMARI PO HALESWAR TEZPUR 784104 DIST SONITPUR ASSAM | SONITPUR | ASSAM | 784104 | L3 | Rejected-Finance OTHER THAN LOWEST BIDDER | |
| 4 | L4₹23.9 L+₹2.7 L (13.0%)Rejected-Finance | L4 | Rejected-Finance OTHER THAN LOWEST BIDDER | |
| 5 | L5₹24.2 L+₹3.1 L (14.4%)Rejected-Finance | L5 | Rejected-Finance OTHER THAN LOWEST BIDDER |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
6 Apr 2021, 6:00 pmClosed
GE AFS TEZPUR
GE AFS TEZPUR, PO- SLAONIBARI, DISTT- SONITPUR, ASSAM-784104
REPLACEMENT OF CONVENTIONAL HANGER LIGHTS TO LED LIGHTS IN TECHNICAL AREA AT TEZPUR UNDER GE (AF) TEZPUR
2021_MES_431450_1
8552/E8
Open Tender
Electrical and Maintenance Works
Item Rate
150 days
TEZPUR
Class D Cat b(i)
6 documents required · 6 mandatory
₹500
Yes
GE AFS TEZPUR
₹60,000
Yes
19 Apr 2021
18 Mar 2021
8 Apr 2021
18 Mar 2021
6 Apr 2021
31 Mar 2021
18 Mar 2021 - 24 Mar 2021
Amount
Supply and fix as in repair for 150W LED (CCT 5700-6500K) Highbay made of aluminium die case housing with powder coating, having excellent thermal management along with IP66 protection, with hanging hook/clamp as per site requirement complete all as specified and directed . With efficiency of 130lm/W and lumen output of >= 19500 lumen, and complete all as specified and as directed. All the LED fixtures shall be warrented for a period of 5 Years against servecibility / Performance NOTES : (i) Cost of necessary T&P items shall be deeemed to be included in the quoted rate (ii) The hanger/sunselter/REV/height may vary from 12m to 22m, the same shall be kept in mind before quoting rates. (iii) Cost up to 1m of 3core wire for connection are included in the quoted rate. (iv) Cost of necessary fittings and fixtures shall be included in the quoted rate. (v) Fittings shall be engraved/printed with the CA number as GE/AF/TEZ/_____ OF 2021-22 (vi) Necessary T&P shall be arranged by the contractor on his own for execution of the work, if the contractor opts to use departmental T&P, necessary T&P will be provided based on availability and Rs 100/- per light point will be recovered for using departmental T&P (vii) If the contractor wants to use departmental T&P, he will have to take prior permission before commencement of work in writting and recovery shall be made from the subsequent RAR as per rate mention in para (vi) above. SAFETY: As the work has to be executed at height of more than 10m, the contractor shall take all necessary precautions while execution and shall provide safety equipments to the labour. Make: CROMPTON : LHB11-150-CDL/60-HMP/ JAQUAR : LHBLDUL150XC/ WIPRO : LH21-222-090-57-XX (with efficiancy 140 Lm/W) HPL Equivalent with Makes as above
Supply and fix in repair for FLAME PROOF weatherproof Flying saucer model 100 W (CCT 5000-5700K, efficiancy >= 90Lm/W with total output >= 90000Lm) having 120 Degree light spreading angle and made in die cast aluminium alloy LM 6 suitable for Zone 1 & 2 , gas gap IIA & IIB, with IP65 protection along with a hanging hook/ clamp as per site requirement complete as specified and directed by Engr-in-charge. All the LED fixtures shall be warrented for a period of 5 Years against servecibility / Performance NOTES : (i) Cost of necessary T&P items shall be deeemed to be included in the quoted rate (ii) The hanger/sunselter/REV/height may vary from 12m to 22m, the same shall be kept in mind before quoting rates. (iii) Cost of necessary fitting and fixtures shall be included in the quoted rate. (iv) Fittings shall be engraved/printed with the CA number as GE/AF/TEZ/_____ OF 2021-22. (v) Necessary T&P Shall be arranged by the contractor on his own for execution of the work. If the contracot opts to use departmental T&P, necessary T&P will be provided based on availability and Rs 100/- per light point will be recovered for using departmental T&P. (vi) If the contractor wants to use departmental T&P, he will have to take prior permission before commencement of work in writting and recovery shall be made from the subsequent RAR as per rate mention in para (v) above. SAFETY: As the work has to be executed at height of more than 10m, the contractor shall take all necessaryprecautions while execution and shall provide safety equipments to the labour. Make: CROMPTON / SHYAM / SUDHIR
KAILSON
Singhs Construction
KUNDAN ENGINEERS AND BUILDERS
M.S. Construction
M/S A K MITRA
UNIQUE INDIA CONSTRUCTIONS
M/S TRADE CENTRE
S D POWER SOL
M/S S.S.Corporation
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .