Loading…
Loading…
44 live30 closing this weekmost from Directorate of Local Bodies UP and U P Irrigation Department (Civil)
44 results • Latest
Widening and Strengthening of Madhosingh Mahathua Asnaav Mushilatpur road
Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 12.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 15.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 17.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 20.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 22.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 25.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 27.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 30.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 35.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 40.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 45.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 50.0 H. P
PATCH WORK OF SERVICE ROAD OF GYANPUR MAIN CANAL FROM KM 39.400 TO KM 43.900
PATCH WORK OF SERVICE ROAD OF GYANPUR MAIN CANAL FROM KM 47.000 TO KM 50.880
PATCH WORK OF SERVICE ROAD OF GIRDKOT DY FROM KM 5.600 TO 7.600, 9.100 TO 9.350 and 11.150 TO 11.350
RENOVATION OF SERVICE ROAD FROM KM 9.874 TO KM 10.497 OF DEEGH DY, KM 13.869 TO KM 14.494 OF DEEGH DY and KM 14.500 TO KM 15.623 OF DEEGH DY.
Ganga nadi Rampur ghat pontoon pull ka bandhane v kholane ka karya
RENEWAL OF SERVICE ROAD OF GARAURA DY FROM KM 4.800 TO KM 5.800
RENEWAL OF SERVICE ROAD OF GANDHI MINOR FROM KM 0.500 KM 1.530
Facility Management Services - LumpSum Based - UNIVERSITY CAMPUS; Supply of answer copy; Consumables to be provided by service provider (inclusive in contract cost)
PADDY 2026-27 AND WHEAT 2027-28 HANDLING WORK CENTER IN PCF BHADOHI
Development work of 52 Bigha Pond at N.P. Suriyavan in District - Bhadohi.
Operation and Maintenance Of Electrical Systems/Electrical Installations - work for overhauling of 145 KV SF 6 Circuit Breaker at 132 KV Sub Station Aurai and 132 KV Sub Station Chauri under ETD IV Varanasi
Professional Painting Service - Work of Paint Primer and Paint Brush at 132 KV Sub Station Bhadohi Gopiganj Chauri Aurai Kachhawa and 220 KV Sub Station Bhaodhi under ETD IV Varanasi; Work of Paint Primer and Paint Brush at 132 KV Sub Station Bhadohi..
REPAIRING OF DAMAGE POLE AND WIRE IN THE AREA OF EDD GOPIGANJ
REPAIRING OF DAMAGE POLE AND WIRE IN THE AREA OF EDD GOPIGANJ
REPAIRING OF DAMAGE POLE AND WIRE IN THE AREA OF EDD BHADOHI
REPAIRING OF DAMAGE OF POLE AND WIRE IN THE AREA OF EDD BHADOHI
Nagar Panchayat Khamaria Ward No 4 main market from Kade Gupta to Rajesh Barwal drain RCC cover and CC road on both sides first lighting construction work
Nagar Panchayat Khamaria Ward No 4 main market from Shyamdhar Gautam to Kailash Gautam construction of drain RCC cover and CC road on both sides first lighting work
Nagar Panchayat Khamaria Ward No 5 Main Market Bartar from Nanhak Halwais house to Pullus house, drain RCC cover and CC road on both sides first lighting construction work
All in One PC (V2) (Q2), Entry and Mid Level Laptop - Notebook (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2) (3 (3 ))
Construction of 200mm PVC pipe Nali and Interloking Road from Gama to Rajkumar and munnur bhonu in ward no 08 shivaji nagar.
Construction of 200mm PVC pipe Nali and Zigzac Interloking Road from Pakhandu to Jallu Giri in ward no 08 shivaji nagar.
Construction of 200mm PVC pipe Nali and CC Road from Vinod Tiwari to Kallu sharma in ward no 09 Azad nagar.
Construction of 200mm PVC pipe Nali and CC Road from shamshir shop to jitendra singh in ward no 04 Nehru nagar.
Installation of LED street light cabel poles 7meter in ward no 05 lohiya nagar ward no 09 azad nagar ward no 07 Abbas nagar.
Construction of 200mm PVC pipe Nali and Zigzac Interloking Road from Hasnain ke hata to Pathraha Road in ward no 05 Lohiya nagar.
Installation of LED street light cabel poles 7meter in ward no 01 gandhi nagar ward no 02 shahid nagar ward no 08 shivaji nagar.
Construction of 200mm PVC pipe Nali and Interloking Road Lallu to devanand in ward no 08 shivaji nagar.
Construction of 200mm PVC pipe Nali and CC Road from Angad to Hanuman mandir and Bal vidhya school in ward no 02 shahid nagar.
Construction of 200mm PVC pipe Nali and Interloking Road from Gaza singh to ranjit in ward no 08 shivaji nagar
Construction of 200mm PVC pipe Nali and Interloking Road from Paras to paggal in ward no 02 shahid nagar.
MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 15 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 18 M HEAD SUBMERSIBLE PUMPSET, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 21 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 24 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 27 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 30 M HEAD SUBMERSIBLE PUMPSET, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 33 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 36 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 42 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 48 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 54 M HEAD SUBMERSIBLE PUMPSETS
Construction of 200mm PVC pipe nali and tatsambandhit work from Ramgulam to hafij kiran in ward no 07 Abbas nagar.
Construction of 200mm PVC pipe nali and tatsambandhit work from Paras kuwa to Damodar shaw in ward no 02 Shahid nagar.
Construction of 200mm PVC pipe nali and tatsambandhit work from Manik chand to gali in ward no 03 Patel nagar.
Construction of 900mm Hume pipe nala work from Kamarujamal to Naim in ward no 05 Lohiya nagar.
Construction of 200mm PVC pipe nali and tatsambandhit work from Nasir to Abbas building in ward no 11 Ashok nagar.
Construction of 200mm PVC pipe nali and tatsambandhit work from Jitlal to Sanauwar in ward no 03 Patel nagar.
Construction of 200mm PVC pipe nali and tatsambandhit work from Ramawtar to Lorik in ward no 02 Shahid nagar.
Construction of 200mm PVC pipe nali and tatsambandhit work from Arvind gautam to Jhingai in ward no 01 Gandhi nagar.