Tender Value
₹4.5 Cr
EMD Value
₹4.5 L
Closing Date
3 Oct 2026, 6:00 pm6d left
Executive Engineer, Salinity Control Division, Porbandar
Strengthening Of Spillway Portion And Raising With Modification Of Guide Bund At Fodala Scheme.
341444
06 Of 2026-27
Open
Civil Works - Others
Works
Porbandar
9 documents required · 8 mandatory · 1 optional
₹6,000
Executive Engineer, Salinity Control Division, Porbandar
₹4.5 L
3 Sept 2026
3 Sept 2026
3 Sept 2026
3 Oct 2026
3 Sept 2026
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for this work. For building works specifications for building are to
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Item of excavation in hard rock to be operated as per tender item and hard rock
received shall be issued to contractor at the SOR rate Rs. 224.08 per cum as per
operated quantity. The royalty if any shall be paid by contractor on such quantity
of hard rock to relevant department the stuff of hard rock irrespective of voids or
quarry spalls shall be taken by contractor. The excavated hard rock issued fully
on fully on USR to contractor.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book figures
of specifications)
1 Jungle clearance of specified 151620.00 Sqmt. 4.10
category and bushes for canal/dam
work as directed with depositing
material etc complete.
(Excluding tree of grith above
mt).(Upto 2 YEAR (C) For Heavy
2 Excavation in all sort of strata and
formations incl. depositing the
unuseful excavated stuff as and
where directed incl sorting and
stacking useful materials as
directed upto lead upto 200 mt and
all lift etc. complete incl.
(A) In Overburden Incl. HARD 1890.00 Cum 79.00
(B) In SOFT ROCK 9700.00 Cum 176.00
3 Excavation of HARD ROCK by using 38790.00 Cum 716.00
rock breaker only and without using
any type of explosive and removal of
material by means of wedging and
chiseling including depositing the
excavated stuff as and where
directed with 200 mt lead and all lift
including sorting and stacking of
useful materials as directed etc
4 Earthwork with selected earth 8680.00 Cum 295.00
brought from out side borrow area
including watering ramming,
Compaction with slope compactor
roller in uniform layer of specified
thickness (up to 20cm) as directed
by engineering incharge and all lead
and lift etc complete.
5 Dismantling Stone/brick Masonry & 33.00 Cum 616.00
Stacking of useful and unuseful
material from the dismantled
materials as directed etc complete.
(a) In cement mortar
6 Prov. & Laying in position 610.00 Cum 3816.00
"NOMINAL MIX' cement concrete
using cement, sand and crushed
aggregate by mass and machine mix
for C.C. work incl. necessary
formworks centering scaffolding
compaction by mechanical
vibrator,curing as directed with all
lead & lift etc complete.(FOR
GENERAL PURPOSE)
C) Concrete grade 1 :2 :4 and MSA-
7 Prov. & Laying in position 800.00 Cum 5267.00
Controlled cement concrete using
cement, sand and crushed aggregate
by mass and machine mix for
R.C.C/C.C. work including
necessary formworks centering
scaffolding compaction by
mechanical vibrator,curing as
directed with all lead & lift etc
complete. Excluding the cost of
reinforcement(FOR COLUMN AND
BEAM) A) Concrete grade M-25 and
8 Providing,cutting,bending,binding 43.00 M.T. 76574.00
and fixing in position as per
drawing.TMT BAR, reinforcement
for R.C.C. works and anchor bars
incl cost of black annealed 16 to
BWG M.S .. Wire etc.complete with
all lead and lift. (B) Fe500
9 Providing and laying 45cms Thk 3030.00 Sqmt. 773.00
rubble pitching with 20 cms
murrum and 20 cms sand layers as
base of inverted graded filter and
without header stone but incl.hand
packing trimming & dressing of
slopes etc complete.
10 Dewatering of foundation area, pits 2250.00 Hp/ 27.00
& trenches of head works and allied Hr
works with diesel or electrical
pumping arrangement incl cost of
pipe lines, other materials, labors
etc complete as directed with all
11 Providing epoxy plaster 6 to 8mm 150.00 Sqmt. 2483.00
min.thickness incl filling of all
potholes/ditches with epoxy
mortar upto req. depth by using
resin:hardner:aggregates
confirming to IS-9162 in proportion
0.7:0.3:6.5, by weight on exposed
damaged old and rough surface of
spillway/canal strs with proper
application of necessary primer
coat of resin and hardener in
proportion of 2:1 by weight
confirming to IS-9197 to give
proper bond between old surface
and epoxy plaster incl necessary
cleaning, cheeping of old surface
incl scaffolding, tools bars for the
job with labor incl all lead and lift
etc complete in all condition dry and
Total Amount :-
Total Amount :-
In words (Four Crore Fifty Four Lac Forty Two Thousand One Hundred Fifty Two
I/We am/are willing to carry out the work at….......................% above/below percent (Should be
written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For Above INR 50 Cr. )
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book figures
of specifications)
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… By
(C)Net Tendered Amount (A-B) (in figure) ……………………………… EE
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analys`is Standard Cement Consumption has been taken as
per Govt. G.R.: No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender.
Signature of Contractor Executive Engineer
Salinity Control Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Fodala SBD Final Online Upload 2.pdf
Tender Notice No. 06 of 2026-27.pdf
BOQ Fodala scheme.pdf
Corrigendum-1 Fodal scheme.pdf
CORRIGENDUM
BOQ Fodala scheme.pdf
CORRIGENDUM
Fodala SBD Final Online Upload 2.pdf
CORRIGENDUM
Tender Notice No. 06 of 2026-27.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .