Tender Value
₹10.7 L
EMD Value
₹21,337
Closing Date
29 Sept 2026, 6:00 pm5d left
Executive Engineer RnB kangan
Executive Engineer RnB kangan
Construction of Boundary Wall at PS Dashadi Wangath
2026_PWDJK_325361_5
NIT 40
Open Tender
Civil Works
Percentage
40 days
Kangan
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer RnB kangan
₹21,337
21 Sept 2026
21 Sept 2026
30 Sept 2026
21 Sept 2026
29 Sept 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 22.66 | Cum | 1,725.2 | ₹39,093.03 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge All kinds of soil : | 43.51 | Cum | 479.3 | ₹20,854.34 |
| 3 | Providing and Laying of Stone Soling hand packed including ramming, dressing and watering etc. with all cost and carriage of materials upto site of work complete. | 6.83 | Cum | 900 | ₹6,147 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 6.83 | Cum | 5,202.9 | ₹35,535.81 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 15.97 | Cum | 7,788.4 | ₹1,24,380.75 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 11.17 | Cum | 123.2 | ₹1,376.14 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 4.25 | Cum | 5,733.6 | ₹24,367.8 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Lintel, beams, plinth beams, girders, bressumers and cantilevers | 20.97 | Sqm | 577.55 | ₹12,111.22 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 22.3 | Sqm | 286.35 | ₹6,385.61 |
| 10 | Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: Nallah split stones in Cement mortar 1:6 (1 Cement : 6 coarse sand) | 75.2 | Cum | 6,857.45 | ₹5,15,680.24 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_1099070.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .