Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87,367.20Accepted-AOC PANCHAYAT SIJUA PAN THANA DUGDA BOKARO BOKARO 828307 JHARKHAND INDIA | DHANBAD | JHARKHAND | 828307 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹76,631.40+₹2,591.40 (3.50%)Rejected-Finance DUGDA BOKARO | L2 | Rejected-Finance Reject L-2 Bidder | |
| 3 | L3₹94,771.20+₹20,731.20 (28.0%)Rejected-Finance JANTA NAGAR PO BOKARO THERMAL DIST BOKARO JHARKHAND PIN 829107 | BOKARO | JHARKHAND | 829107 | L3 | Rejected-Finance Reject L-3 Bidder |
Tender Value
Refer Docs
EMD Value
₹1,000
Closing Date
23 Jan 2024, 6:55 pmClosed
Area Manager (ENM), Barora Area
ENM Department, Office of the General Manager, Barora Area, Nawagarh, Dhanbad
Dismantling, transporting shifting and installation of 1.5MVA,11KV/3.3KV power transformer with all arrangement from old place to the new place in Fire Area workshop for controlling of power supply to the mine of Damoda Colliery
2024_BCCL_298394_1
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2023-24/456
Open Tender
Electrical and Maintenance Works
Percentage
10 days
DAMODA COLLIERY BARORA AREA
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,000
13 Jun 2024
12 Jan 2024
24 Jan 2024
12 Jan 2024
23 Jan 2024
12 Jan 2024
12 Jan 2024 - 15 Jan 2024
eProcurement System of Coal India Limited Created By: PRAWEEN KUMAR DAS Created Date/Time: 29-Jan-2024 10:30 AM Tender Title: Dismantling, transporting shifting and installation of 1.5MVA,11KV/3.3KV power transformer with all arrangement from old place to the new place in Fire Area workshop for controlling of power supply to the mine of Damoda Colliery Tender ID: 2024_BCCL_298394_1
Tender Inviting Authority: Area Manager (E&M), Barora Area
Name of Work: Dismantling, transporting shifting and installation of 1.5MVA,11KV/3.3KV power transformer with all arrangement from old place to the new place in Fire Area workshop for controlling of power supply to the mine of Damoda Colliery
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 M/S BAIDYANATH SINGH(GSTN-20ALPPK7549A1Z9) 74040.00 3.50 76631.40 Seventy Six Thousand Six Hundred and Thirty One
2.00 S K ELECTRICALS(GSTN-20AXQPK2407E1ZX) 74040.00 0.00 74040.00 Seventy Four Thousand Fourty
3.00 Y K ENTERPRISES(GSTN-NA) 74040.00 28.00 94771.20 Ninty Four Thousand Seven Hundred and Seventy One
Lowest Amount Quoted BY: S K ELECTRICALS(74040.00)
BOQ Summary Details Tender Title: Dismantling, transporting shifting and installation of 1.5MVA,11KV/3.3KV power transformer with all arrangement from old place to the new place in Fire Area workshop for controlling of power supply to the mine of Damoda Colliery Tender ID: 2024_BCCL_298394_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 S K ELECTRICALS 74040.00 L1
2 M/S BAIDYANATH SINGH 76631.40 L2
3 Y K ENTERPRISES 94771.20 L3
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .