Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC CHAUTHAI KULHI SINDRI ROAD JHARIA DHANBAD DHANBAD 828111 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828111 | ₹2.4 L | L1 | Accepted-AOC EXCLUDING GST |
| 2 | L2₹2.6 L+₹12,175 (5.00%)Rejected-Finance JHARIA ENA ISLAMPUR BHAGATDIH DHANBAD DHANBAD 828111 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828111 | ₹2.6 L+₹12,175 (5.00%) | L2 | Rejected-Finance QUOTED HIGHER THAN L1 |
| 3 | L3₹2.7 L+₹24,350 (10.0%)Rejected-Finance S O ABHISHEK DUBEY FLAT NO D 2 SRI RAMNIVASH APPARTMENT VEER DHANBAD | DHANBAD | DHANBAD | JHARKHAND | 828101 | ₹2.7 L+₹24,350 (10.0%) | L3 | Rejected-Finance QUOTED HIGHER THAN L1 |
Tender Value
₹2.9 L
EMD Value
₹3,600
Closing Date
29 Nov 2025, 5:00 pmClosed
AREA MANAGER EnM, CV AREA
BARAKAR, 713324
REPAIRING OF PL III PUMP 1600 GPM,180 MTR HEAD (M/P MAKE HORIZONTAL TURBINE PUMP) AT DAHIBARI OCP.
2025_BCCL_347773_1
BCCL/CV/XII/EnM/ TENDER/2025-26/77
Open Tender
Electrical and Maintenance Works
Percentage
10 days
Basantimata-Dahibari Colliery
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,600
10 Jul 2026
20 Nov 2025
1 Dec 2025
20 Nov 2025
29 Nov 2025
20 Nov 2025
20 Nov 2025 - 24 Nov 2025
DISMANTLING OF ALL COMPONENTS OF PUMPINCLUDING IMPELLER, BEARING, HOUSING FROM SHAFT AND COMPLETE ROTATING ELEMENT BY SKILLED AND SEMISKILLED MEN POWER
WOODEN PATTERN MAKING FOR DIFF. COMPONENT
CASTING AND MACHINING OF IMPELLER TO GET INTO PROPER SHAPE AND SIZE
BREEZING OF 2 IMPELLER, AS PER REQ. SHAPE
REPAIRING OF BEARING HOUSING BY CI WELDING MACHINING AS PER STD SIZE MAKING
NECK RING GM CASTING AND MACHINING AS PER STD SIZE
NECK BUSH GM CASTING AND MACHINING AS PER STD SIZE
SLEEVE BUSH STEEL SS CASTING AND MACHINIG
CASTING AND MACHINING OF BALANCE SHEETGM
CASTING AND MACHINING OF BEARING GM
CASTING AND MACHINING OF BALANCE VALVEGM
COST OF NEW SHAFT WITH KEY AND CHUCK NUT
C.I GLAND
TEST COG AND HOSE PIPE NIPPLE
COST OF DIFFERENT NUT BOLTS INCL. WASHER AS PER REQUIRED SIZE
COMPL. PUMP BODY CLEANING ASSEMBLING WITH RUBBER JOINT AND PROPER FITTING BY THE PUMP EXPERTISE, INCLUDING SEMI SKILLED AND SKILLED AND COMPLETE PAINTING
TRANSPORT BOTH SIDE INCL. LABOUR COST
LESS SCRAP GM
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.52 MB
BOQ_360483.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .