Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
31 May 2021, 6:55 pmClosed
Executive Engineer Mech. Irrig. Div. Baramulla
Mech. Irrig. Div. Baramulla
Electrical work to be carried out at Lift Irrigation Scheme Zehanpora.
2021_IFC_125064_2
eNIT 09 of 2021-22
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Baramulla
Please refer Tender documents.
5 documents required · 5 mandatory
₹50
Yes
Executive Engineer Mech. Irrig. Div. Baramulla
Exempted
Mech. Irrig. Div. Baramulla
12 Jun 2021
24 May 2021
1 Jun 2021
24 May 2021
31 May 2021
24 May 2021
28 May 2021
Amount
a. Disconnecting the 250KVA H.T transformer from HT and LT side cable lowering down from the bed, then shifting of transformer from lift station to road side with the help of manual labours, tools and tackles, then loading in private load carrier , then shifting to workshop and un-loading of same at workshop for necessary repairs b. Opening the lid of the transformer draining transformer oil detaching the core assembly from bush rods and other clamps taking out the core assembly by means of chain pulley block and checking and assessing the damages. c. Providing and fitting of fresh HT coils as per the sample out of aluminium wire. (12 coils @ 6kg/coil approximately (72kgs). d. Providing and fitting of fresh LT coils as per the sample out of aluminium wire. (03 coils @ 18kg/coil approximately (54kgs). e. Filtration of old existing T-oil (250litre) & filling of fresh T-oil Hundred litre for topping. f. P/f of insulation material such as card board, lath ride paper, cotton tape, PVC paper, cork sheets, varnishing, gasket, nuts and bolts etc. g. Deducting the cost of old scrape @ 80% (100.8kg) Shifting of the 250KVA Transformer after taking necessary repairs at workshop by loading in private load carrier, unloaded at road side , then shifting from road side to lift station with the help of manual labours, tools and tackles, then testing of the transformer on full load at site.
M/s SAJID ENGINEERING WORKS
M/S NEW BUHROO ELECTRICAL AND MECH ENGG WORKS
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .