Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
121 live51 closing this weekmost from Chief Engineer Mirzapur Zone PWD Mirzapur and Directorate of Local Bodies UP
121 results • Latest
Extension of the drinking water pipeline in Ward No. 11 Hariyanv City Mohalla Harirampur from the house of Amjad Ansari passing by the house of Aabdi Ansari up to the house of Mayank Jaiswal.
Work on the extension of the drinking water pipeline in Ward No. 13 Bazar Sardar Khan Mohalla Jallapur from the Taj Mahal Company premises up to Israel house.
Extension of the drinking water pipeline in Ward No. 03 Mathurapur Mohalla Raimalpur Gautam Basti starting from the house of Ramji Gautam passing by the house of Suresh Gautam and extending up to the house of Phulchand.
Extension of the drinking water pipeline in Ward No. 03 Mathurapur Mohalla Raimalpur Bhitwa from Indrajit house to Azad Gautam house and from Santlal Gautam house to Mishrilal Gautam house.
Work on the extension of the drinking water pipeline in Ward No. 11 Hariyanv City Bind Basti from the house of Kanhaiya Bind to the house of Bechan Bind.
Extension of the drinking water pipeline in Ward No. 11 Hariyanv City spanning from the house of Shashi Kanojia past the houses of Mohan Yadav Sabhajit Pal Umashankar Pal and Dinesh Pal up to the house of Munna Vishwakarma.
Catering service (Event Based) - Dinner; Veg; Special Thali
Extension of the drinking water pipeline in Ward No. 01 Kushiyara Mohalla Hariyanv from the house of Sadhu Prajapati to the house of Nanhe Saroj and from the house of Rajesh Prajapati to the house of Ramnaresh Prajapati.
Extension of the drinking water pipeline in Ward No. 02 Mamdevpur from Bhullu Prasad Saroj house to Rajaram house from Mohan house to Haridas house and from Mohan house to Ramdhar house.
Extension of the drinking water pipeline in Ward No. 07 Daropur Mohalla Zahidpur from the house of Jiledar Singh passing by the house of Shukul Vishwakarma and extending up to the house of Kallar Prajapati.
Construction of an underground drain and an interlocking paver road in Ward No. 16 Rajpura Mohalla Revda Paraspur extending from Bansrajs house passing by Radheshyam house and reaching Ajit Kumar Yadav house.
Construction of a boundary wall on the premises of Ayushman Arogya Mandir Kukrauthi in Ward No. 06 Dudwa Kukrauthi.
Construction of an underground drain and an interlocking-tile road extending from the house of Advocate Lolarknath Yadav in Ward No. 14 Chhedibir Mohalla Kushiyara to the house of Nirankarlal Yadav on Gyanpur Road.
Construction of an underground drain and an interlocking paver road in Ward No. 18 Bazar Salawat Khan Kashipur extending from the house of Ajmer Ansari passing by the house of Shakeel Ahmed and reaching the house of Raju.
Construction of an interlocking road within the premises of Ayushman Arogya Mandir Kukrauthi in Ward No. 06 Dudwa Kukrauthi.
Construction of an underground drain and an interlocking-tile road in Ward No. 14 Chhedibir extending from Buniyaads house to Haji Mehndis house.
Installation of a 1 HP submersible pump and extension of the drinking water pipeline within the premises of the Ayushman Arogya Mandir in Kukrauthi Ward No. 06
Tentage Service Lumpsum Based - 120000; Floorings, Lighting, Tent Rentals, Decoration, Theme Based Installation, Furniture & Equipment Rentals, Climate Control, Safety Measures, Dismantling and Removal, 120000
Azoxystrobin 11% + Tebuconazole 18.3% Suspension Concentrate (V2) (Q2)
Design Engineering and Procurement for Construction of New District Jail 574 Prisoner Capacity at District Bhadohi Uttar Pradesh India on EPC mode
RFP for the Balance work for widening to four lane of Bhadohi to Varanasi section of NH 731B from design km 49.200 to Km 89.285 on percentage rate basis in the State of Uttar Pradesh.