Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹83.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹83.6 L+₹63,726.73 (0.77%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹84.7 L+₹1.7 L (2.04%)Admitted-Finance 163 AGARWAL MARKET SUBHASH NAGAR SUBHASH NAGAR BAREILLY UTTAR PRADESH 243001 | BAREILLY | UTTAR PRADESH | 243001 | L3 | Admitted-Finance |
Tender Value
₹83.9 L
EMD Value
₹1.7 L
Closing Date
17 Feb 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER
NAGAR NIGAM BAREILLY
Construction of a drain on both sides of the road from Sai Dharamkanta to Jagdeep Chikaras house near Limra Plyboard in Ward-29.
2026_DOLBU_1109825_1
360/CE/CD/25-26 (1 To 20) Sr No 14 Tender List 35 Date-22.01.2026
Open Tender
Civil Works
Percentage
180 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹9,912
Bareillye-tender.com
₹1.7 L
4 Apr 2026
28 Jan 2026
17 Feb 2026
28 Jan 2026
17 Feb 2026
28 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling of old damage brick work and stone work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M. (S.I.No.692) | 28.65 | CUM | 610 | ₹17,476.5 |
| 1.02 | Excavation in foundation in soil mix kankar Loam, Clay or sand including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30.0m from the foundation trencches.( S.I. No.251+258a = 180+20% = 216) mud and fual condition (Excluding Royalty) | 1,183.5 | CUM | 195 | ₹2,30,782.5 |
| 1.03 | Disposal of debris upto 5km qty Same as item no. item no. 3 | 828.45 | CUM | 183.5 | ₹1,52,020.58 |
| 1.04 | Providing and laying cement concrete in 1:4:8 (1 cement : 4 coarse sand : 8 stone ballast 40 mm gauge) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/ I. (S.I No. 281) | 153.72 | CUM | 6,980 | ₹10,72,965.6 |
| 1.05 | RCC 1:2:4 with cement c'sand stone grit of 4 cm gauge in raft foundation and footing xcluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work. | 169.88 | CUM | 7,915 | ₹13,44,584.37 |
| 1.06 | RCC 1:1.50:3 with cement c'sand stone grit of 20 mm gauge in Columns excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work. | 311.85 | CUM | 8,700 | ₹27,13,095 |
| 1.07 | RCC 1:2:4 with cement c'sand stone grit of 20 mm gauge in Slabs excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work. | 8.4 | CUM | 8,260 | ₹69,384 |
| 1.08 | Mild steel or Iron for plain work such as reinforced concrete brought to proper shape as necessary including its bending with supply of steel with overlaps & wastage also required for proper completion of the work as directed by E/I. | 314.25 | QTL | 8,870 | ₹27,87,397.5 |
| 1.09 | Providing laying C.C with 2cm gauge approved stone ballast, approved coarse sand and cement in praportion of 1:2:4 including supply of all materials, labour and T&P etc required for proper completetion of the work. | 3.15 | CUM | 7,645 | ₹24,081.75 |
| 1.1 | First class B/w in 1:4 Cement C'sand mortor in F/P including supply of all meterial labour T&P etc required for proper completion of work. | 2.29 | CUM | 5,330 | ₹12,205.7 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 29.39 MB
BOQ_2049614.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .