| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC PWD CONTRACTOR PADINHARAYIL HOUSE KODANGAD KONDOTTY MALAPPURAM 673638 | MALAPPURAM | KERALA | 673638 | ₹10.9 L | L1 | Accepted-AOC L1 HENCE ACCEPTED |
| 2 | L2₹11.5 LRejected-AOC | ₹11.5 L | L2 | Rejected-AOC L2 HENCE REJECTED |
| Sl No | Description | Qty | Unit | SHABEER K.K. L2 | JAFAR K K L1 |
|---|---|---|---|---|---|
| 1.00Detailed estimate | |||||
| 1.00 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 20.25 | cum | 57.02 ₹1,154.66 | 60 ₹1,215 |
| 1.00 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 7.14 | cum | 6,362.96 ₹45,431.53 | 6,000 ₹42,840 |
| 1.00 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 131.62 | cum | 7,363.01 ₹9.7 L | 7,000 ₹9.2 L |
| 1.00 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 1.05 | MT | 87,049.81 ₹91,663.45 | 80,000 ₹84,240 |
| 1.00 | OD62579/2025-2026:PVC WEEP HOLES- providing weep holes using 75 mm dia. PVC pipes working pressure 4 kg/s | 306 | metre | 110.66 ₹33,861.96 | 100 ₹30,600 |
| 1.01 | 13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material | 2.43 | cum | 2,496.85 ₹6,067.35 | 2,500 ₹6,075 |
| 1.01 | 3.17:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 10.8 | cum | 86.55 ₹934.74 | 100 ₹1,080 |
| 1.01 | 12.8.2.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - With Batching Plant, Transit Mixer and Concrete Pump - ( Without formwork) <br> | 0.62 | cum | 6,476.93 ₹4,048.08 | 6,000 ₹3,750 |
Tender Value
₹12.2 L
EMD Value
₹30,604
Closing Date
13 Feb 2026, 3:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, PWD Roads Sub Division Tirur
GENERAL-2025-26 Construction of Retaining wall at KM 0/500 LHS in Ayikkarappadi Olavattur Road in Kondotty LAC.-General Civil Work
2026_PWD_833998_1
D2-PWD/RB/TR/11295/2025 Dated.05.02.2026
Open Tender
Civil Works - Roads
120 days
Kondotty
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
₹30,604
Yes
28 Mar 2026
6 Feb 2026
16 Feb 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
Detailed estimate
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
OD62579/2025-2026:PVC WEEP HOLES- providing weep holes using 75 mm dia. PVC pipes working pressure 4 kg/s
13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
3.17:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
12.8.2.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - With Batching Plant, Transit Mixer and Concrete Pump - ( Without formwork) <br>
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1402851.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf