Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹52.7 L
EMD Value
₹1.1 L
Closing Date
9 Dec 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Yes (up to 4 members)
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
ELECTRICAL
13 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number ofyears prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet as per Indian Railways Standard General Condition of Contract, April 2022 along with up to date Advance Correction Slip (ACS).
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender as per Indian Railways Standard General Condition of Contract, April 2022 along with up to date Advance Correction Slip (ACS). The definition of similar nature of work is ''Repair / Overhauling / Maintenance / Dismantling / Cleaning of any Equipment / M&P in any Shed / Depot / Workshop of Indian Railway / Metro'' as per HQ/NR letter No. NR-HQ0ELEC(LOCO)/65/2020 Dated: 15.10.20224.
12 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
GCC April 2022 with up to date correction slip is applicable over for this tender. It should be the duty of the contractor to make himself duly informed if any correction and amendment of the said GCC is made up to date. No objection shall be taken by the contractor on the ground that he was not aware of such amendments and corrections of the said special conditions of the contracts or any of them.
'Disconnection, Removal and other minor attentions of Auxiliary Motors of 3-Phase Electric Locomotives' at Electric Loco shed- Ghaziabad.
230-TRS-GZB-2026-27-09~NR
230-TRS-GZB-2026-27-09
Open
Works - General
36 Months
Ghaziabad, Uttar Pradesh
₹0
₹1.1 L
12 Nov 2026
12 Nov 2026
25 Nov 2026
30 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 20,01,961.35 | ||
| — | — | — | 3,54,365.78 | ||
| Disconnection, Removal and Fitment of Oil Cooler Blower of Auxiliary Motors in 3- Phase Loco as per scope of work. | — | 818.00 | — | — | |
| — | — | — | 4,16,923.69 | ||
| Disconnection, Removal and Fitment of Traction motor Blower of Auxiliary Motors in 3-Phase Loco as per scope of work. | — | 683.00 | — | — | |
| — | — | — | 1,75,154.41 | ||
| Disconnection, Removal and Fitment of Machine Room Blower of Auxiliary Motors in 3-Phase Locos as per scope of work. | — | 593.00 | — | — | |
| — | — | — | 2,60,678.28 | ||
| Disconnection, Removal and Fitment of Scavenger for Traction Motor Blower of Auxiliary Motors in 3-Phase Locos as per scope of work. | — | 788.00 | — | — | |
| — | — | — | 1,93,293.4 | ||
| Disconnection, Removal and Fitment of Scavenger for Machine Room Blower of Auxiliary Motors in 3-Phase Locos as per scope of work. | — | 818.00 | — | — | |
| — | — | — | 4,20,842.08 | ||
| Disconnection, Removal and Fitment of Main Compressors of Auxiliary Motors in 3- Phase Locosas per scope of work. | — | 548.00 | — | — | |
| — | — | — | 18,681.67 | ||
| Disconnection, Removal and Fitment of Baby Compressor of Auxiliary Motors in 3- Phase Locos as per scope of work. | — | 259.00 | — | — | |
| — | — | — | 97,122.04 | ||
| Disconnection, Removal and Fitment of Transformer Pump of Auxiliary Motors in 3- Phase Locos as per scope of work. | — | 548.00 | — | — | |
| — | — | — | 64,900 | ||
| Disconnection, Removal and Fitment of Cab Fan in 3- Phase Locos as per scope of work. | — | 250.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
NITNo.230-TRS-GZB_2026-27-09.pdf
ATTACHMENT
ETDNo.230-TRS-GZB_2026-27-09.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .