Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹9.9 L
EMD Value
₹19,820
Closing Date
17 Oct 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Construction Division Leh
Office of the Executive Engineer Construction Division Leh
Widening and upgradation of approach road to 60mtr span suspension bridge at Changa.(Under District Plan
2025_PWD_17524_3
CDL 111 of Leh of 2025-26
Open Tender
Civil Works - Others
Percentage
60 days
leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Executive Engineer Construction Division Leh
₹19,820
6 Oct 2025
6 Oct 2025
18 Oct 2025
6 Oct 2025
17 Oct 2025
6 Oct 2025
Earth work in excavation by manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m, as directed by Engineer-in charge. All kinds of soil
Dumping stone in horizontall level including cost of stone and complete job
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a) 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
b) 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C work Includng straightening, cutting , bending, placing, in position and binding all complete Thermo- Mechanically Treated bars of grade Fe-500D or more . (150kg/cum)
Centering and shuttering including strutting, propping etc. and removal of form for: a) Columns, pillars, piers, abutments, posts and struts.
b) Suspended floors, roofs, landings, balconies and access platform
c) Edges of slabs and breaks in floors and walls Above 20 cm wide
Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers,and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressingup inembankments for roads, flood banks, marginal banks and guide banks or fillingupgrounddepressions, lead upto 50 m and lift upto 1.5 m : All kinds of soil
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50metres lead as per direction of Engineer - in- charge.
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Carriage of Material from source to site by M.T including loading, unloading and complete Job. A) Cement and steel ------------10km
b) Sand ----------- 12Kms
c) Stone agg-----------12Kms
d) Soiling stone-------08km
e) earth --------05km
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_42928.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .