SUPERITNTENDING ENGINEER
Dismantling old protection wall and providing new protection wall with chain-link fencing and concentration coil and Trimix road at Nadiad Store under Nadiad Division office
315091
Tender Notice No.MGVCL/NADIAD STORE/NDR DIVISION /Civil/26-27/01
Open
Power/Energy Projects/Products/Services
Kheda
2 documents required · 2 mandatory
₹1,770
MGVCL, Circle Office, Nadiad
₹42,900
18 Jun 2026
18 Jun 2026
18 Jun 2026
9 Jul 2026
18 Jun 2026
No Qty. Rate Unit Amount S.O.R. Code
Demolition including stacking of serviceable materil
1 as and disposal of unserviceabl ematerials with all 5.00 1020.60 CMT
lead and lift. (i) R.C.C. work
Demolition and disposal of unserviceable materials 20001A
with all lead and lift.(i) Lime concrete.
Demolition of Brickwork and stone masonry
including stacking of serviceable materil as and 20003B
disposal of unserviceable materials with all lead and
lift.(ii)InCement Mortar.
Dismentling steel work including distempering and
stacking the materials with all lead and lift.
Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful materials
and disposing off the excavated stuff upto 50 Meter
lead.(B) Dense or Hard soil
Providing and laying cement concrete 1:4:8 (1-
Cement : 4- coarse sand : 8- hand broken stone
6 aggregates 40 mm nominal size) and curing 146.00 2653.67 CMT 387435.82 05004A
complete excluding cost of formwork in (A)
Foundation and Plinth
Filling available excavated earth (excluding rock) in
trenches. plinth, sides of foundations etc. in layers
not exceeding 20 cm. in depth consolidating each
disposited layer by ramming and watering.
Filling in foundation and plinth with murrum or
watering, ramming and consolidating etc. complete.
Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost of
9 formwork and reinforcement for reinforced concrete 15.00 3914.94 CMT 58724.10 05024AA
work in (A) Foundations, footings, Base of columns
and Mass concrete
Providing and laying controlled cement concrete
M.200 exposed work with curing etc.complete
including the cost of formwork but excluding the
cost of reinforcement forR.C.C.work
in(B)COLUMNS:(ii)Havingcross-sectional area more
than 0.08Sq.M and upto 0.18 Sq.M
Providing and laying controlled cement concrete M
200 exposed work with curing etc. complete
including the cost of formwork but excluding the
cost of reinforcment for R.C.C. work in (A) BEAMS :
(iii) Having cross sectional area more than
Providing and laying ordinary cement
concrete1:2:4(1-Cement2-coarse sand:4-graded
stone aggregates 20 mm nominal size)forR.C.C lintel
including finishing smooth with,curing etc.complete
including the cost of formwork but excluding the
cost of reinforcement.
Providing TMT Bar FE 500D reinforcement for R.C.C.
13 work including bending, binding and placing in 10080.00 75.46 Kg 760636.80 05014C
position complete upto floor two level
Brick work using common burnt clay building bricks
having crushing strength not less 35 kg. / sq. cm. in
14 40.00 3981.21 CMT 159248.40 06002BA
foundation and plinth in cement mortar 1:6 (1 -
Cement : 6 - Fine sand) Conventional Bricks
20 mm thick sand faced cement plaster on walls
upto height 10 metres above ground level consisting
15 of 12mm thick backing coat of C.M.1:3(1-cement :3- 320.00 332.33 SMT
sand) and 8 mm thick finishing coat of C.M.1:1(1-
cement:1-sand) etc. complete.
Finishing wall with weather proof exterior emulsion
paint on wall surface(two coats)to give an required
16 shape even shade after thoroughly brushing the 320.00 113.4 SMT 36288.00
surface to remove all dirt,and remains of loose
powdered materials.etc complete
Providing and fixing 450 mm effective dia.(after
laying) Hot dip galvenised twin Razor type
concencenterina coil with all required clips ,pins,etc.
as per specification. Concentrina coil shall be fixed to Nadiad CO item
M.S. Angles with RBT (Razor barbed tape) with help no.160
of u- nails with split pin. Rate quoted on running meter
of compound wall basis ( 1) Effective dia. of coil after
steching ahall be 600mm.
Supply & laying of suppotr RBT(Razor barbed tape)
Nadiad CO item
18 with the help of u-nails/split pin. Rate shall be quoted 400.00 18.75 Rmt
on running meters of RBT laid.
Providing and fixing Chain link roll having 10 gauge
wire & 50x50mm jali with appropriate height as
Nadiad CO item
19 directed and fixing the same to MS angle and 160.00 270 Smt
providing and fixing MS flat bedding by means of MS
nut & bolts etc. complete as directed by EIC.
Providing, fabrication and erecting in position MS
hollow pipe section of required size for FRP shed
structure/ stair case including welding the section as Nadiad CO item
per instruction and drawing making holes & one coat no.76
of red oxide & oil painting of approved shade and
make as directed by E.I.C
Labour Charge for disposed of debris material with RMU plinth item
21 20.00 700 Tractor Trip
use of tractor Market Rate no.13
Providing supplying and spreading / mixing "
CHAPDUR" chemical for smooth and luster finish of
top surface of road (Note: Chemical is to be used as Nadiad CO item
per manufacturers specification and instruction given no.153
by EIC having consumption of 4.00 KG per SMT
Providing and Laying Controlled cement concrete
M20 for trimix RCC excluding the cost of
reinforcement & including of using 125micron
polythene sheet at base of concrete, using approved
quality polyester fiber (12mm) during mixing of
cement concrete(@125gm per bag) and or as per
manufacturer's specification including preparing the
sub base with form work of M.S Chanel of required
size to maintain level and slope of concrete with
using surface vibrator, finishing the surface with
power floater and trove, light brooming on the
Nadiad CO item
23 surface with providing construction joints of size 10 156.00 6656.4 Cmt
mm wide 25mm deep in transverse direction @4.5m
C/C with sealing the same with approved quality
bitumen sealent and providing expansion joints of
size 25 mm width and upto through depth of
concrete using 25mm thick Dura Board HD-100 of
approved quality and sealing the same with
approved quality bitumen sealent at 40meter C/C
and or as directed using concrete cutter machine
with necessary equipments, labors tools tackles etc
complete as dircted by EIC.
Rolling and consolidation of soiling
including filling in depression which occcue
24 1300.00 22.14 Smt 28782.00 SOR:
during process with power roller 8 tonne to
Collecting, Carting and unloading materia
LS LIKE crushed stone greet, chipping, quarry
spill/grit, etc. of approved quality from and
spreading in required layers leveling etc. camber
25 195.00 1100 Cmt 214500.00 Nadiad CO
including applying road roller for compaction etc.
completed etc. completed with all lead and lift
ad directed by E.I.C.
Total amount
Total amount
Total Amount With GST
Total Amount With GST
JE Civil DE Civil EE Civil
Nadiad Circle Nadiad Circle
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2. Speci Electl Item.pdf
3. Civil Tech Specification.pdf
4.RFP Document.pdf
scrutinized sch B Nadiad RSO Trimix road.pdf
Final Tender Notice and Commercial Sepcification.pdf
Download all tender documents and submit your bid