| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-Finance | ₹7.3 L | L1 | Accepted-Finance Done |
| 2 | L2₹7.3 L+₹400.23 (0.06%)Accepted-Finance VILL SAR GOTRA PO ATTARA TEHSIL NURPUR DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | ₹7.3 L+₹400.23 (0.06%) | L2 | Accepted-Finance Done |
| 3 | L3₹9.6 L+₹2.4 L (32.5%)Accepted-Finance | ₹9.6 L+₹2.4 L (32.5%) | L3 | Accepted-Finance Done |
| Sl No | Description | Qty | Unit | KEHAR SINGH L3 | Rahul Kumar L1 | Salinder kumar L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth,1.5 m in width as wellas10 sqmon plan) including getting out and disposal of excavated earth lead up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 28.9 | Cum | 550 ₹15,895 | 400 ₹11,560 | 270 ₹7,803 Lowest |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 fine sand : 10 gradedstone aggregate 40 mm nominal size) up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 2.31 | Cum | 5,000 ₹11,550 | 4,500 ₹10,395 Lowest | 5,500 ₹12,705 |
| 3.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 7.44 | Cum | 9,000 ₹66,960 | 7,200 ₹53,568 Lowest | 7,900 ₹58,776 |
| 4.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand) : 3graded stone aggregate 20 mm nominal size) up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 6.71 | Cum | 9,000 ₹60,390 | 7,200 ₹48,312 Lowest | 8,500 ₹57,035 |
| 5.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 1.73 | Cum | 9,200 ₹15,916 | 7,800 ₹13,494 Lowest | 8,500 ₹14,705 |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns,
etc. for mass concrete up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 34.1 | sqm | 600 ₹20,460 | 370 ₹12,617 Lowest | 430 ₹14,663 |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders,
bressumers and cantilevers up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 51.34 | sqm | 670 ₹34,397.8 | 400 ₹20,536 Lowest | 530 ₹27,210.2 |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for :Columns, Pillars, Piers, Abutments, Posts and Struts up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 55.68 | sqm | 760 ₹42,316.8 | 400 ₹22,272 Lowest | 570 ₹31,737.6 |
| 9.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 2,608.75 | K.g | 126 ₹3,28,702.5 | 96 ₹2,50,440 | 85 ₹2,21,743.75 Lowest |
| 10.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 18.56 | Cum | 9,700 ₹1,80,032 | 8,000 ₹1,48,480 | 7,500 ₹1,39,200 Lowest |
Tender Value
₹5.7 L
EMD Value
₹11,500
Closing Date
20 Jul 2026, 5:00 pmClosed
Chairman, Temple Trust Shri Naina Devi Ji
Office of the Chairman, Temple Trust
Providing and fixing lift along Matri Anchal Building for Temple Trust Shri Naina Devi ji,Distt. Bilaspur (H.P.) (a) (Sub Head Civil work of lift)
2026_NDTT_138909_1
No.TTSND.Cons (T)-15-(21)-40/2026-3564 to 3576 Dated 01.07.2026
Open Tender
Civil Works
Item Rate
Shri Naina Devi Ji
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
Yes
Chairman, Temple Trust Shri Naina Devi Ji
₹11,500
Yes
26 Aug 2026
13 Jul 2026
22 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth,1.5 m in width as wellas10 sqmon plan) including getting out and disposal of excavated earth lead up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 28.9 | Cum | 1.25 | ₹36.13 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 fine sand : 10 gradedstone aggregate 40 mm nominal size) up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 2.31 | Cum | 2.25 | ₹5.2 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 7.44 | Cum | 3.25 | ₹24.18 |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand) : 3graded stone aggregate 20 mm nominal size) up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 6.71 | Cum | 4.25 | ₹28.52 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 1.73 | Cum | 5.25 | ₹9.08 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns,
etc. for mass concrete up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 34.1 | sqm | 6.25 | ₹213.13 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders,
bressumers and cantilevers up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 51.34 | sqm | 7.25 | ₹372.22 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :Columns, Pillars, Piers, Abutments, Posts and Struts up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 55.68 | sqm | 8.25 | ₹459.36 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 2,608.75 | K.g | 9.25 | ₹24,130.94 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) up to all mtr lifts and lift complete in all resct as per directon and best satisfaction of Engineer-in-charge. | 18.56 | Cum | 10.25 | ₹190.24 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
SBD.pdf
Tender Documents • 2.01 MB
BOQ_205741.xls
BOQ • 0.40 MB
GST.pdf
Additional Documents • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .