| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | ₹1.4 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | SABU C L1 | Sasidharan Nair K K L2 | Sreekumar C S L3 |
|---|---|---|---|---|---|---|
| 1.00Toilet Construction | ||||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1.46 | cum | 1,938.15 ₹2,829.7 Lowest | 2,127.7 ₹3,106.44 | 2,127.7 ₹3,106.44 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.46 | cum | 3,341.42 ₹1,543.74 Lowest | 3,667 ₹1,694.15 | 3,667 ₹1,694.15 |
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 1.21 | cum | 2,313.22 ₹2,796.68 Lowest | 2,539 ₹3,069.65 | 2,539 ₹3,069.65 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1.47 | cum | 327.35 ₹480.22 Lowest | 359 ₹526.65 | 365 ₹535.46 |
| 1.00 | OD518747/2025-2026:DRY RUBBLE MASONRY WORK - with out concrete levelling course, Using departmental stone work available stone including packing to compactness to lines and levels cost cost and conveyance of all materials and labour charges etc...complete as per direction from departmental officers | 0.81 | cum | 1,561.45 ₹1,264.77 Lowest | 1,715 ₹1,389.15 | 1,715 ₹1,389.15 |
| 1.01 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 15.48 | kg | 210.15 ₹3,253.12 Lowest | 230 ₹3,560.4 | 230 ₹3,560.4 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.4 | cum | 7,218.93 ₹2,865.92 Lowest | 7,932 ₹3,149 | 7,932 ₹3,149 |
| 1.01 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 0.65 | cum | 6,216.34 ₹4,028.19 Lowest | 6,831 ₹4,426.49 | 6,831 ₹4,426.49 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.32 | cum | 9,544.78 ₹3,092.51 Lowest | 10,488 ₹3,398.11 | 10,488 ₹3,398.11 |
Tender Value
₹1.5 L
EMD Value
₹3,733
Closing Date
12 Mar 2026, 10:00 amClosed
ASSISTANT ENGINEER
LIDEW SUB DIVISION KADUTHURUTHY BP
Constrution of attached toilet in the room of Block Panchayath Secretary
2026_LSGD_843783_2
12/AE/KDTYBK/25-26
Open Tender
Civil Works - Buildings
Item Rate
180 days
KADUTHURUTHY BP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
₹3,733
21 Sept 2026
5 Mar 2026
13 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Toilet Construction | |||||
| 1.001 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1.46 | cum | - | - |
| 1.002 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.46 | cum | - | - |
| 1.003 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 1.21 | cum | - | - |
| 1.004 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1.47 | cum | - | - |
| 1.005 | OD518747/2025-2026:DRY RUBBLE MASONRY WORK - with out concrete levelling course, Using departmental stone work available stone including packing to compactness to lines and levels cost cost and conveyance of all materials and labour charges etc...complete as per direction from departmental officers | 0.81 | cum | - | - |
| 1.006 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 15.48 | kg | - | - |
| 1.007 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.4 | cum | - | - |
| 1.008 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 0.65 | cum | - | - |
| 1.009 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.32 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
FORM.pdf
Other Document • 0.25 MB
BOQ_1424340.xls
BOQ • 0.32 MB
SBD.pdf
Tender Documents • 0.95 MB
PRELI.pdf
Additional Documents • 0.25 MB
AFFI.pdf
Other Document • 0.23 MB
PACT.pdf
Other Document • 0.23 MB
EPAY.pdf
Additional Documents • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .