Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
19 Aug 2022, 3:00 pmClosed
SE EDC BHADOHI
office of SE EDC Bhadohi.
The Repair and overhauling of 11 KV VCB in EDD I bhadohi.
2022_PVVNV_709714_2
29/EDC(BH)/2022-23
Open Tender
Electrical Works
Lump-sum
240 days
BHADOHI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE EDD I BHADOHI
₹2,000
30 Aug 2022
25 Jul 2022
20 Aug 2022
25 Jul 2022
19 Aug 2022
25 Jul 2022
Repairing and Overhauling
Repairing and Overhauling of Various make 11 KV VCB/OCB Trolly installed at various 33/11 KV Sub Station under the jurisdiction of EDD bhadohi and installation of repaired Trolly with binding of bus bar, Cable Jointing, Replacement of wornout parts along with checking of control wiring and proper earthing. There after testing of control circuit and energisation of 11 kv switch gear pannel and restoration of supply in presence of concerning JE/SDO.(Vaccum bottle and cable box shall be provided by the department.And all other material and consumables required for overhauling of breakers/ switch gear for restoration of supply shall be provided by the Agency.)
ST Pole
Rest Line Material
11 KV XLPE Cabel 3x70sq mm
11 KV PP Metering Cubical
11 KV O/D, D/P CT/PT Double Metering unit
25 KVA Transformer
100 KVA Transformer
Erection of Single PCC Pole with all fitting and Pole Grouting
Erection of Single ST Pole with all fitting and Pole Grouting
Erection of Double PCC Pole with all fitting and Pole Grouting
Erection of Double ST Pole with all fitting and Pole Grouting
Earthing of Pole
Spreading of Conductor, Mounting on Insulator Tightening with sagging and binding on each pole HT Line 3 phase 3 wire
Mounting of 11/0.4 KVA Transformer with all fitting require in LT Substation complete work 25 KVA Transformer on Double Pole
Mounting of 11/0.4 KVA Transformer with all fitting require in LT Substation complete work 100 KVA Transformer on Double Pole
Stay Erection Grouting nozzling and Tightening work
Fitting of T-OFF Channel Size 125x65x1300 mm with Pole
11 KV Cabel Jointing
Erection of 11 KV PP Metering Cubical
Mounting of 11 KV O/D, D/P CT/PT Double Metering unit complete work
Replacement by 3 km Raccon Cond after Dismentling of JarJar ACSR Weasal Cond and Cartage of Scrap from Site to Store Bhadohi
Dismentling of 0.140 Line km of Dog and Cartage of Scrap from Site to Store Bhadohi
M/S HARI OM ASSOCIATE
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .